ML20212A119

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-454/86-22 on 860619-26.No Violations Noted
ML20212A119
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/22/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212A122 List:
References
NUDOCS 8607280117
Download: ML20212A119 (2)


See also: IR 05000454/1986022

Text

. -

DM8 l

kh h b

'JUL 2'2 1986

Docket No. 50-454

Comnonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safeguards inspection conducted by Mr. J. L. Belanger

of this office on June 19 - 26, 1986, of allegations pertaining to security

activities at Byron Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. NPF-37 and to the discussion of our findings with Mr. R. Ward and

other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within thesc areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

e607280117 e60722

ADOCK 05000454

[u;e2 [

PDR

o PDR W. L. Axelson, Chief

Nuclear Materials Safety

and Safeguards Branch 9q

Enclosure: Inspection Report i l

No. 50-454/86022(DRSS) Enclosure contains

-

(UNCLASSIFIED SAFEGUARDS INFORMATION) SAFEGUARDS INFORMATION

iet Upon separation this

See Attached Distribution page is Decontro11M

RIII RIII II RIII

Belan r/kja ba Wgl

y x

mwWmm

. .

hk

Commonwealth Edison Company 2 JUL 2'21986

i

Distribution l

l

cc w/ enclosure: 1

'

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-B/SSPB

ACRS

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

Enclosure contains

SAFEGUARDS If4 FORMATION

Upon separation tMs

page is D2:ar: trolled

h

. ..