L-20-236, LTR Licensee Outline Submittal
From kanterella
Jump to navigation
Jump to search
ML21137A198 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 02/18/2021 |
From: | Tony Brown FirstEnergy Nuclear Operating Co |
To: | Gregory Roach NRC/RGN-III |
Roach G | |
Shared Package | |
ML20136A251 | List: |
References | |
L-20-236 | |
Download: ML21137A198 (3) | |
Similar Documents at Davis Besse | |
---|---|
Category:Letter type:L
MONTHYEARL-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024
[Table view]Submittal of Quality Assurance Program Manual, Revision 30 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 2024-08-27 Category:License-Operator MONTHYEARML24045A0722024-02-14014 February 2024
[Table view]Form 5.1-1 Post Examination Check Sheet IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 ML24045A0702024-01-29029 January 2024 Form 1.3-1 Examination Security Agreement-Post Examination ML24045A0712024-01-29029 January 2024 Form 2.1-1 Examination Prep Checklist L-24-029, Post-Exam Package Cover Letter2024-01-25025 January 2024 Post-Exam Package Cover Letter ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 ML24045A0382023-12-14014 December 2023 Form 2.3-4 Written Exam Quality Checklist ML24045A0162023-12-14014 December 2023 Form 3.4-1 Events and Evolutions Checklist for Davis-Besse ML24045A0342023-12-14014 December 2023 Form 2.3-2 Operating Test Quality Checklist ML24045A0152023-12-14014 December 2023 Form 2.3-1 Exam Outline Quality Checklist for Davis-Besse ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 L-22-074, Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-15015 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22118A3302022-02-24024 February 2022 Ile ES-201-1 ML22115A1732022-02-24024 February 2022 Ile ES-301-3 ML22115A1762022-02-24024 February 2022 Ile Proposed Exam Submittal Letter L-21-267 ML22108A2412022-02-24024 February 2022 Ile ES-201-2 NRC Written Outline Only ML22108A2442022-02-24024 February 2022 Ile ES-201-2 ML22108A2492022-02-24024 February 2022 Ile Forms ES-301-5 ML22108A2512022-02-24024 February 2022 Ile Outline Submittal Letter L-21-219 ML22118A7952022-02-24024 February 2022 Ile Forms ES-201-3 L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 ML22027A5092022-01-27027 January 2022 Operator Licensing Examination Approval ML21181A4052021-07-0101 July 2021 Confirmation of Initial License Examination ML21110A5512021-04-19019 April 2021 GFE Results, March 2021 IR 05000346/20213012021-03-15015 March 2021 NRC Initial License Examination Report 05000346/2021301 ML21137A1832021-02-18018 February 2021 ES-201-2 Written Outline ML21137A2112021-02-18018 February 2021 ES-301-1 ML21137A3202021-02-18018 February 2021 ES-403-1 ML21137A2592021-02-18018 February 2021 ES-301-3 ML21137A3302021-02-18018 February 2021 Ile Outline Review Comments Licensee Responses ML21137A1962021-02-18018 February 2021 ES-301-5 L-20-236, LTR Licensee Outline Submittal2021-02-18018 February 2021 LTR Licensee Outline Submittal ML21137A3172021-02-18018 February 2021 ES-201-1 L-20-271, LTR Licensee Exam Submittal2021-02-18018 February 2021 LTR Licensee Exam Submittal ML21137A2672021-02-18018 February 2021 ES-301-6 ML21137A2942021-02-18018 February 2021 Proposed in Plant JPMs ML21137A3512021-02-18018 February 2021 Sim JPM ML21137A2922021-02-18018 February 2021 Proposed Admin JPMs ML21137A2232021-02-18018 February 2021 ES-401-2 3 ML21137A3412021-02-18018 February 2021 Admin JPM ML21137A3502021-02-18018 February 2021 Scenarios ML21137A2992021-02-18018 February 2021 Proposed Written Exam ML21137A3422021-02-18018 February 2021 Inplant JPM ML21137A3212021-02-18018 February 2021 L-21-025 Post Exam Submittal Cover Letter ML21137A2632021-02-18018 February 2021 ES-301-4 ML21137A3322021-02-18018 February 2021 ES-401-4 ML21137A2812021-02-18018 February 2021 ES-401-6 ML21137A2952021-02-18018 February 2021 Proposed Scenarios 2024-02-02 Category:Part 55 Examination Related Material MONTHYEARML24045A0722024-02-14014 February 2024
