UNITED STATES NUCLEAR REGULATORY COMMISSION
.g g.
REGION 11 -
p 101 MARIETTA ST., N.W., SUITE 3100
'g 4-ATLANTA, GEORGIA 30303
.
- ,o.
-
,
~ Report Nos. 50-413/81-14 a.d 55-414/81-14
~ Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Catawba
. Docket Nos. 50-413 and 50-414
~ License Nos. CPPR-116 and CPPR-117~
Inspection at Catawba site near Rock Hill, South Carolina Inspector:
O'
7b.d!f/
P.
anDoorn
"/
/
Dhte ' Signed
.
Approved by:
bO
~
e7/bv[(f[
J.
Brya'fft,Gection Chief, Division of Date Signed sident and Reactor Project Inspection SUMMARY Inspection on May 26 - June 25. 1981
!
Areas Inspected l
L This routine announced inspection involved 178 resident inspector-hours on site in the areas of reactor coolant pressure boundary p'iping - observation of welding and non-welding activities; safety-related piping - observation of welding and non-welding activities; review of nonconforming item reports; observation of i
storage; safety-related pipe support and restraint systems; followup of inspector identified items and a licensee identified item;- electrical components and i
systems - observation of work; electrical cables - observation of work.
Resul ts -
Of the eight areas inspected, no violations or deviations were identified in seven areas; one violation was found in one area (Failure to perfonn adequate
'
evaluation of a nonconforming condition - paragraph 5.c.).
I i
,
l i
-
l
!
l O8109090253 810903 l-BPDR ADOCK 05000413
'
NG-PDR
i.
,
- - -
- - _,, -.,. _.
,. _,
__,
., _
-
. _ - ~_ -.. _,.
N
'
.
.
.
.
.
DETAILS 1.
Persons Contacted Licensee Employees J. C.. Rogers, Project Manager
- S. W. Dressler, Senior Construction Engineeer W. O. Henry, QA Manager Technical Services
- R. A. Morgan, Project QA Engineer T. D. Mills, Construction Engineer Mechanical
- J. C. Shropshire, QA Engineer Supervisor
- A. R. Hollins, Construction Engineer Hangers
'
'
K. R. Webber, Mechanic Superintendent T. A. Evans, Hanger Engineer H. D. Mason, QA Engineer Supervisor J. N. Warren, QC Engineer Civil / Electrical
- S. H. VanMalssen, Construction Staff Engineer
!
H. L. Atkins, QA Engineer
- W. T. McClure, QA Technician D. E. Gadd, Welding Engineer D. H. Llewellyn, Welding Engineer J. E. Cavender, Level III Inspector
,
l J. W. Glenn, QA Engineer T. R. Stegall, Civil Engineer P. L. Stiles, Assistant Design Engineer D. C. Mottern, Assistant Design Engineer T. J. Smart, Design Engineer Assistant l
Other licensee employees contacted included twenty construction craftsmen, three
'
technicians, five inspectors, and three office personnel.
l Other Organizations Hartford Steam Boiler Inspection and Insurance Company i
l J. W. Kosko, Authorized Nuclear Inspector l
C. F. Toegel, Authorized Nuclear Inspector l
l
- Attended exit interview i
2.
Exit Interview The inspection scope and findings were summarized on June 26, 1981 with those person,s indicated in Paragraph 1 above.
The violation and unresolved item described in paragraphs 5.c. and 12.b., respectively,'were discussed in L
detail.
In addition, the inspector held discussions with Mr. W. O. Henry,
'
QA Manager, Technical Services Division and Mr. J. R. Wells, Corporate 0A Manager on. June 30, 1981 and July 1, 1981, respectively, concerning i'
violation described in paragraph 5.c.
The inspector described the violation in detail and indicated that further mar.agement action appears necessary i
.
. -
.
.
concerning evaluation of the specific nonconforming item and concerning prevention of further inadequate evaluations of nonconfonning items.
Mr. Wells indicated that examination of this item would begin immediately.
3.
Licensee Action o-Previous Inspection Findings (Closed) Unresolved Item (413, 414/81-04-01) - Missing radiographic technique records.
The inspector verified that the radiographic technique records were available in the Corporate QA Records Vault.
(Closed) Unresolved Item (413, 414/81-05-03) - Deteriorated pipe caps.
This item concerned the fact that caps on piping spools in the storage laydown area were in the process of deteriorating due to exposure to sunlight.
The licensee has made personnel aware of this problem and has instituted an inspection program to look for deteriorated caps. The inspector verified this program implementation by reviewing the procedure change, Rev. 9 of CP-170, and by observation of the laydown area.
