Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.:

Task

Title:

Perform a QPTR Manual Calculation JPM No.: 2002 NRC Ala RO K/A

Reference:

015000A1.04 (3.5/3.7) 01 5000A4.02 (3.9/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testingq:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Unit is in Mode 1 at 80% power.

"* The plant computer is NOT available.

"* All power range channels are operable.

"* Normalization factors have been provided by Reactor Engineering.

Task Standard: QPTR calculation completed and compared to Acceptance Criteria.

Required Materials: Calculator General

References:

20ST-2.4A, Quadrant Power Tilt Ratio Manual Calculation, Rev. 4 Handouts: 2OST-2.4A, Rev. 4 QPTR Parameter Sheet Initiating Cue: The Unit Supervisor directs you to perform a QPTR manual calculation and report the results.

Time Critical Task: No Validation Time: 10 minutes BVPS NRC Ala RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Ala RO (Denote Critical Steps with an asterisk)

NOTE: The order of QPTR calculation does not have to follow the order of the procedure as long as the method of calculation is correct.

CUE: Provide Candidate with a copy of 2OST-2.4A and QPTR Parameter Sheet.

Performance Step: 1 Record normalization factors on Data Sheet 1.

Standard: No action required (values are pre-recorded).

Comment:

Performance Step: 2 Obtain upper and lower quadrant excore nuclear instrument detector outputs for each quadrant.

Standard: Locates detector current outputs and records on Data Sheet 1.

Comment:

BVPS NRC Ala RO NUREG 1021, Revision 8, Supplement I

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Ala RO (Denote Critical Steps with an asterisk)

NOTE: In the following steps, the Candidate should not be evaluated UNSAT for a math error only, as long as the method of calculation is correct.

Performance Step: 3 Multiply each detector current reading by its normalization factor to obtain a corrected current.

Standard: Calculates corrected current.

Records the following approximate numbers for corrected currents:

N41A = 7.263 N41B = 7.342 N42A = 7.235 N42B = 6.561 N43A = 7.198 N43B = 7.903 N44A = 6.942 N44B = 7.036 Comment:

Performance Step: 4 Determine average upper quadrant and average lower quadrant excore NI detector output.

Standard: Calculates average currents.

Records the following approximate numbers for average:

Upper Detectors = 7.159 Lower Detectors = 7.211 Comment:

BVPS NRC Ala RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Ala RO (Denote Critical Steps with an asterisk)

  • Performance Step: 5 Divide each quadrant excore NI detector output by the appropriate (Upper or Lower) average NI detector output.

Standard: Calculates tilt ratios.

Records the following approximate numbers for tilt ratios:

N41A= 1.015 N41B = 1.018 N42A = 1.011 N42B = 0.909 N43A = 1.005 N43B = 1.096 N44A = 0.970 N44B = 0.976 Comment:

Performance Step: 6 Compare highest Quadrant Power Tilt Ratio to Acceptance Criteria.

Standard: Determines that the QPTR exceeds 1.02 on N43B (1.096).

Comment:

Terminating Cue: When the Candidate reports that the QPTR does not meet the Acceptance Criteria, the evaluation for this JPM is complete.

BVPS NRC Ala RO NUREG 1021, Revision 8, Supplement 1

Page 5 of 6 Form ES-C-1 Appendix C VERIFICATION OF COMPLETION 2002 NRC Ala RO Job Performance Measure No.: 2002 NRC Ala RO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS NRC Ala RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET 2002 NRC Ala RO INITIAL CONDITIONS: The Unit is in Mode 1 at 80% power.

  • The plant computer is NOT available.
  • Normalization factors have been provided by Reactor Engineering.

INITIATING CUE: The Unit Supervisor directs you to perform a QPTR manual calculation and report the results.

BVPS NRC Ala RO NUREG 1021, Revision 8, Supplement I

MANUAL QPTR CALCULATION UPPER DETECTORS Current (Uncor.) Norm Factor Current (COr.) Tilt Ratio N41A 125 0.0581 7.263 1.015 N42A 136 0.0532 7.235 1.011 N43A 129 0.0558 7.198 1.005 FNAA 1 R I nAd4. A" Q f07n n Q VJ "

28.638 7.159 LOWER DETECTORS Current (Cor.) 4.