[Table view]Form 5.1-1 Post Examination Check Sheet IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 ML24045A0712024-01-29029 January 2024 Form 2.1-1 Examination Prep Checklist ML24045A0702024-01-29029 January 2024 Form 1.3-1 Examination Security Agreement-Post Examination L-24-029, Post-Exam Package Cover Letter2024-01-25025 January 2024 Post-Exam Package Cover Letter ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 ML24045A0152023-12-14014 December 2023 Form 2.3-1 Exam Outline Quality Checklist for Davis-Besse ML24045A0342023-12-14014 December 2023 Form 2.3-2 Operating Test Quality Checklist ML24045A0382023-12-14014 December 2023 Form 2.3-4 Written Exam Quality Checklist ML24045A0162023-12-14014 December 2023 Form 3.4-1 Events and Evolutions Checklist for Davis-Besse ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 ML22108A2412022-02-24024 February 2022 Ile ES-201-2 NRC Written Outline Only ML22108A2442022-02-24024 February 2022 Ile ES-201-2 L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 ML22118A3302022-02-24024 February 2022 Ile ES-201-1 ML22108A2512022-02-24024 February 2022 Ile Outline Submittal Letter L-21-219 ML22115A1732022-02-24024 February 2022 Ile ES-301-3 ML22108A2492022-02-24024 February 2022 Ile Forms ES-301-5 ML22118A7952022-02-24024 February 2022 Ile Forms ES-201-3 ML22115A1762022-02-24024 February 2022 Ile Proposed Exam Submittal Letter L-21-267 ML22027A5092022-01-27027 January 2022 Operator Licensing Examination Approval ML21181A4052021-07-0101 July 2021 Confirmation of Initial License Examination IR 05000346/20213012021-03-15015 March 2021 NRC Initial License Examination Report 05000346/2021301 ML21137A2942021-02-18018 February 2021 Proposed in Plant JPMs ML21137A3502021-02-18018 February 2021 Scenarios ML21137A3532021-02-18018 February 2021 Written Exam ML21137A1832021-02-18018 February 2021 ES-201-2 Written Outline ML21137A2952021-02-18018 February 2021 Proposed Scenarios ML21137A3322021-02-18018 February 2021 ES-401-4 ML21137A2192021-02-18018 February 2021 ES-301-2 ML21137A3342021-02-18018 February 2021 ES-401-9 ML21137A2962021-02-18018 February 2021 Proposed Sim JPMs ML21137A2992021-02-18018 February 2021 Proposed Written Exam ML21137A2922021-02-18018 February 2021 Proposed Admin JPMs ML21137A1962021-02-18018 February 2021 ES-301-5 L-20-236, LTR Licensee Outline Submittal2021-02-18018 February 2021 LTR Licensee Outline Submittal ML21137A2262021-02-18018 February 2021 ES-D-1 ML21137A2672021-02-18018 February 2021 ES-301-6 ML21137A2632021-02-18018 February 2021 ES-301-4 ML21137A3412021-02-18018 February 2021 Admin JPM ML21137A1892021-02-18018 February 2021 ES-201-2 L-20-271, LTR Licensee Exam Submittal2021-02-18018 February 2021 LTR Licensee Exam Submittal ML21137A3172021-02-18018 February 2021 ES-201-1 ML21137A3312021-02-18018 February 2021 ES-301-7 ML21137A3302021-02-18018 February 2021 Ile Outline Review Comments Licensee Responses ML21137A2592021-02-18018 February 2021 ES-301-3 ML21137A2112021-02-18018 February 2021 ES-301-1 ML21137A2232021-02-18018 February 2021 ES-401-2 3 2024-02-02 |