IR 05000424/1986009

From kanterella
Jump to navigation Jump to search
Forwards Corrected Notice of Violation Issued W/Insp Rept 50-424/86-09,changing Issue Date
ML20205P231
Person / Time
Site: Vogtle 
Issue date: 05/05/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20205P236 List:
References
NUDOCS 8605210268
Download: ML20205P231 (1)


Text

l

'

C/J 't C cl

..

W 5 1986 l

i

!

l

'

ATTN:pMr.R.J. Kelly Georgi ower Company Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

REPORT NOS. 50-424/86-09 AND 50-425/86-04 Due to an administrative error the enclosed Notice of Violation to the subject report was not properly dated. Enclosed is a properly dated Notice of Violation.

Please replace the incorrect document with with corrected document.

Should you have any questions concerning this letter, please contact us.

Sincerely, ORIGINAL SIGNED BY VIRGIL L. BROWNLEE for Luis A. Reyes, Acting Director Division of Reactor Projects Enclosure:

Correctly dated Notice of Violation cp w/ encl:

W. E. Conway, Senior Vice President &

d.ProjectDirector O. Foster, Vice President, Project j Support l

W. D. Rice, Vice President, Project l

dEngineering

'

H. Pinson, Vice President, Project 7. Construction J

T. Beckham, Vice President &

General Manager - Operations

.

W. A. Thomas, Vice President, Licensing d.W. Hayes,VogtleQuality t

l

%.AssuranceManager

,

l C. Ramsey, Manager -

,

d.ReadinessReview B. Bockhold, General Manager, Nuclear Operations M Gucwa, Manager, Nuclear Safety and Licensing

'

(ccw/ encl: Cont'd page 2)

l

~

8605210268 860505

)

'

'

g p(

DR ADOCK 0500

L

'

,.

.,

,,

"

MAY 5 1986 Georgia Power Company

H. Googe, Project

/ Construction Manager VE. D. Groover, Quality Assurance Site Manager -

j' Construction vJ. A. Bailey, Project Licensing

/ Manager

.G. F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge

. W. Churchill, Esq., Shaw, f Pittman, Potts and Trowbridge E. L. Blake, Jr., Esq., Shaw, d.Pittman, Potts and Trowbridge E. Joiner, Troutman, Sanders, I.LockermanandAshmore G. Ledbetter, Commissioner, I epartment of Human Resources D

H. Badger, Office of Planning

/.and Budget D Kirkland, III, Counsel, Office of the Consumer's Utility Council

/D. C. Teper, Georgians Against d.NuclearEnergy B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel gr.O.H. Paris,AdministrativeJudge Atomic Safety and Licensing Board

/d. Panel A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board f anel P

.

VB. P. Garde, Citizens Clinic, Director Government Accountability Project

/ccw/ encl:

Reis, ELD

. M. Hill, IE

. Miller, NRR p.Brach,E00 M. Sinkule, RII 4 Rankin, RII IRCResidentInspector

-

/pocumentControlDesk

-

w tate of Georgia RII RII

$

RII 4%

h h

EChristont:dm MSinkule VLBrownlee 5/ 5 /86 5/f/86 5/g/86 i

'

l