Tilt Ratio 7.342 1.018 6.561 0.909 7.903 1.096 7.036 0.976 UM 28.842 4.

AVG 7.211 Performed By I I (init/Time/Date)

Verified By I (Init/Date)

DATA SHEET I

2OST-2.4A QPTR Parameter Sheet UPPER DETECTORS Current N41A 125 N42A 136 N43A 129 N44A 156 LOWER DETECTORS Current N41B 152 N42B 135 N43B 145 N44B 143

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0481-007-03-013 Task

Title:

Complete Operating Logs JPM No.: 2002 NRC Alb RO K/A

Reference:

2.2.12 (3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

Task Standard: Determine out-of-specification reading(s).

Required Materials: None General

References:

20M-54.3.L5, Surveillance Verification Log, Rev. 39 Handouts: 20M-54.3.L5, Rev. 39 (partial copy)

Initiating Cue: The Unit Supervisor directs you to complete the 0000 to 0800 entries of the L-5, Surveillance Verification Log and report your results.

Time Critical Task: No Validation Time: 15 minutes BVPS NRC Al b RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Alb RO (Denote Critical Steps with an asterisk)

Performance Step: 1 Verify all rods are > 225 steps on the Group Demand Counters (No. 1 - 16) AND DRPI is within +/- 12 steps of the Group Demand Counters; otherwise, N/A signoffs below and perform L5-3 through L5-7.

Standard: Locates and verifies control rods are >_225 steps and DRPI is within +/- 12 steps of the group demand counters.

Continues with entry No. 47 on page 8.

NOTE: Pages L5-3 through L5-7 are omitted.

Comment:

Performance Step: 2 Record and verify that Containment Pressure Indicators agree (No. 47) within 3.0 PSIG of one another.

Standard: Locates 2LMS*PI950, P1951, P1952, P1953 and records containment pressure readings.

Verifies each agree within 3 psig.

Comment:

Performance Step: 3 Record the Containment Wide Range Pressure Recorder (No. 47a) [2LMS-PR106] pressure.

Standard: Locates 2LMS-PR106 and records containment wide range pressure reading.

Comment:

BVPS NRC Al b RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Alb RO (Denote Critical Steps with an asterisk)

Performance Step: 4 Verify Accumulator Level/Pressure High/Low Annunciator Al -4A (No. 28 - 33) is NOT ILLUMINATED due to a valid alarm.

Standard: Locates and verifies annunciator A1-4A is NOT in alarm.

Comment:

Performance Step: 5 Record Accumulator level and pressure, verify the two indicators (No. 28 - 33) on each accumulator agree within 5% for level, 30 PSIG for press.

Standard: Locates and records accumulator level indications, and determines that 2SIS-TK-21A level channels indicate greater than the 5% allowance.

Locates and records accumulator pressure indications and verifies all are within 30 psig.

Comment:

Performance Step: 6 Verify accumulator TK21A, B, C outlet isolation valves (No. 35) [2SIS*MOV865A,B,C] are open by observing the red Open lights are ON.

Standard: Locates and verifies that that accumulator outlet isolation valves are open (red lights are ON).

Comment:

BVPS NRC Al b RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Alb RO (Denote Critical Steps with an asterisk)

Performance Step: 7 Verify accumulator TK21A, B, C outlet isolation valves (No. 35a) [2SIS*MOV865A,B,C] control circuit power is disconnected by removal of the plugs in the lock out jack from the circuits (Window A1-4B).

Standard: Locates and verifies that that accumulator control power is disconnected by absence of A1-4B.

Comment:

Performance Step: 8 Record the Reactor Containment Sump narrow range level (No. 50) indications and verify level is _<10.75 inches.

Standard: Locates 2DAS*LI220 and L1222 and verifies reactor containment sump narrow range level indicates < 10.75 inches.

Comment:

  • Performance Step: 9 Informs Unit Supervisor of results.

Standard: Reports out-of-specification accumulator levels and applicability of T.S. 4.5.1.a.1.

Comment:

Terminating Cue: When the Candidate informs the Unit Supervisor of the results, the evaluation for this JPM is complete.