(Closed) Violation (413/81-06-03) - Failure to document corrective action concerning inadequate design of a hanger. Licensee actions concerning this
item have included implementation of a Design Engineering Department procedure for handling of nonconformance (PR-202), revision of the drawing for the affected hanger and review of drawings to determine that no similar inadequate design has been implemented. The inspector reviewed documenta-tion of the above actions and considers these actions to be satisfactory.
4.
Unresolved Items l
l Unresolved items are matters about which more information is required to l
determine whether they are acceptable or may involve noncompliance or deviations. A new unresolved item identified during this inspection is j
discussed in paragraph 12.b.
l l
5.
Independent Inspection Effort I
l a.
The inspector conducted general inspections of site work and work activities and observed equipment protection / storage and housekeeping l
in the auxiliary building, containment buildings, pipe fabrication shop
!
and storage areas.
'
The inspector reviewed numerous Nonconforming Item Reports (NCI's) to b.
determine if nonconforming conditions were adequately described, dispositioned and evaluated in accordance with NRC and licensee procedure requirements.
c.
On June 18, 1981 the inspector reviewed NCI No.11746 concerning inadequate weld root conditions for Wald Nos.1NV343-1, INV 344-1 and 1NV 351-1. Disposition of this NCI was to repair the three listed welds. A determination of the cause of the condition and evaluation of the possible generic implications was not performed.
Construction QA
,;
_
.- -
-
.
w
.-
,
,
..
w
,
L procedure Q-1 does not appear to provide' adequate guidance on handling-of NCIs to verify that the cause.of the condition is determined and corrective action _is taken to preclude repetition. This is Violation
.413, 414/81-14-01 - Inadequate procedure to assure adequate evaluation of.a nonconforming condition.
.No' violations or deviations, except as described in paragraph 5.c., were-identified.
_
6.
Storage. Inspection a.
Site storage requirements are defined via various documents such as purchase documents,. requisitions and documents intended specifically for this purpose such as Duke Form 302.2, Duke Form P3A and NSSS Lists.
Storage is controlled on site via QA procedures P-1, Rev. 20, Receiving l
Inspection and P-3.- Rev.12, Storage Inspection.
In addition, the~
l requirements of ANSI N45.2.2, Packaging, Shipping, Receiving, Storage l
and Handling of Items for Nuclear Power Plants have been adopted by Duke.
!
j The inspector observed storage of numerous components, equipment and
construction materials for conformance to applicable requirements.
Included in this observation were the Unit 2 reactor vessel internals, hydraulic steam generator snubbers for Units 1 and 2 (Note:
This equipment was in the process of being reworked per. NCI 11980), piping spools (all classes), electrical cable and electrical components.
No violations or deviations were identified.
7..
j-Related Pipe Support and Restraint Systems Installation (Unit 1)
a.
The applicable code for safety-related support and restraints instal-lation -is the ASME Boiler and Pressure Vessel Code,Section III, Subsection NF,1974 Edition plus addenda through summer 1975. The inspector observed prefabrication in process: for hanger Nos.
1-R-WL-D114 and 1-R-ND-0200 for conformance to requirements in the-areas of drawings, use of specified materials, in process documentation and control of welding.
No violations or deviations were identified.
8.
Safety-Related Piping (Welding) - Observation of Work and '4ork Activities a.
The applicable code for installation of safety-related piping is the
.
. ASME Boiler and Pressure Vessel Code,Section III,1974 Edition plus addenda through suniner 1975. The inspector observed ir. process welds
'
at various stages of completion and reviewed records for conformanc.a to-
,
. code and procedure requirements in the areas of docu< entation of L
pertinent 'information and QC signoffs via a weld travler, availability of pertinent instructions, use of appropriate qualified welding procedure,. provisions for weld repair, certification of filler-
_, -.
-
.
.
.. -
-
.-
,_
-
.,
..
.
- -
-
_
_
-
-.
,
.
n
_
'
...
,
.
.
i material, control of welding parameters, verification of welder quali-
. fication.use. of specified shielding and. purge gas, condition of welding equipment, provisions for voltage and amperage checks,
. verification of proper fitup, control 'of preheat and interpass -
temperature, condition. of weld and base metal surfaces, and verifi-cation that appropriate inspections were being performed. The following welds were observed:
- Weld No Size (In. Dia.)
Stage of Welding Observed-2NV54.-7
Intermediate 2NI12-1
Intermediate 2NV118-20
Intermediate 2RN375-5
.375 fillet Fitup 2RN375-6
Intermediate 1KC715-22
Final plus liquid penetrant inspection 1KC715-23 3/4 Final plus liquid penetrant inspection 1KC715-24 3/4 Final plus liquid penetrant inspection
- First number indicates Unit number.
No violations or deviations were identified.
9.
Reactor Coolant Pressure Boundary Piping (Welding) - Observation of Work and Work Activities The applicable code is delineated in paragraph 8.
