IR 05000424/1986054
| ML20210D949 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/16/1987 |
| From: | Blake J, Novak T, Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20210D919 | List: |
| References | |
| 50-424-86-54, NUDOCS 8702100202 | |
| Download: ML20210D949 (39) | |
Text
.
w
.
pa ca rog'o.
UNITED STATES NUCLEAR REGULATORY COMMISSION
/
[
REGION 11 p
.$
j 101 MARIETTA STREET.N.W.
ATLANTA, GEORGI A 30323
'+9
- .. 9
.
Repart No.: 50-424/86-54 Licensee: Georgia Power' Company-P. O. Box 4545
-
,
Atlanta, GA 30302
'
Docket No.: 50-424 License No.:
CPPR-108 Facility Name: Vogtie,1,
'
,;
Reviews Conducted: May - October-1985'
'
-
' +
,
-
..
.
On-Site Inspections Conducted: July 15-19,-July 29 - August.2, August 19-23, August 26-30' and September 3-6, 1985; and
,-
'
February 24-28, and May' 5-9,1986 NRC Offices Participating In Inspections / Reviews:
Office of Nuclear Reactor Regulation,-Bethesda, MD Region II, Atlanta, GA
'
Reviewers:
R. Pichumani, Mechanical Engineer,.NRR W. T. LeFave, Mechanical Engineer, NRR J. J. Lazevnick, Electrical Engineer, NRR C. Y. Li, Nuclear Engineer, NRR D. E. Smith, Materials Engineer, NRR G. B. Staley, Hydraulics Engineer, NRR J. Guttmann, Nuclear Engineer, NRR K. C. Lau, Structural Engineer, NRR N. Romney, Equipment Qualifications Engineer, NRR Inspectors:
E. H. Girard, Reactor Inspector, Region II S. J.
ias, Reactor Inspector, Region II C.
H 1
/,1/7 /86 r
Reactor Inspector, Region II
,
-
V Approved by.
J J Blake, Section Chief (Module-All Sections)
Date Si'gned g neering Branch i ision of Reactor Safety Region II Y
uAit.
&
B7 T. Novak, Deputy Director Date Si@nea f
Division of PWR Licensing-A Office of Nuclear Reactor Regulation (NRR)
8702100202 870130 PDR ADOCK 0500
--
_
.
,..
.
.b l
b
M. V. Sinkule,' Chief Date' Sig'ned -
Projects Section 2C Division of Reactor' Projects Region II l
1i
f
-
SUMMARY OF DESIGN DOCUMENTS REVIEWED BY RRT AND NRC Total RRT NRC Document Type Number Reviewed Reviewed Design Criteria
23
Calculations 313
21 Drawings Piping and Instrumentation Diagrams
11
(plus related Isometric Drawings)
(+ unknown)
(+28)
(+7)
Drawing Change Notices 24,000 349
Procurement Specifications
6
Construction Specification 368
0 Change Notices Field Change Requests Unknown
17 Deviation Reports 24,000 100
Supplier Deviation 146
0 Disposition Requests Equipment Qualification Unknown
0 Documentation Field Engineering Change 220
0 Orders Supplier Quality Verification Unknown
0 Documentation List Specs.
Vendor Drawings Unknown
1
,
i