IE Insp Repts 50-413/81-20 & 50-414/81-20.Noncompliance Noted:On 810923,adequate Measures to Control Welding Filler Matls Were Not Established
ML20033D203
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/09/1981
From: Herdt A, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20033D198 List:
References
50-413-81-20, 50-414-81-20, NUDOCS 8112070373
Download: ML20033D203 (9)


Text

'

t

[

'o,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION o

t c

REGION II

%g*****o[

101 MARIETTA ST., N.W., SUITE 3100 o,

ATLANTA, GEORGIA 30303 s

. Report Nos. 50-413/81-20 and 50-414/81-20 Licensee: Duke Power Company P. O. Box 2178 Charlotte, NC 28242 Facility Name:

Catawba Docket Nos. 50-413 and 50-414 License Nos. CPPR-116 and CPPR-117 Inspection a at

'near Rock Hill, SC Inspector:'

.

f-

=M 6C u2. 9.

W' P ' V/e'in'sor e Date Sign 6d Approved by.

_

/6/9/6/

'

erdt, Section Chief Date Signed

.

En ineering Inspection Branch

,

Engineering and Technical inspection Division SUMMARY Inspection on September 22-25, 1981

,

Areas Inspected This routine, unannounced inspection involved 33 inspector-hours on site in the areas of licensee action on previous inspection findings, reactor coolant pres-sure boundary piping (Unit 2), safety related structures (Units 1 and 2) and containment structures (Unit 2).

Results Of the four areas inspected, no violations or deviations were identified in three areas; one violation was found in one area (Violation - 413, 414/81-20-01:.

" Inadequate Measures to Control Welding Filler Materials" paragraph 7a(1)(a)).

No deviations were found.

.

8112070373 811130 PDR ADOCK 05000413 G

PDR

-.

.,.

-.-

.

,

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • J. C. Rogers, Project Manager
  • S. W. Dressler, Sr., Construction Engineer
  • R. G. Rouse, QA Technician
  • W. T. McClure, QA Technician Other licensee employee::. contacted included construction craftsmen, tech-nicians, and office personnel.
  • Attended ' exit interview 2.

Exit Interview The inspection scope and findings were summarized on September 25,1981 with those persons indicated in paragraph 1 above. The inspectors described the areas inspected and discussed in detail the inspection findings-listed below. No dissenting comments were received from the licensee.

Violation 413, 414/81-20-01: " Inadequate Measures to Control Welding Filler Materials" paragraph 7a(1)(a)

Vendor Supplied '

Unresolved Item 414/81-20-02:

" Weld. Discrepancies on Structures" paragraph Sa Unresolved Item 413, 414/81-20-03:

"AWS Acceptance Criteria Conflict"

=

paragraph Sb 3.

Licensee Action on Previous Inspection Findings.

(Closed) Violation 413, 414/81-10-02:

" Inadequate ' Measures to Control Preservation of Safety Related Materials" Duke letter of response dated July 24, 1981 has been reviewed ~and determined to be acceptable by Region ~II.

The inspector held discussions-with the-project manager and examined the' corrective actions asistated in the letter-f of response. The inspector concluded that Duke had: atermined the full extent of the subject' noncompliance,.- performed thel necessary ' survey and follow-up actions, - to : correct. the present conditions and ' developed the necessary corrective actions to preclude recurrence-of. simi.lar. circum-stances.

The c.orrective actions identified in. the ~1etter of.' response.. have been implemented, f

-

-

.

.

.1'

s,

'

.,. -. -

F o

,

!

l

!

l l-4.

Unresolved Items t

Unresolved items are matters about which more information is required to t

'

determine;whether they are acceptable or may involve violations or devia-tions. New unresolved items identified during this inspection are discussed in paragraph Sa and Sb.

5.

Independent Inspection Effort (Units 1 and 2)

,

l l

The inspector conducted a general inspection of the Unit I and 2 contain-ments, auxiliary building, fuel buildings, and electrode issue stations to observe construction progress and construction activities such as welding, material handling and control, housekeeping and storage.

,

l l

a.

With regard to the above inspection the inspector accompanied by a

--

j-representative.of the licensee on September 23, 1981, noted a number of l

weld discrepancies on structured steel "B Frame" in the Unit 2 contain-

!

ment. At the time of this inspection, the extent of the discrepancies

!

or their acceptability to the code of record (AWS D1.1) could not.be

~ determined. The frame was fabricated by Southern Engineering Company.

The licensee documented the above in NCI No. 12892 and indicated that they would look further into the matter. The inspector stated that the above would be an unresolved item idantified as 414/81-20-02:

" Weld Discrepancies on Vendor Supplied Structures."

l b.

With regard to the above. inspection, the inspector noted that = Duke i

Procedure L-80, Revision 11, " Visual Workmanship Standards for. Welds'.'

i does not reflect the prohibition on piping porosity, in complete penetration groove welds, in butt joints transverse to the direction of computed tensile stress, as stated in AWS DI.1-Rev. 2-77 paragraph 8.15.1.7.

