IR 05000400/1988040
| ML18005A843 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/07/1989 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Eury L Carolina Power & Light Co |
| References | |
| NUDOCS 8904210071 | |
| Download: ML18005A843 (2) | |
Text
gc CP~ PATED 31 FTKBUTIOY DEMONSTRATlON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8904210071 DOC.DATE: 89/04/07 NOTARIZED:
NO FACIL:50-400 Shearon Harris Nuclear power plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VERRELLI,D.M.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION EURY,L.W.
Carolina Power 6 Light Co.
DOCKET g
05000400 SUBJECT:
Ack receipt of 890322
& 29 ltrs informing NRC of steps taken to correct violations noted in Insp Rept 50-400/88-40.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR l ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
05000400~
INTERNAL:
EXTERNAL:
RECIPIENT ID CODE/NAME PD2-1 PD ACRS AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12 O~X'BBE N, J EG AL
LPDR NSIC COPIES LTTR ENCL
1
1
2
1
RECIPIENT ID CODE/NAME BECKER,D AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS1 RGN2 FILE
NRC PDR COPIES LTTR ENCL
1
1
1
1
NCTE 'IO ALL "RZDS" RECIPIENZS ~
PIZASE HELP US 'IO REDUCE HASTE!
CGMI'ACT 'IHE DOCUMENI'ONGEAL DESK, RXM Pl-37 (EXT. 20079)
%0 EZZMZÃhTE YOUR MME PRR DZSTEGBUTIGN LISTS BDR DOCMEÃIS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL D
D S
APq
~> 7 1399 Docket No. 50-400 License No. NPF-63 Carolina Power and Light Company ATTN:
Mr. Lynn W. Eury Executive Vice President Power Supply P. 0.
Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-400/88-40 Thank you for your responses of March
and March 29, 1989, to our Notice of Violation issued on March 3, 1989, concerning activities conducted at your Harris facility.
We have evaluated your responses and found that they meet the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely,
.0 David M. Verre 1 1 i, Chief Reactor Projects Branch
Division of Reactor Project cc:
R. A. Watson, Vice President Harris Nuclear Project C.
S. Hinnant, Plant General Manager State of North Carolina bcc:
C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments Document Control Desk RII HDance 04/7 /89
+9()421007 050~p4gO q aSO407 pgR pgQCK IQ
W~o/