Forwards Application for Amend to License DPR-59,revising Tech Spec to Reflect LPCI loop-selection-logic Mod & to Eliminate Redundant & Unnecessary Surveillance Testing by Making Terminology Used Consistent W/Existing Criteria
ML20247R727
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/31/1989
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247R733 List:
References
JPN-89-034, JPN-89-34, JPTS-80-011, JPTS-80-11, NUDOCS 8906070297
Download: ML20247R727 (3)


Text

_ - - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ .__-___ _ _ _-___________-_-_ _ _

!' C 123 Main Sucet White Plains, New Yot k 10601 4140316740

,eI ,

A NewWrkPbwer aesa c. a -

y 4pf Authority- bifalaff*"'

May 31,1989 JPN 89-034 U. S. Nuclear Regulatoy Commission

, Attention: Document Control Desk Mail Station P1-137 Washington,DC 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket 50-333 Proposed Changes to the Technical Specifications Regarding Low Pressure Coolant injection Pump Flow Surveillance and Demonstrate / Verify Terminology (JPTS-80-011)

References:

1. PASNY letter, J. P. Bayne, to T. A. Ippolito dated January 6,1981, (JPN-81-003), regarding proposed miscellaneous changes to the Technical Specifications.
2. NYPA letter, J. C. Brons to D. R. Muller dated December 24,1985, (JPN-85-092), regarding proposed miscellaneous changes to the Technical Specifications.
3. NYPA letter, W. Fernandez to NRC, dated March 20,1989, (JAFP-89-0214),

responds to NRC Region I inspection Report 50-333/88-29.

Dear Sir:

' This application proposes to revise the James A. FitzPatrick Nuclear Power Plant Technical Specifications to incorporate two distinct changes. The first change reflects the LPCI (Low Pressure Coolant Injecuon) loop-selection-logic modification installed during the Reload 1/ Cycle 2 refueling outage. The second change eliminates the need for redundant and unnecessary surveillance testing by making the terminology used consistent with existing operability criteria.

LPCI Pump Flow Surveillance The first change revises the specifications to reflect LPCI loop-selection-logic modifications installed during the Reload 1/ Cycle 2 refueling outage. Specifically, the minimum allowable LPCI pump surveillance test flow is revised to reflect the altered hydraulic characteristics of the LPCI {

system.

-00 8906070297 890531 PDR i

P ADOCK 05000333 i PDC 4 i

s

~ ,

' In Reference 1, the Authority submitted similar changes to the FitzPatrick Technical Specifications. Reference 1 was subsequently withdrawn by Reference 2. This amendment is one of the Technical Specification corrections committed to by the Authority in Reference 3.

Demonstrate / Verify Terminology The second change clarifies the use of the terms " demonstrate" and " verify." The consistent usage of these two terms will eliminate the need for redundant and unnecessary surveillance testing. The proposed terminology is consistent with existing Specification 4.0.C, Bases 4.0 A through 4.0.D, and an NRC Generic Letter on the term operable.

These changes are closely related to another proposed change on containment cooling mode requirements, (JPTS-84-006), submitted separately. The Authority suggests that the NRC staff review and approve both proposals together.

Enclosed for filing is the signed original of a document entitled " Application for Amendment to Operating License," with Attachments I and 11 thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.

In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.

Should you or your staff have any questions regarding the proposed changes, please contact Mr. J. A. Gray, Jr. of my staff.

Very truly yours, 46hn C. Brons Qxecutive Vice President Nuclear Generation j

cc: See next page.

I I

h D'

.. c'c: U. S. Nuclear Regulatory Commission L 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nucleat Regulatory Commission P. O. Box 136 Lycoming,NY 13093 Mr. David E. La Barge Project Directorate I-1 Division of Reactor Projects-i/11 U. S. Nuclear Regulatory Commission Mall Stop 14 B2 Washington,DC 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor Albany, NY 12223 l