IR 05000334/2002301
| ML023360205 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/02/2002 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Bezilla M FirstEnergy Nuclear Operating Co |
| Shared Package | |
| ML021400097 | List: |
| References | |
| 50-334/02-301 | |
| Download: ML023360205 (15) | |
Text
December 2, 2002
SUBJECT:
BEAVER VALLEY UNIT 1 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 50-334/02-301
Dear Mr. Bezilla:
This report transmits the results of the reactor operator (RO) and senior reactor operator (SRO)
licensing examinations conducted by the NRC during the period of September 30 to October 8, 2002. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 8, Supplement 1).
Based on the results of the examination, all fourteen applicants passed all portions of the examination. The applicants included 3 ROs and 11 instant SROs. Examination results indicated that generally the applicants were well prepared for the examination. On October 31, 2002, final examination results, including individual license numbers, were given during a telephone call between Mr. T. Fish and Mr. C. Hynes and others of your staff. The NRC also noted your staff improved their implementation of the exam process as compared to the effort associated with the previous Unit 1 exam. No findings of significance were identified.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (SRO/RO Written-Accession Number ML023020109; SRO/RO Operating Section A-Accession Number ML023020126; SRO/RO Operating Section B-Accession Number ML023020135; and SRO/RO Operating Section C-Accession Number ML023020177). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ADAMS.html (the Public Electronic Reading Room).
Mr. Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.
50-334 License No.
DPR-66 Enclosure:
Initial Examination Report No. 50-334/02-301 cc w/encl:
J. Lash, Plant General Manager F. von Ahn, Director, Plant Engineering T. Cosgrove, Director, Work Management R. Donnellon, Director, Plant Maintenance M. Pearson, Director, Services and Projects L. Freeland, Manager, Nuclear Regulatory Affairs & Corrective Actions M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety Commonwealth of Pennsylvania State of Ohio State of West Virginia
M