BVPS NRC Al b RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC Al b RO Job Performance Measure No.: 2002 NRC Al b RO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS NRC Al b RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET 2002 NRC Alb RO INITIAL CONDITIONS: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

INITIATING CUE: The Unit Supervisor directs you to complete the 0000 to 0800 entries of the L-5, Surveillance Verification Log and report your results.

BVPS NRC Al b RO NUREG 1021, Revision 8, Supplement 1

Beaver Valley Power Station Unit 2 20M-54.3.L5 STATION LOGS Revision 39 Page 9 of 48 SURVEILLANCE VERIFICATION LOG Operating Modes 1, 2, 3,4 DATE TodaX Performed No. Surveillance Tech. 0000 0800 1600 (Required every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> unless noted) Spec. 0800 1600 2400 28 2SIS-TK21C [2SIS-LI928] [L0630A]  %

through [2SlS-L19301 [L0631A]  %

33

  • [2SIS-PI929] [P0630A] PSIG

[2SIS-PI931] [P0631A] PSIG

  • Required in MODES 1, 2, 3 when pressurizer pressure above 1000 psig.

35 Verify accumulator TK21A, B, C outlet isolation valves [2SIS*MOV865A,B,C] are 4.5.1 .a.2

  • open by observing the red Open lights are ON on BB-A
  • Required in Modes 1, 2 & 3 when pressurizer pressure above 1000 psig.

35a Verify accumulator TK21A, B, C outlet isolation valves [2SIS*MOV865A,B,C] control 4.5.1 .c

  • circuit power is disconnected by removal of the plugs in the lock out jack from the circuits (Window A1-4B)
  • Required in Modes 1, 2 & 3 when pressurizer pressure above 1000 psig.

50 Record the Reactor Containment Sump narrow range level indications and verify 4.4.6.2.a.4 level is _10.75 inches

[2DAS*LI220] IN

[2DAS*LI222] IN REMARKS:

/ / /

START STOP START STOP START STOP 0000 - 0800 0800 - 1600 1600 - 2400 SRO/DESIGNEE DATE

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0481-014-03-013 Task

Title:

Perform AC Sources Alignment JPM No.: 2002 NRC A2 RO Verification K/A

Reference:

2.2.12 (3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

"* The 2-1 Emergency Diesel Generator was declared inoperable and removed from service 20 minutes ago.

"* 20ST-36.7 is in progress and Train "A" equipment has been verified.

Candidate correctly completes Data Sheet 1 and informs the Unit Task Standard:

Supervisor to refer to Technical Specifications.

Required Materials: None General

References:

20ST-36.7, Offsite To Onsite Power Distribution System Breaker Alignment Verification, Rev. 8 Handouts: 20ST-36.7, Rev. 8 (markup copy)

Initiating Cue: The Unit Supervisor directs you to perform 20ST-36.7 for Train "B" equipment only.

Time Critical Task: No Validation Time: 10 minutes BVPS-2 NRC A2 RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 5 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A2 RO (Denote Critical Steps with an asterisk)

NOTE: Candidate may complete sign-offs for Initial Conditions. These steps are not part of the JPM.

Performance Step: 1 138KV OCB 94 Standard: Locates OCB 94 indication and verifies breaker is closed.

Red light is ON.

Comment:

Performance Step: 2 2B SSST Volt. Sel.

Standard: Locates 2B SSST voltage indications and records values.

Comment:

Performance Step: 3 4KV Bus 2D ACB 342B Standard: Locates ACB 342 breaker indication and determines that the neon lamp is NOT lit.

CUE: If the Candidate initiates or requests a bulb check, inform the Candidate that the bulb check is SAT.

CUE: If necessary, direct the Candidate to complete the remainder of Data Sheet 1.

Comment:

BVPS-2 NRC A2 RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 5 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A2 RO (Denote Critical Steps with an asterisk)

Performance Step: 4 4KV Bus 2D ACB 2D10 Standard: Locates ACB 2D10 indication and verifies breaker is closed.

Red light is ON.

Comment:

Performance Step: 5 4KV Bus 2D ACB 2F7 Standard: Locates ACB 2F7 indication and verifies breaker is closed.

