ML20212J441
| ML20212J441 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/16/1987 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20212J446 | List: |
| References | |
| NUDOCS 8701280199 | |
| Download: ML20212J441 (3) | |
See also: IR 05000424/1986125
Text
,
-
.
cAFEGUARDS INFORMATION
JAN 161987
Docket No. 50-424
License No. CPPR-108
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N0. 50-424/86-125
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
A. Tillman on November 24 - December 21, 1986. The inspection included a review
of activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosure to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
@ 2!Dbh h5 boo 24
Virgil L. Brownlee, Chief
G
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/ enc 1:
(See page 2)
ENCI.0SURE CONTAINS
,
SAFECUAHb3 INFORMATI0F
UPON SEPARATION THIS
SAFEGUARDS INFORMATIO'"
' ' ' " * " " " ' " "
'
.1&O4 i
_
_.
.
S
FORMATI
Georgia Power Company
r
, AN 161987
cc w/ enc 1:
J. P. O'Reilly, Senior Vice President
_
Nuclear Operations
R. E. Conway, Senior Vice President &
Project Director
D. O. Foster, Vice President, Project
Support
P. D. Rice, Vice President, Project
Engineering
R. H. Pinson, Vice President, Project
Construction
C. W. Hayes, Vogtle Quality
Assurance Manager
G. B. Bockhold, General Manager,
Nuclear Operations
cc w/o encl:
J. T. Beckham, Vice President,
Plant Hatch
R. A. Thomas, Vice President,
Licensing
D. S. Read, General Manager,
Quality Assurance
'
W. C. Ramsey, Manager -
Readiness Review
L. Gucwa, Manager, Nuclear Safety
and Licensing
M. H. Googe, Project
Construction Manager
E. D. Groover, Quality
Assurance Site Manager -
Construction
J. A. Bailey, Project Licensing
Manager
G. F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
'
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
E. L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
J. G. Ledbetter, Commissioner,
Department of Human Resources
C. H. Badger, Office of Planning
and Budget
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
ENCLOSURE CONTAIN3
SAFEGUARb3 INFORMATION
(cc w/o enci cont'd - see page 3)
UPON 3FPARATION THIS
.PAGE 13 DI.00fffROLLED.
3AFEGUARDS INFORMATION
'
JEGUARDS INFORiv:
log
.
.
.,
.
JA N 161987
Georgia Power Company
3
(cc w/o enci cont'o)
D. Feig, Georgians Against
Nuclear Energy
M. B. Margulies, Esq., Chairman,
Atomic Safety ar.d Licensing Board
Panel
Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ enc 1:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
NRC Resident Inspector
Document Control Desk, 016
State of Georgia
.
RI
h
RII
v,
v
Tillman:er
ire
WCline
EChristnot (2 MSinkule
F
01//p87
01/ 5/87
01fl5/87
1 //0' 87
01/g87
f
S.=El$Mfsnya
sne e m 1x,
SAFEGUARDS INFORMATION
EI2DECCHIROLLED,