IR 05000424/1986125

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-424/86-125 on 861124-1221 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Organization,Security Program Audit, Records & Repts,Testing & Maint & Locks,Keys & Combinations
ML20212J449
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/15/1987
From: Gibson G, Masnyk O, Mcguire D, Thompson D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20212J446 List:
References
50-424-86-125, NUDOCS 8701280202
Download: ML20212J449 (1)


Text

F SAFEGUARDS INFORMATIGL

.

.

UNITE 2 STATES gMarug'o

NUCLEAR REOULATORY COMMISSION

/

"

["

REGION il p

y'

,j 101 M ARIETTA STRE ET, N.W.

t ATLANTA, GEORGl A 30323

%N...*/

JAN 16 $87

.

Report No.:

50-424/86-125 Licensee:

Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.:

50-424 Constructien Perriit No.:

CPPR-108 Facility Name:

Vogtle Inspection Conducted: November 24 - December 21, 1986 Inspectors:

/!/[. d

/

f

n/w n-f;t. A. Tillman, Physic'al Security Inspector Date' Signed

)d ~Y,nnne, c

//WVV1 D. Thompson, Physfcal Security Inspector

~Date Signed

,/) //

///.r

.4%u~

-gpGibson, Physic 41 Security Inspector Date Signed

~

0.#?nou< W

/bt F?

10 Ma k Pifys cal Security Inspector

'Date Si ed

//Nf Approved by:

D. R. McGuire, Chief, Physical Security Section Miate' Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced pre-operational inspection consisted of a review of the status of security program implementation in the following areas of regulatory requirements:

Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected Areas; Physical Barriers, Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Detection Aids -

Protected Areas; Detection Aids - Vital Areas; Communications; Plans, Procedures, and Review; Receipt of New Fuel at Reactor Facilities; Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance; Personnel Training and Qualification - General Requirements; Safeguards Contingency Plan Implementation Review; and Physical Protection Safeguards Information.

Results:

There were ro violations of regulatory requirements identified in the 20 areas inspected.

8701280202 870116 03WE CONT 4233 PDR ADOCK 0500

C A8 tbs 2NFO.t'ATI

,p '^= 2aE%l0!.