Red light is ON.

Comment:

Performance Step: 6 Refers to Acceptance Criteria.

Standard: Informs Unit Supervisor that Acceptance Criteria is NOT met and to refer to T.S. 3.8.1.1 or 3.8.1.2.

CUE: If necessary, prompt the Candidate to supply the information regarding T.S. applicability.

Comment:

Terminating Cue: When the Candidate reports the results to the Unit Supervisor, the evaluation for this JPM is complete.

BVPS-2 NRC A2 RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 5 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC A2 RO Job Performance Measure No.: 2002 NRC A2 RO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS-2 NRC A2 RO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 5 Form ES-C-1 JPM CUE SHEET 2002 NRC A2 RO INITIAL CONDITIONS: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

"* The 2-1 Emergency Diesel Generator was declared inoperable and removed from service 20 minutes ago.

"* 20ST-36.7 is in progress and Train "A" equipment has been verified.

INITIATING CUE: The Unit Supervisor directs you to perform 20ST-36.7 for Train "B" equipment only.

BVPS-2 NRC A2 RO NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: N/A Task

Title:

Radiological Controls Administrative JPM No.: 2002 NRC A3 RO Questions K/A

Reference:

2.3.10 (2.9) 2.3.1 (2.6)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of testing:

Simulated Performance: Actual Performance:

Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: N/A Task Standard: Both questions answered correctly.

Required Materials: None General

References:

1/2-ADM-1601, Radiation Protection Standards, Rev. 5 1/2-ADM-1630, Radiation Worker Practices, Rev. 3 Handouts: None Initiating Cue: N/A Time Critical Task: No Validation Time: 5 minutes BVPS-2 NRC A3 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A3 RO Questions ANSWER KEY RO Admin A3 Question I You and a co-worker are isolating a pump with a leaking seal in a high noise area in the plant.

Ten minutes after arriving at the pump your alarming dosimeter (ARD) sounds a dose rate alarm. Your co-worker's ARD is not alarming.

Place the following actions in the correct order of performance in response to the ARD alarm.

A. Note the indicated dose rate B. Notify Radiation Protection Technician C. Leave the work area D. Have your co-worker check their indicated dose rate ANSWER: Correct order is A, D, C & B.

Reference:

112-ADM-1630, Radiation Worker Practices, Rev. 3 BVPS-2 NRC A3 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A3 RO Questions ANSWER KEY RO Admin A3 Question 2 An evolution that is expected to take several hours must be performed in a Radiation Area. The individual who will perform the activity has a year to date exposure of 3160 mR (TEDE). The dose rate in the area where the emergency evolution will be performed is 80 mR/hr, and there is no airborne radioactivity present.

Determine the worker's MAXIMUM stay time while performing the activity to prevent exceeding any administrative dose guidelines.

ANSWER:

4000 mR Administrative Exposure Limit 3160 mrem YTD Exposure 4000 mrem - 3160 mrem = 840 mR available (840 mrem)/(80mrem/hr) = 10.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

Reference:

1/2-ADM-1601, Radiation Protection Standards, Rev. 5 BVPS-2 NRC A3 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 6 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC A3 RO Questions Job Performance Measure No.: 2002 NRC A3 RO Examinee's Name:

Date Performed:

Facility Evaluator: N/A Number of Attempts: N/A Time to Complete:

Question Documentation:

Question 1:

Response

Question 2:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS-2 NRC A3 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 6 Form ES-C-1 JPM CUE SHEET 2002 NRC A3 RO Questions CANDIDATE COPY RO Admin A3 Question 1 NO Reference Allowed You and a co-worker are isolating a pump with a leaking seal in a high noise area in the plant.

Ten minutes after arriving at the pump your alarming dosimeter (ARD) sounds a dose rate alarm. Your co-worker's ARD is not alarming.

Place the following actions in the correct order of performance in response to the ARD alarm.

A. Note the indicated dose rate B. Notify Radiation Protection Technician C. Leave the work area D. Have your co-worker check their indicated dose rate BVPS-2 NRC A3 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET 2002 NRC A3 RO Questions CANDIDATE COPY RO Admin A3 Question 2 NO Reference Allowed An evolution that is expected to take several hours must be performed in a Radiation Area. The individual who will perform the activity has a year to date exposure of 3160 mR (TEDE). The dose rate in the area where the emergency evolution will be performed is 80 mR/hr, and there is no airborne radioactivity present.

