NUREG-1021, Revision 11 ES-401 Record of Rejected K/As Form ES-401-4 Facility: Davis Besse Nuclear Power Station Date of Exam 2/1/2021 to 2/5/2021 Tier /
Group Randomly Selected K/A Reason for Rejection 3
G2.2.36 G2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.
(CFR: 41.10 / 43.2 / 45.13) SRO - 4.2 SRO NRC written question 16 associated with Tier 2/Group 2 system 015 Nuclear Instrumentation and Tier 3 SRO NRC question 22 are both linked to K/A 2.2.36. One will have to be changed to minimize overlap.
Following Discussion with Chief Examiner:
Replaced Q22 with G2.2.11 Knowledge of the process for controlling temporary design changes.
(CFR: 41.10 / 43.3 / 45.13)
SRO - 3.3