L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report | 1 March 2023 | Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report | |
ML22292A023 | 18 October 2022 | Framatome Inc., Document ANP-2718-007Q1NP, Revision 0, Response to Request for Additional Information on Appendix G Pressure-Temperature Limits for 52 EFPY for Davis-Besse Nuclear Power Station - First Energy Nuclear Operating Company | |
L-22-229, Response to Request for Additional Information Regarding Request to Withhold Information in Framatome Inc. Document ANP-2718P-007 from Public Disclosure & Affidavit | 13 October 2022 | Response to Request for Additional Information Regarding Request to Withhold Information in Framatome Inc. Document ANP-2718P-007 from Public Disclosure & Affidavit | |
L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan | 5 July 2022 | Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan | |
L-22-124, Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building | 12 May 2022 | Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building | |
L-22-059, Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 | 21 March 2022 | Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 | |
ML22081A147 | 11 March 2022 | R22 (March 2022) - Steam Generator Tube Inspection Discussion Points 11 March 2022 | Grab sample |
ML22049A066 | 10 February 2022 | Response to NRC Questions from 2/1/2022 Regulatory Conference on Failed Field Flash Selector Switch | |
L-21-266, Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 | 27 January 2022 | Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 | Boric Acid Loop seal Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Earthquake Pressure boundary leak Through-Wall Leak Power change |
ML21130A219 | 10 May 2021 | Request for Additional Information Regarding Steam Generator Tube Inspection Reports (EPIDs L2020-LRO-0055, L-2020-LRO-0082, and L2020-LRO-0083) | |
ML21088A344 | 29 March 2021 | Final Supplemental Response to Nuclear Regulatory Commission Generic Letter 2004-02 | Boric Acid Coatings |
L-21-101, Final Supplemental Response to Nuclear Regulatory Commission Generic Letter 2004-02 | 29 March 2021 | Final Supplemental Response to Nuclear Regulatory Commission Generic Letter 2004-02 | Boric Acid Coatings |
L-21-030, Response to Request for Additional Information Regarding an Amendment to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Facility Technical Specifications (EPID L-2020 | 27 January 2021 | Response to Request for Additional Information Regarding an Amendment to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Facility Technical Specifications (EPID L-2020 | |
L-20-313, Response to Request for Additional Information Regarding Request for Exemption -Part 73 Force-on-Force | 7 December 2020 | Response to Request for Additional Information Regarding Request for Exemption -Part 73 Force-on-Force | Exemption Request Pandemic Coronavirus |
L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force | 23 June 2020 | Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force | Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation Surveillance Frequency Control Program Fire Protection Program |
L-20-155, Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040) | 6 May 2020 | Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040) | |
L-20-041, Response to Request for Additional Information Regarding License Amendment Request to Extend Containment Leakage Test Interval | 3 February 2020 | Response to Request for Additional Information Regarding License Amendment Request to Extend Containment Leakage Test Interval | |
L-19-182, Response to RAI Regarding an Application for Order Consenting to Transfer of License | 2 August 2019 | Response to RAI Regarding an Application for Order Consenting to Transfer of License | Incorporated by reference |
L-19-178, Response to Request for Additional Information Regarding Request for Approval of Decommissioning Quality Assurance Program for the Davis-Besse Nuclear Power Station | 16 July 2019 | Response to Request for Additional Information Regarding Request for Approval of Decommissioning Quality Assurance Program for the Davis-Besse Nuclear Power Station | |
L-19-166, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request for Proposed Post-Shutdown Emergency Plan | 8 July 2019 | Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request for Proposed Post-Shutdown Emergency Plan | Minimum staff |
L-19-160, Response to Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications | 26 June 2019 | Response to Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications | |
L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. | 25 May 2018 | Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. | Aging Management |
L-18-125, Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/0 | 2 May 2018 | Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/0 | Exemption Request |
L-18-085, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | 2 April 2018 | Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | Hot Short Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation FLEX Fire Protection Program |
L-18-061, Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement | 16 March 2018 | Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement | Exemption Request |
L-17-372, Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) | 23 December 2017 | Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) | |