The inspector observed welds at various stages of. completion for conformance to code and procedure-requirements in the areas described in paragraph 8.
The followin5 ' welds were observed:
- Weld No.
Size (In. Dia.)
-Stage of' Welding Observed 2NC11-6
Intermediate-2NV119-1
Intermediate 2NC15-4
Intermediate 2NV149-2
Intermediate i
.
'
...
.. *
..
..
Specification No. CNS-1390.01-00-0023 - Field Fabricated Offsets Specification No. CNS-1390.01-00-0024 - Cable Painting Specification No. CNS-1390.01-00-0035 - Grounding and Sealing Specification No. CNS-1390.01-00-0048 - Field Run Electray or Conduit Specification No. CNS-1390.01-00-0050 - Attaching Cable Specification No. CNS-1390.01-00-0057 - Computer Cable Management Specification No. CNS-1390.01-00-0070 - Cable Installation in Conduit and Duct System Specification No. CNS-1390.01-00-0075 - Repair of Armor Specification No. CNS-1390.01-00-0083 - Cable Tray and Hanger Inspection Tolerances Construction QA Procedure t141 - Electrical Equipment Installation
,
Inspection
!
Supplemental Inspection Instruction (M41B) S/N's 2, 3, 4, 9,10, 12, 13, 14, 15 and 18
,
Construction Procedure CP-301 - Control of Electrical Cable Tray l
Hanger Inpsection and Rework Construction Procedure CP-357 - Control of Signed-off Cable Repulls Construct'on Procedure CP-434 - Measurement of Cable Pulled Througt. Ducts and/or Conduit The inspector observed numerous raceways and installed cable for conformance to requirements in the areas of separation, raceway modification, cable _ painting, cable attachments, cable identification, bending radius, adequate cable support and protection of installed
.
cable raceways.
In addition the inspector participated in the i
l electrical inspection performed by NRC: Region II on June 1-5, 1981 (See Report No. 413,414/81-12).
i l
b.
'On June 9,1981 the inspector noted that specification requirements for l
spacing between adjacent power cables appear ambiguous.
Specification No. 1390.01-00-0022 requires that spacing between power cables be
'
"approximately 1/4 the outside diameter of the largest adjacent cable" L
- - - -
_
_ - - - - - - -..
___j
r
~*
e *..
.
.
Intermediate 2NC15-5
Intermediate 2NC9-5
Intermediate INC193-15
Root INi311-12
Repair
- First number indicates Unit number.
No violations or deviations were identified.
10.
Safety-Related Piping - Observation of Work and Work Activities The applicable code is delineated in paragraph 8.
The inspector observed handling and protection of piping for fabrication of the welds listed in paragraph 8 for conformance to procedure and code requirements in the areas of control of tools for grinding, brushing and filing; use of appropriate handling and rigging equipnent; control of cleanliness; and control of cold spring where applicable.
I No violations or deviations were identified.
,
l 11.
Reactor Coolant Pressure Boundary Piping - Observation of Work and Work l
Activities The applicable code is delineated in paragraph 8.
The inspector observed handling and protection of piping for fabrication of the welds listed in paragraph 9 for conformance to procedure and code requirements in the areas of control of tools for grinding, brushing and filing; use of appropriate handling and rigging equipment; control of cleanliness; and control of cold spring where applicable.
In addition the inspector observed control of l
grinding for repair welding for Weld No. 2NC11-4.
No violations or deviations were identified.
12.
Electrical (Cables and Terminations) - Observation of Work and Work Activities a.
Requirements for installation of electrical cable and associated raceways and raceway supports are delineated in various specifications and procedures. The inspector reviewed selected documents to determine technical adequacy and review site specific requirements.
The following documents were reviewed:
Specification No. CNS-1390.01-00-0018 - Separation Criteria Specification No. CNS-139.01-00-0022 - Cable Installation -
Cable Tray and Electray
.
_
~
--
,
,:
.?.. :
.,
.
7-and further requires this spacing to be " maintained where at all possible throughout the tray".
This will be an unresolved iten until more definitive requirements can be implemented and until it can be determined if power cable has been installed with inadequate spacing.
This is Unresolved Item 413, 414/81-14-02 - Control of electrical power cable spacing.
No violations or deviationF were identified.
13.
Electrical (Components and Jystems) - Observation of Work and Work Activities Electrical components and systems are installed in accordance with various drawings, specifications and site procedures. Applicable site procedures include Construction QA Procedure M41 and Supplemental Inspection Instruc-tion (M418) S/N's 4,10 and 18. Applicable Specifications include Specifi-cation Nos. CNS-1390.01-00-0095, 0099 and 0108. The inspector observed numerous installed components to determine if requirements were being met relative to protection and cleanliness preservation after installation.
No violations or deviations were identified.
'