Corrected Ltr Forwarding Insp Rept 50-424/86-33 Re Readiness Review Module 9B, Chemistry
ML20215C828
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/13/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215C648 List:
References
NUDOCS 8612150451
Download: ML20215C828 (1)


Text

_ - - _ - _ _ _ _ _ _ _ _ _ _ _

,

e

'

un RE UNITEO STATES

/

'o NUCLEAR REGULATORY COMMISSION

^

y'

REG l0Nli o

g

,j 101 MARIETTA STREET.N.W.

  • ATLANTA, GEORGI A 30323

\\*****/

NOV 131986 Georgia-Power Company.

ATTN: Mr. J. H. Miller, Jr.

President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 98, CHEMISTRY - REPORT N0. 50-424/86-33 The NRC has completed a detailed review, inspection, and verification of the subject module which you submitted to the NRC.

Periodic inspections were conducted at the Vogtle site, and the resultant findings were discussed with members of your staff at the conclusion of these inspections. Technical reviews were also conducted in NRC Bethesda offices, and the findings from these reviews have also been discussed with your staff.

Areas contained in the module which were reviewed, examined, and verified are identified in the enclosed report.

Within these areas, the inspection and verification consisted of selected examinations of procedures and representative records, discussions with personnel, observations of activities in progress, and review of your licensing commitments.

Based on the NRC review, Module 9B provides the framework for an acceptable water chemistry program.

Inasm.ich as the major elements of such a program (i.e.,

staffing, training, development of procedures, and construction of laboratory facilities) had not been completed, our assessment of the Vogtle chemistry program will be continued during future inspections.

During the review of this module, the staff's main concern was that the implementation of the programs described in this module had progressed too slowly.

However, a recent inspection indicated that significant progress has been made toward completion of the water chemistry program.

We believe that continued management attention is warranted to ensure completion of program implementation by the projected fuel load date.

We will again be inspecting your programs for training and qualification of personnel prior to licensing as part of the Near Term Operating License Inspection Program and, during that inspection, we will assess the adequacy of implementation of corrective actions associated with this review.

It is expected that, at that time, all open items and unresolved issues associated with training should be corrected.

Based upon your responsiveness and your ongoing efforts to correct the

,

deficiencies noted during this review, it appears that Madule 9B will be I

acceptable once corrective actions have been satisfactorily implemented and remaining concerns have been adequately resolved.

8612150451 861205 PDR ADOCK 05000424 G