Determine the worker's MAXIMUM stay time while performing the activity to prevent exceeding any administrative dose guidelines.

BVPS-2 NRC A3 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: N/A Task

Title:

Emergency Plan Administrative Questions JPM No.: 2002 NRC A4 RO K/A

Reference:

2.4.29 (2.6) 2.4.39 (3.3)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of testing:

Simulated Performance: Actual Performance:

Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: N/A Task Standard: Both questions answered correctly.

Required Materials: None General

References:

EPP/I-4, Site Area Emergency, Rev. 17 EPP/IP 5.1, Search And Rescue, Rev. 7 Handouts: None Initiating Cue: N/A Time Critical Task: No Validation Time: N/A BVPS-2 NRC A4 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A4 RO Questions ANSWER KEY RO Admin A4 Question 1 List FOUR Emergency Response Facilities that are required to be activated upon declaration of a Site Area Emergency at BVPS.

ANSWER:

Operations Support Center (OSC)

Technical Support Center (TSC)

Emergency Operations Facility (EOF)

Joint Public Information Center (JPIC)

Reference:

EPP/I-4, Site Area Emergency, Rev. 17 BVPS-2 NRC A4 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A4 RO Questions ANSWER KEY RO Admin A4 Question 2 An Alert level classification has been declared due to an in-plant fire. An individual has been determined to be missing following an evacuation of an affected area, as discovered during personnel accountability efforts. The individual is believed to be injured or trapped in an area away from the area of the fire.

Which activity takes precedence, fighting the fire or rescuing the trapped individual?

ANSWER:

Rescue of a victim shall take precedence over fire-fighting efforts.

Reference:

EPPIIP 5.1, Search And Rescue, Rev. 7 BVPS-2 NRC A4 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 6 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC A4 RO Questions Job Performance Measure No.: 2002 NRC A4 RO Examinee's Name:

Date Performed:

Facility Evaluator: N/A Number of Attempts: N/A Time to Complete:

Question Documentation:

Question 1:

Response

Question 2:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS-2 NRC A4 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 6 Form ES-C-1 JPM CUE SHEET 2002 NRC A4 RO Questions CANDIDATE COPY RO Admin A4 Question I NO Reference Allowed List FOUR Emergency Response Facilities that are required to be activated upon declaration of a Site Area Emergency at BVPS.

BVPS-2 NRC A4 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET 2002 NRC A4 RO Questions CANDIDATE COPY RO Admin A3 Question 2 NO Reference Allowed An Alert level classification has been declared due to an in-plant fire. An individual has been determined to be missing following an evacuation of an affected area, as discovered during personnel accountability efforts. The individual is believed to be injured or trapped in an area away from the area of the fire.

Which activity takes precedence, fighting the fire or rescuing the trapped individual?

BVPS-2 NRC A4 RO Questions NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.:

Task

Title:

Review a QPTR Manual Calculation JPM No.: 2002 NRCAla SRO K/A

Reference:

015000A1.04 (3.5/3.7) 015000A4.02 (3.9/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Unit is in Mode 1 at 80% power.

"* The plant computer is NOT available.

"* All power range channels are operable.

"* Normalization factors have been provided by Reactor Engineering.

Task Standard: QPTR calculation reviewed and determined NOT to meet 20ST-2.4A Acceptance Criteria.

Required Materials: Calculator General

References:

20ST-2.4A, Quadrant Power Tilt Ratio Manual Calculation, Rev. 4 Handouts: 20ST-2.4A, Rev. 4 (markup copy)

Initiating Cue: The Shift Manager directs you to review the QPTR calculation and report your results.

Time Critical Task: No Validation Time: 10 minutes BVPS NRC Ala SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 5 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Ala SRO (Denote Critical Steps with an asterisk)

CUE: Provide Candidate with a completed copy of 2OST-2.4A and the QPTR Parameter Sheet.

Performance Step: 1 Reviews the excore detector normalization factors.

Standard: No action required.

