MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 IR 05000412/20223012022-06-14014 June 2022 Initial Operator Licensing Examination Report 05000412/2022301 IR 05000334/20213012021-04-0101 April 2021 Initial Operator Licensing Examination Report 05000334/2021301 IR 05000412/20193012019-11-0505 November 2019 Initial Operator Licensing Examination Report 05000412/2019301 IR 05000412/20173012018-01-29029 January 2018 Initial Operator Licensing Examination Report 05000412/2017301 IR 05000334/20163022017-01-0303 January 2017 NRC Initial Operator Licensing Examination Report 05000334/2016302 IR 05000412/20163012016-02-17017 February 2016 Er 05000412/2016301; December 7 to 11, 2015, and December 14, 2015; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination Report IR 05000334/20143012014-09-0404 September 2014 Er 05000334/2014301; July 7-14, 2014; Beaver Valley Power Station, Unit 1; Initial Operator Licensing Examination Report IR 05000412/20103012010-09-24024 September 2010 Er 05000412/2010301; August 16 - September 7, 2010; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination Report IR 05000412/20083012009-01-26026 January 2009 Er 05000412-08-301, on 12/8-15/2008, Beaver Valley Unit 2; Initial Operator Licensing Examination Report IR 05000334/20073012007-12-14014 December 2007 Er 05000334-07-301, Exam Dates 11/9/2007 & 11/12-16/2007, BVPS-1, Initial Operator Licensing Examination. Eleven of Twelve Applicants Passed Examination. One SRO Upgrade Failed Written Exam. Twelve Applicants Included Four Ros, Six SRO Inst IR 05000334/20053012005-05-0606 May 2005 Er 05000334-05-301 and 05000412-05-301; 2/28/05 to 3/7/05; Beaver Valley Units 1 and 2; Initial Operator Licensing Examination. Ten of Eleven Applicants Passed the Examination, Two Reactor Operators, Seven SRO Instants, and One SRO Upgrade IR 05000412/20023022003-01-31031 January 2003 IR 05000412-02-302; on December 13, 2002 - January 10, 2003; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination 2023-11-27
[Table view] |
Text
ary 31, 2003
SUBJECT:
BEAVER VALLEY POWER STATION - OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 50-412/02-302
Dear Mr. Bezilla:
This report transmits the results of the reactor operator (RO) and senior reactor operator (SRO)
licensing examination conducted by the NRC during the period of December 13-20, 2002. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 8, Supplement 1).
Based on the results of the examination, all four RO applicants and all five SRO applicants (four instant and one upgrade) passed all portions of the examination. Examination results indicated that the applicants were well-prepared for the examination. Messrs. P. Bissett and J. Laughlin discussed performance insights observed during the examination with Mr. Greg Davies on December 20, 2003. On January 17, 2003, final examination results, including individual license numbers, were given during a telephone call between Messrs. P. Bissett and J.
Laughlin, Mr. Christopher Hynes, and other members of your staff.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS ({RO and SRO} Written - Accession Number ML030230046; {RO and SRO} Operating Section A -
Accession Number ML030230076; {RO and SRO} Operating Section B - Accession Number ML030230091; and {RO and SRO} Operating Section C - Accession Number ML030230139).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73
Enclosure:
Initial Examination Report No. 50-412/02-302
REGION I==
Docket No(s): 50-412 License No: NPF-73 Report No: 02-302 Licensee: First Energy Nuclear Operating Company Facility: Beaver Valley Power Station, Unit 2 Dates: December 13, 2002 (Written Examination Administration)
December 16 - 20, 2002 (Operating Test Administration)
January 6 - 10, 2003 (Examination Grading)
Examiners: P. Bissett, Senior Operations Engineer (Chief Examiner)
J. Laughlin, Operations Engineer (Chief Examiner Under Instruction)
A. Blamey, Senior Operations Engineer G. Malone, Operations Engineer (under instruction)
Approved by: Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety
SUMMARY OF FINDINGS IR 05000412/02-302; December 13, 2002 - January 10, 2003; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination. Nine of nine applicants passed the examination (four reactor operators, four instant senior reactor operators, and one upgrade senior reactor operator).
The written examinations were administered by the facility and the operating tests were administered by NRC region-based examiners. There were no inspection findings of significance associated with the examinations.
ii
Report Details 1. REACTOR SAFETY Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination a. Scope of Review The Beaver Valley training staff developed the written and operating initial examinations and together with NRC operations engineers verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 8, Supplement 1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Beaver Valley power plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- The facility licensee completed a test item analysis on the written examination for feedback into their systems approach to training program.
- Examination security requirements were met.
The Beaver Valley training staff administered the written examination on December 13, 2002. The NRC examiners administered the operating portion of the examination to all applicants from December 16 - 20, 2002.
b. Findings Grading and Results All nine applicants (four ROs and five SROs) passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Examination Administration and Performance NRC examiners identified one generic weakness during the administration of the operating exam in the area of communications. Specifically, three-way communications were weak in that applicants frequently lacked acknowledgments and repeat-backs, which detracted from various crews mitigating actions. Additionally, SRO command and control was sometimes weak in that there were not a sufficient number of crew briefings.
4OA6 Exit Meeting Summary On January 17, 2003, the NRC provided conclusions and examination results to Beaver Valley management representatives via telephone. License numbers for six of nine applicants were also provided during this time. License numbers for the remaining three applicants were withheld pending completion of six months additional on-site experience for one instant SRO and 10.5 months additional power plant experience for two ROs.
Mr. Hynes was informed that when the NRC is notified, in writing, that these deferred time periods have been completed by these three individuals, their licenses would be issued.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
KEY POINTS OF CONTACT LICENSEE G. Davies Manager, Training C. Hynes Supervisor, Operations Training T. Gaydosik Supervisor, Licensed Operator Training T. Wooley Lead Instructor NRC P. Bissett Senior Operations Engineer A. Blamey Senior Operations Engineer J. Laughlin Operations Engineer G. Malone Operations Engineer LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED ITEM NUMBER TYPE DESCRIPTION NONE