At the time of this inspection, the affect of the 'above acceptance criteria omission on previously inspected items could not be

,

L determined. The licensee indicated that they would look further into the matter.

The inspector stated the above would be identified as.

~

unresolved item No. 413, 414/81-20-03:

"AWS Acceptance Criteria Conflict."

.Within the areas ' examined no violations.or deviations were identified.

,

I l

6.

Reactor Coolant Pressure Boundary Piping (Unit 2)

l The inspectors observed non-welding'and welding work activities'for reactor coolant pressure boundary (RCPB) piping. The applicable ~ code'for:installa-tion of RCPB piping is.the ASME B and PV code,.1974 edition plus addenda through summer 1974.

a.

Observation of Non Welding Activities The following piping 4" runs" we m ' inspected for compliance with' instal-lation specifications or plans.

.

(

.a

-

,

,

,

,

WELD NO.

FROM TO PLAN

,

10 CN-2NI-55 i

13 CN-2ND-67

6 CN-2ND-67-

20 CN-2ND-66

.2

CN-2ND-66

7 CN-2NI-91

,

b.

Review of Non Welding-Quality Records i

The inspector selected various reactor coolant pressure boundary piping

~

components (e.g., pipe, fittings and welded-in components) for review of pertinent records to determine conformance with procurement, storage-and installation specifications and QA/QC site procedures.

Records of the following items were selected for review to -ascertain whether they (records) were in conformance with applicable requirements relative to the following areas: material test reports / certifications; vendor supplied NDE reports; NSSS quality releases; site receipt-inspection; storage; installation; vendor nonconformance reports.

HEAT NO ITEM P-8462 12" L.R. 81 -ELL.

52390 12" L.R. 90 ELL.

i 52389 12" L.R; ~ 90* ELL.

42415 8" L.R. 90 ELL.

MH-5-426~

8" Pipe 25994 12" Pipe -

25998 12". Pipe 743016 6" Pipe.

RW143170 6" L.R. 90 ELL.

-25996 12" Pipe

-

c.

Observation of Welding Activities The ' inspector observed field : welding of reactor coolant pressure boundary piping at various: stages of weld completion.

(1) The: inspector examined weld joints of pipe to pipe / fitting.(PPF).

and pipe to component (PC)'where. welding.was beyond the root: pass-to determine; weld / welder; identification,, qualified welder / weld -

procedure,'periodicichecksfof welding variables, use of_specified weld _ material _,; proper interpass temperature and where. applicable pr.e-heat:and post weld heat treatment;and physical appearance'of

weld (e.g. _ starts, stops, undercut and. surface imperfections).'

-The following weld joint was.e' amined.

x

.

+

_

_

_

_

-

=-

- - -

s

,

i

,

,

JOINT NO.

' UNIT SIZE SYSTEM

_

N1-55-10

10" X 1.000" Safety Injection (2) The inspector observed activities at weld material issue stations to determine adequacy of; weld traterial storage / segregation, oven temperatures, issue records and return of unused weld ' material.

Also, the inspector observed work areas for uncontrolled weld material.

(3) The inspector examined the following weld wh9r e nondestructive testing (NDE) was in process to determine surface suitability, specified NDE being performed and with qualified personnel:

. JOINT ' NO.

UNIT.

SIZE SYSTEM NC-43-11-

'2 12" X 1.125" Reactor' Coolant d.

Review of Quality Records (1) The following completed weld records were reviewed in the areas of visual and dimensional inspections, weld ' hi story, preheat and interpass ternperature, NDE, weld repair, welder qualification,.and inspector qualification, as applicable to each weld:-

WELD NO ISO-SIZE

2ND-67-12"

2ND-67 12"

2ND-67 12"'

2ND-67

'12"

2NI-91

.8"

2NI-91-8"

2NI-91 8"

2NI-66 12" 6'

2NI-66 12"

2NI-66 12"

ENI-66

.12"

2NI-55 6"

2NI-55 6"

2NI-55-6"

2NI-55 6"

.(2) N inspector reviewed records.of the following QA audits relative 1 eactor. coolant pressure boundary pipe welding; AUDIT NO-

-MWN-4-8-81'

.MWN-4-7-81-

-

.

?

r s

.

'

Q

_

u

-

-

.-

i

~'

.

.

..

..

f

..

.,

T 5-

.

MWN-4-6-81 MWN-4-5-81 MWN-4-4-81 MWN-4-3-81 MWN-4-2-81

.MWN-4-1-81 Within the areas examined, ther.e were no violations or deviations identi-fied.

,

7.

Safety-Related Structures (Units 1 and 2)

The inspector observed field welding activities asscciated with safety-related structures and supports outside containment during.various stages of weld completion. Observations were made in order to determine whether the requirements of applicable specifications, standards, work and/or inspection procedures are being met for the activities involved and in the following stages of weld completion:

a.

Observation of Welding Activities

.

(1) The inspector examined weld joint fitup, prior to welding, to determine whether weld identification / location, joint preparation and alignment and QC verification are in conformance:with existing requirements.

STRUCTURE SUPPORT UNIT WELD NO.

