MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 IR 05000412/20223012022-06-14014 June 2022 Initial Operator Licensing Examination Report 05000412/2022301 IR 05000334/20213012021-04-0101 April 2021 Initial Operator Licensing Examination Report 05000334/2021301 IR 05000412/20193012019-11-0505 November 2019 Initial Operator Licensing Examination Report 05000412/2019301 IR 05000412/20173012018-01-29029 January 2018 Initial Operator Licensing Examination Report 05000412/2017301 IR 05000334/20163022017-01-0303 January 2017 NRC Initial Operator Licensing Examination Report 05000334/2016302 IR 05000412/20163012016-02-17017 February 2016 Er 05000412/2016301; December 7 to 11, 2015, and December 14, 2015; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination Report IR 05000334/20143012014-09-0404 September 2014 Er 05000334/2014301; July 7-14, 2014; Beaver Valley Power Station, Unit 1; Initial Operator Licensing Examination Report IR 05000412/20103012010-09-24024 September 2010 Er 05000412/2010301; August 16 - September 7, 2010; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination Report IR 05000412/20083012009-01-26026 January 2009 Er 05000412-08-301, on 12/8-15/2008, Beaver Valley Unit 2; Initial Operator Licensing Examination Report IR 05000334/20073012007-12-14014 December 2007 Er 05000334-07-301, Exam Dates 11/9/2007 & 11/12-16/2007, BVPS-1, Initial Operator Licensing Examination. Eleven of Twelve Applicants Passed Examination. One SRO Upgrade Failed Written Exam. Twelve Applicants Included Four Ros, Six SRO Inst IR 05000334/20053012005-05-0606 May 2005 Er 05000334-05-301 and 05000412-05-301; 2/28/05 to 3/7/05; Beaver Valley Units 1 and 2; Initial Operator Licensing Examination. Ten of Eleven Applicants Passed the Examination, Two Reactor Operators, Seven SRO Instants, and One SRO Upgrade IR 05000412/20023022003-01-31031 January 2003 IR 05000412-02-302; on December 13, 2002 - January 10, 2003; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination 2023-11-27
[Table view] |
Text
ary 31, 2003
SUBJECT:
BEAVER VALLEY POWER STATION - OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 50-412/02-302
Dear Mr. Bezilla:
This report transmits the results of the reactor operator (RO) and senior reactor operator (SRO)
licensing examination conducted by the NRC during the period of December 13-20, 2002. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 8, Supplement 1).
Based on the results of the examination, all four RO applicants and all five SRO applicants (four instant and one upgrade) passed all portions of the examination. Examination results indicated that the applicants were well-prepared for the examination. Messrs. P. Bissett and J. Laughlin discussed performance insights observed during the examination with Mr. Greg Davies on December 20, 2003. On January 17, 2003, final examination results, including individual license numbers, were given during a telephone call between Messrs. P. Bissett and J.
Laughlin, Mr. Christopher Hynes, and other members of your staff.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS ({RO and SRO} Written - Accession Number ML030230046; {RO and SRO} Operating Section A -
Accession Number ML030230076; {RO and SRO} Operating Section B - Accession Number ML030230091; and {RO and SRO} Operating Section C - Accession Number ML030230139).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73
Enclosure:
Initial Examination Report No. 50-412/02-302
REGION I==
Docket No(s): 50-412 License No: NPF-73 Report No: 02-302 Licensee: First Energy Nuclear Operating Company Facility: Beaver Valley Power Station, Unit 2 Dates: December 13, 2002 (Written Examination Administration)
December 16 - 20, 2002 (Operating Test Administration)
January 6 - 10, 2003 (Examination Grading)
Examiners: P. Bissett, Senior Operations Engineer (Chief Examiner)
J. Laughlin, Operations Engineer (Chief Examiner Under Instruction)
A. Blamey, Senior Operations Engineer G. Malone, Operations Engineer (under instruction)
Approved by: Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety
SUMMARY OF FINDINGS IR 05000412/02-302; December 13, 2002 - January 10, 2003; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination. Nine of nine applicants passed the examination (four reactor operators, four instant senior reactor operators, and one upgrade senior reactor operator).
The written examinations were administered by the facility and the operating tests were administered by NRC region-based examiners. There were no inspection findings of significance associated with the examinations.
ii
Report Details 1. REACTOR SAFETY Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination a. Scope of Review The Beaver Valley training staff developed the written and operating initial examinations and together with NRC operations engineers verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 8, Supplement 1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Beaver Valley power plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- The facility licensee completed a test item analysis on the written examination for feedback into their systems approach to training program.
- Examination security requirements were met.
The Beaver Valley training staff administered the written examination on December 13, 2002. The NRC examiners administered the operating portion of the examination to all applicants from December 16 - 20, 2002.
b. Findings Grading and Results All nine applicants (four ROs and five SROs) passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Examination Administration and Performance NRC examiners identified one generic weakness during the administration of the operating exam in the area of communications. Specifically, three-way communications were weak in that applicants frequently lacked acknowledgments and repeat-backs, which detracted from various crews mitigating actions. Additionally, SRO command and control was sometimes weak in that there were not a sufficient number of crew briefings.
4OA6 Exit Meeting Summary On January 17, 2003, the NRC provided conclusions and examination results to Beaver Valley management representatives via telephone. License numbers for six of nine applicants were also provided during this time. License numbers for the remaining three applicants were withheld pending completion of six months additional on-site experience for one instant SRO and 10.5 months additional power plant experience for two ROs.
Mr. Hynes was informed that when the NRC is notified, in writing, that these deferred time periods have been completed by these three individuals, their licenses would be issued.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
KEY POINTS OF CONTACT LICENSEE G. Davies Manager, Training C. Hynes Supervisor, Operations Training T. Gaydosik Supervisor, Licensed Operator Training T. Wooley Lead Instructor NRC P. Bissett Senior Operations Engineer A. Blamey Senior Operations Engineer J. Laughlin Operations Engineer G. Malone Operations Engineer LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED ITEM NUMBER TYPE DESCRIPTION NONE