ML21137A332

From kanterella
Jump to navigation Jump to search
ES-401-4
ML21137A332
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/18/2021
From: Gregory Roach
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Roach G
Shared Package
ML20136A260 List:
References
Download: ML21137A332 (1)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Facility: Davis Besse Nuclear Power Station Date of Exam 2/1/2021 to 2/5/2021 Tier / Randomly Reason for Rejection Group Selected K/A 3 G2.2.36 G2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

(CFR: 41.10 / 43.2 / 45.13) SRO - 4.2 SRO NRC written question 16 associated with Tier 2/Group 2 system 015 Nuclear Instrumentation and Tier 3 SRO NRC question 22 are both linked to K/A 2.2.36. One will have to be changed to minimize overlap.

Following Discussion with Chief Examiner:

Replaced Q22 with G2.2.11 Knowledge of the process for controlling temporary design changes.

(CFR: 41.10 / 43.3 / 45.13) SRO - 3.3 NUREG-1021, Revision 11