Comment:

Performance Step: 2 Reviews upper and lower quadrant excore nuclear instrument detector outputs for each quadrant.

Standard: Reviews values of detector current output for each quadrant on Data Sheet 1.

Comment:

Performance Step: 3 Checks for correct value of current by multiplying each detector current reading by its normalization factor to obtain a corrected current.

Standard: Determines corrected current values are SAT.

NOTE: Candidate may complete the review by performing the calculations; however, this is not required for the JPM.

Comment:

BVPS NRC Ala SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 5 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Ala SRO (Denote Critical Steps with an asterisk)

Performance Step: 4 Reviews average upper quadrant and average lower quadrant excore NI detector outputs.

Standard: Determines the average currents are SAT.

NOTE: Candidate may complete the review by performing the calculations; however, this is not required for the JPM.

Comment:

Performance Step: 5 Compares QPTR to Acceptance Criteria.

Standard: Determines that QPTR exceeds 1.02 on N43B (1.096).

Identifies applicability of T.S. 4.2.4.a.

Comment:

Terminating Cue: When the Candidate reports the results, the evaluation for this JPM is complete.

BVPS NRC Ala SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 5 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC Ala SRO Job Performance Measure No.: 2002 NRC Ala SRO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS NRC Ala SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 5 Form ES-C-1 JPM CUE SHEET 2002 NRC Ala SRO INITIAL CONDITIONS: The Unit is in Mode 1 at 80% power.

"* The plant computer is NOT available.

"* All power range channels are operable.

"* Normalization factors have been provided by Reactor Engineering.

INITIATING CUE: The Shift Manager directs you to review the QPTR calculation and report your results.

BVPS NRC Ala SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 1300-002-03-023 Task

Title:

Review Operating Logs JPM No.: 2002 NRC Al b SRO K/A

Reference:

2.2.12 (3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

The RO has just finished taking the 0000 to 0800 readings for the L5, Surveillance Verification Log.

Task Standard: Identifies out-of-specification reading and T.S. 3.5.1.a requirements.

Required Materials: None General

References:

20M-54.3.L5, Surveillance Verification Log, Rev. 39 Handouts: 20M-54.3.L5, Rev. 39 (markup copy)

T.S. 3.5.1 Initiating Cue: You are directed to perform a review of the L-5, Surveillance Verification Log and report your results.

Time Critical Task: No Validation Time: 5 minutes BVPS NRC Al b SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 2 of 4 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC Al b SRO (Denote Critical Steps with an asterisk)

Note: Provide Candidate with a copy of the completed L5 log. Do not provide T.S.

reference at this time.

  • Performance Step: I Reviews L-5 log entries.

Standard: Reviews log entries and determines that 2SIS-TK-21A level channels indicate greater than the 5% allowance.

Comment:

Performance Step: 2 Determines T.S. requirements.

Standard: Refers to Technical Specification 3.5.1 .a requirement to restore the accumulator to operable status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

CUE: If requested, provide the Candidate with a copy of T.S. 3.5.1.

Comment:

Terminating Cue: When the Candidate reports the results, the evaluation for this JPM is complete.

BVPS NRC Al b SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 4 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC Alb SRO Job Performance Measure No.: 2002 NRC Al b SRO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS NRC Al b SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 4 Form ES-C-1 JPM CUE SHEET 2002 NRC Alb SRO INITIAL CONDITIONS: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

The RO has just finished taking the 0000 to 0800 readings for the L5, Surveillance Verification Log.

INITIATING CUE: You are directed to perform a review of the L-5, Surveillance Verification Log and report your results.

BVPS NRC Al b SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.:

Task

Title:

Review AC Sources Alignment JPM No.: 2002 NRC A2 SRO Verification K/A

Reference:

2.2.12 (3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

"* The 2-1 Emergency Diesel Generator was declared inoperable and removed from service 30 minutes ago.

"* The PO has completed 2OST-36.7, Offsite to Onsite Power Distribution System Breaker Alignment Verification.

"* The 2-2 Emergency Diesel Generator was tested satisfactorily per T.S. 4.8.1.1.2.a.5.

Task Standard: Identifies the error and determines T.S. action requirement.