DRAWING Fuel Pool Heaters 1-

-

CN-1214-8.01 R1 i

Supports-

.

Pipe Support

-

1-A-NV-3202 Pipe Support

-

1-A-RN-8711 Pipe Support l'

'

1-A-NB-3683:

-

Manway Davit 1-

-

.CN-1220-77 R0-Spent Fuel Pool

X-23-CNFO-1438:31-32E.

Liner Plate

' Spent Fuel Pool.

2 -'-

.X-24-CNF0-1438.31-32E Liner Plate Spent Fuel Pool 2.

114-L'

!CNF0-1438.31-32E Liner Plate -

Spent Fuel' Pool-2-

34R CNF0-1438.31-32E.

Liner Plate

,

-m

_

>

$_

.

_

p

,.

.g

.

i

'

l:

,

-(a) With regard to the above inspection, the inspector, on September 23, 1981, noted that the veelding filler material

,

i issue station had issued three w31ders Type E-10018 elec-

L trodes in lieu of Type E-7018 electrtdes The Welding filler

'

material issue authorizations (Form H-3B) indicated that Type E-7018 was issued. The E-10018 electrodes went unde-tected by the issue station personnel, and the three welders.

The inspector identified the electrode type substitution at the work station of the welder of record for pipe support l

1-A-NV-32M. The licensee was able to account for all the L

improperly issued type E-10018 electrodes.

The licensee further determined that ncne of the Type E-10018 electrodes

'

had been used on production worL The above is Docomented in NCI 12892.

The above indicates that the licensee does not have adequate measures to control ' welding filler materials.

Failure to -

.

establish measures to control special processes including welding is in violation of~10 CFR.50 Appendix "B" Criterion-IX. This violation will be identified as 413, 414/81-20-01:

" Inadequate Measures to Control Welding Filler Materials."

(b) The inspector. examined weld joints where ~ welding was in progress to determine whether weld identification, weld procedures, welder qualification, weld material, defect removal (if applicable), specified NCE and' periodic checks of welding variables were in conformance with existing require-ments.

' STRUCTURE

!

SUPPORT UNIT WELD NO.

DRAWING-Fuel Pool-Heaters

CN-1214-8.01 R1 -

--

Supports Pipe Support 1.

1-A-NV-3202

-

[

Pipe Support

1-A-RN-8711

-

Pipe Support

.1-A-NB-3683:

--

Manway Davit l'

-

CN-1220-77:R0 Spent Fuel Poo1:

2'

X-23'

CNF0-1438.31-32E-Liner Plate.

-Spent Fuel Pool 2'

~X-24.

CNF0-1438.31-32F-Liner Plate.-

i-

. Spent Fuel Pool.

-2-

~114-L

.CNF0-1438.31-32E-Liner Plate

<

h.

  • _.

-. i

_

.

.

.. -. -

.

.

.

_.

.

.

.;

r +

,

-

l Spent Fuel Pool

3G CNF0-1438.31-32E Liner Plate

'

(3) Observation of weld material control included:

identifi-cation, segregation, oven temperatures, issue slips and

control of unused material at issue stations and work areas.

-

(< ) During observation of welding activities there were a suffi-cient number of qualified inspection personnel at the work-site.

b.

Review of Quality Records The inspector review records of the following QA audits relative -to welding of safety related structures and supports.

AUDIT NO

MWN-4-8-81 MWN-4-7-81

'

MWN-4-6-81 l-MWN-4-5-81

,

MWN-4-4-81 i

MWN-4-3-81 MWN-4-2-81 MWN-4-1-81 Within the areas examined, there were no violations or deviations identfied,-

except as noted in paragraph 7a(1)(a).

8.

Contain,ent Structures (Unit 2)-

Observation of Welding and Welding Work Activities-

~

lhe inspector. observed field welding activities -associated 'with steel

-

containment structure and steel supports for major equipment within the-containment at various - stages of ' weld completion..The applicable' code i for the below listed welding is AWS-D1.1-80.

a.

The inspector observed welding activities where joint fitup and align-ment 'were complete (but welding had. not. been' started)' to determine conformance with applicable. specifications and procedures in the. areas of; weld identification, joint fitup and' alignment and evidence of-QC verification.

'

' STRUCTURAL-SUPPORT DRAWING

Structure Frame A

.CN-1075-01

~

P1atform 2PC

.CN-1081-14'

.

,

_

-.

-

-

ri e

b.

The inspector observed welding activities where welding was in progress to determine conformance with specifications and procedures in the areas of; weld identification, specified weld procedures, qualified welders, specified weld material, specified purge (if applicable);

repair procedures, specified NDE being performed and periodic checks of welding variables.

,

STRUCTURAL SUPPORT DRAWING Structure Frame A CN-1073-01 Platform 2PC CN-1081-14 c.

Observation of weld material control included; identification, segre-gation, oven temperatures, issue slips and control of unused material at issue stations and work areas.

d.

During observation of welding activities there appeared to be a suffi-cient number of qualified inspection personnel at the work site.

Within the area examined, there were no violations or deviations identified.

"

.