L-17-253, Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | 9 October 2017 | Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | Safe Shutdown Packing leak Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operator Manual Action Emergency Lighting FLEX Thermoset Design basis earthquake Exemption Request Continuous fire watch Fire Protection Program Fire Watch Early Warning Fire Detection |
L-17-233, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukishima Dai-ichi Accident | 2 August 2017 | High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukishima Dai-ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Seismically rugged Earthquake |
L-17-189, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | 16 June 2017 | Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coatings FLEX Large early release frequency Cable Tray Ignition Maintenance Rule Program Fire Protection Program |
ML17163A412 | 8 June 2017 | Areva, ANP-3542Q1NP, Revision 0, Response to NRC Request for Additional Information on Time-Limited Aging Analysis for the DB-1 Reactor Vessel Internals. | Aging Management Earthquake |
L-17-158, Reply to Request for Additional Information Re License Renewal Commitment No. 42 | 12 May 2017 | Reply to Request for Additional Information Re License Renewal Commitment No. 42 | Weld Overlay |
L-17-070, Reply to Request for Additional Information Related to License Renewal Commitment | 22 February 2017 | Reply to Request for Additional Information Related to License Renewal Commitment | Weld Overlay |
L-16-371, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | 17 January 2017 | Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | Hot Short Fire Barrier Probabilistic Risk Assessment Coatings FLEX Thermoset Large early release frequency Cable Tray Ignition Fire Protection Program |
L-16-345, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Cnfpa) Standard 805 | 16 December 2016 | Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Cnfpa) Standard 805 | Hot Short Safe Shutdown Boric Acid Offsite Dose Calculation Manual Fire Barrier Internal Flooding Probabilistic Risk Assessment Coatings Operator Manual Action Multiple Spurious Operation FLEX Thermoset Foreign Material Exclusion Large early release frequency Power-Operated Valves Fire Protection Program Fire Watch Scaffolding |
L-16-323, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to CFR 50.54(f) Regarding Recommendation 2.1 of the Near Term Task Force Review of Insights from Fukushima Dai-inchi Accident | 9 December 2016 | Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to CFR 50.54(f) Regarding Recommendation 2.1 of the Near Term Task Force Review of Insights from Fukushima Dai-inchi Accident | |
L-16-291, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools | 1 November 2016 | Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools | |
L-16-279, Reply to Request for Additional Information Related to License Renewal Commitment 42 | 26 September 2016 | Reply to Request for Additional Information Related to License Renewal Commitment 42 | Earthquake |
L-16-123, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 23 September 2016 | Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | |
L-16-256, Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan | 6 September 2016 | Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan | Safe Shutdown Time of Discovery Health Physics Network High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
L-16-220, Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. | 20 July 2016 | Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
L-16-085, Request for Additional Information Response Related to Modification of Technical Specification 5.3.1, Unit Staff Qualifications. | 22 March 2016 | Request for Additional Information Response Related to Modification of Technical Specification 5.3.1, Unit Staff Qualifications. | |
L-16-079, Supplemental Information for License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | 7 March 2016 | Supplemental Information for License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 | Internal Flooding Probabilistic Risk Assessment Large early release frequency Fire Protection Program |
L-16-040, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage and Frequency Surveillance Requirements | 19 February 2016 | Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage and Frequency Surveillance Requirements | |
ML15299A143 | 19 October 2015 | Additional Information for the Advisory Committee on Reactor Safeaquards Review of the License Renewal Application, Including Enclosure a, Bechtel Affidavit | |
L-15-268, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage and Frequency Surveillance Requirements | 14 October 2015 | Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage and Frequency Surveillance Requirements | |
ML15280A287 | 6 October 2015 | Additional Information for the Advisory Committee on Reactor Safeguards Review of License Renewal Application | Tornado Generated Missile Earthquake |
L-15-263, Response to Request for Additional Information Related to Security Plan Changes | 17 August 2015 | Response to Request for Additional Information Related to Security Plan Changes | |
L-15-197, Response to Request for Additional Information Regarding a Request to Amend Technical Specification 5.5.15. Containment Leakage Rate Testing Program | 26 June 2015 | Response to Request for Additional Information Regarding a Request to Amend Technical Specification 5.5.15. Containment Leakage Rate Testing Program | Maintenance Rule Program Grace period |