Required Materials: None General

References:

2OST-36.7, Offsite To Onsite Power Distribution System Breaker Alignment Verification, Rev. 8 T.S. 3.8.1.1 Handouts: 20ST-36.7, Rev. 8 (markup copy)

T.S. 3.8.1.1 Initiating Cue: The Shift Manager directs you to review the completed 20ST-36.7 and report your results.

Time Critical Task: No Validation Time: 10 minutes BVPS NRC A2 SRO NUREG 1021, Revision 8, Supplement 1

Page 2 of 4 Form ES-C-1 Appendix C PERFORMANCE INFORMATION 2002 NRC A2 SRO (Denote Critical Steps with an asterisk)

Performance Step: 1 Reviews Data Sheet 1.

Standard: Reviews Data Sheet 1 and identifies that the neon light for ACB 342 is listed as OFF.

Determines from Note 3 that the neon lamp is required for operability of the automatic bus transfer in Mode 1.

CUE: If the Candidate asks the status of the bulb, inform that a bulb check was SAT.

Comment:

NOTE: Provide the Candidate a copy of the T.S. handout.

Performance Step: 2 Report results and T.S. action requirement.

Standard: Informs Shift Manager that Acceptance Criteria is NOT met and that T.S. 3,8.1.1.c action statement requires restoring 1 of the inoperable sources to operable status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

CUE: If necessary, prompt the Candidate to determine the T.S. action statement requirement for an inoperable offsite circuit and diesel generator.

Comment:

Terminating Cue: When the Candidate reports the results, the evaluation for this JPM is complete.

BVPS NRC A2 SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 4 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC A2 SRO Job Performance Measure No.: 2002 NRC A2 SRO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS NRC A2 SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 4 Form ES-C-1 JPM CUE SHEET 2002 NRC A2 SRO INITIAL CONDITIONS: The plant is in Mode 1 at 100% power with all systems in their normal operating alignment.

"* The 2-1 Emergency Diesel Generator was declared inoperable and removed from service 30 minutes ago.

"* The PO has completed 20ST-36.7, Offsite to Onsite Power Distribution System Breaker Alignment Verification.

"* The 2-2 Emergency Diesel Generator was tested satisfactorily per T.S. 4.8.1.1.2.a.5.

INITIATING CUE: The Shift Manager directs you to review the completed 20ST-36.7 and report your results.

BVPS NRC A2 SRO NUREG 1021, Revision 8, Supplement I

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 1350-006-03-023 Task

Title:

Approve Emerqency Exposure JPM No.: 2002 NRC A3 SRO K/A

Reference:

2.3.4 (3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testingq:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: "* A Site Area Emergency has been declared at Unit 2.

"* An individual is trapped and bleeding in a Locked High Radiation Area

"* An immediate response is necessary to save their life.

"* It has been clearly determined that actions establishing adequate or equivalent protection, with less dose are not readily available.

"* Bill Jones, a qualified radiation worker has volunteered to perform the rescue activity and has been briefed on risks of projected radiation exposure.

"* The individual has a year to date exposure of 880 mR (TEDE).

"* The area dose rate is 1,110 mR/hr and there is no airborne radioactivity present.

"* The rescue activity could take up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Task Standard: Authorize the rescue activity in accordance with EPP/IP 5.3.

Required Materials: None General

References:

EPP/IP 5.3 Emergency Exposure Criteria and Control, Rev. 8 Handouts: EPP/IP 5.3, Rev. 8 Initiating Cue: As the Emergency Director, you are to evaluate the listed conditions and determine if an emergency exposure can be authorized.

Time Critical Task: No Validation Time: 5 minutes BVPS NRC A3 SRO NUREG 1021, Revision 8, Supplement 1

Appendix Page 2 of 4 Form ES-C-1 PERFORMANCE INFORMATION 2002 NRC A3 SRO (Denote Critical Steps with an asterisk)

Performance Step: 1 Per Attachment 1, determine the appropriate Emergency Exposure (Step E.1.1) Authorization Limit.

Standard: Using Attachment 1, determines that an emergency exposure authorization is allowed based on:

Block 1: Declared Emergency Site Area Personnel are qualified Yes No declared pregnant workers Yes (Male)

Block 2: Exposure necessary to (1) save human life Yes Block 3: Personnel are volunteers and have been Yes briefed on risks of projected radiation exposure Block 4: Sr. Vice President authorization for No (4,440 exposure > 75 rem mR)

Block 5: Limit exposure to: 75 rem TEDE; 225 rem Yes lens of eye; 750 rem organ CDE NOTE: If asked, inform the Candidate that the Emergency Exposure Authorization Form will not be filled out at this time.

Comment:

Terminating Cue: When the Candidate reports their determination, the evaluation for this JPM is complete.

BVPS NRC A3 SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 4 Form ES-C-1 VERIFICATION OF COMPLETION 2002 NRC A3 SRO Job Performance Measure No.: 2002 NRC A3 SRO Examinee's Name:

Date Performed:

Facility Evaluator: N/A Number of Attempts: N/A Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS NRC A3 SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 4 Form ES-C-1 JPM CUE SHEET 2002 NRC A3 SRO INITIAL CONDITIONS: "* A Site Area Emergency has been declared at Unit 2.

"* An individual is trapped and bleeding in a Locked High Radiation Area

"* An immediate response is necessary to save their life.

"* It has been clearly determined that actions establishing adequate or equivalent protection, with less dose are not readily available.

"* Bill Jones, a qualified radiation worker has volunteered to perform the rescue activity and has been briefed on risks of projected radiation exposure.

"* The individual has a year to date exposure of 880 mR (TEDE).

"* The area dose rate is 1,110 mRlhr and there is no airborne radioactivity present.

"* The rescue activity could take up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

INITIATING CUE: As the Emergency Director, you are to evaluate the listed conditions and determine if an emergency exposure can be authorized.

BVPS NRC A3 SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 1350-004-03-023 Task

Title:

Classify an EPP Event JPM No.: 2002 Audit A4 SRO Scenario No. 1 K/A

Reference:

2.4.41 (4.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The simulator scenario just completed.

Task Standard: The proper EPP classification is made within 15 minutes.

Required Materials: None General

References:

EPP/I-1 B, Recognition and Classification of Emergency Conditions, Rev. 2 Handouts: None Initiating Cue: Classify the events in the scenario just completed in accordance with EPP/I-1 B, Recognition and Classification of Emergency Conditions.

Time Critical Task: Yes Validation Time: 5 minutes BVPS-2 Audit A4 SRO NUREG 1021, Revision 8, Supplement 1

Page 2 of 4 Form ES-C-1 AppendixC PERFORMANCE INFORMATION 2002 Audit A4 SRO Scenario No. 1 (Denote Critical Steps with an asterisk) completed a Note: This JPM is designed to be administered after the Candidate has EPP simulator scenario. The Candidate should be directed to reference the classification procedure located in the Simulator.

  • Performance Step: I Classify the event in accordance with the Emergency Plan.

Standard: Properly classifies the event within 15 minutes.

Scenario #1: Site Area Emergency based on Tab 2.3, Failure of Rx Protection Scenario #2: Alert based on Tab 1.2, RCS Barrier Scenario #3: Alert based on Tab 2.3, Failure of Rx Protection, or Tab 3.1, Loss of Power NOTE: A loss of both 4kV busses for greater than 15 minutes is classified as a Site Area Emergency per Tab 3.1.

Scenario #4: Alert based on Tab 1.2, RCS Barrier Comment:

Terminating Cue: When the Candidate has classified the event, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement 1 BVPS-2 Audit A4 SRO

Appendix C Page 3 of 4 Form ES-C-1 VERIFICATION OF COMPLETION 2002 Audit A4 SRO Scenario No. 1 Job Performance Measure No.: 2002 NRC A4 SRO Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

BVPS-2 Audit A4 SRO NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 4 Form ES-C-1 JPM CUE SHEET 2002 Audit A4 SRO Scenario No. 1 INITIAL CONDITIONS: The simulator scenario just completed.

INITIATING CUE: Classify the events in the scenario just completed in accordance with EPP/I-1 B, Recognition and Classification of Emergency Conditions.

BVPS-2 Audit A4 SRO NUREG 1021, Revision 8, Supplement I