IR 05000400/1988025
| ML18005A705 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/15/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8811220503 | |
| Download: ML18005A705 (3) | |
Text
'4,C CKXZRATZD 3)
BUTJON SEMIS TION SYSTEM j
REGULAT XNFORMATXON DISTRIBUTION
'YSTEM (RXDS)
ACCESSXON NBR:8811220503 DOC.DATE: 88/ll/15 NOTARIZED: NO DOCKET N
ACXL'.50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400
,nUTH.'NAME AUTHOR AFFILIATION VERRELLI,D.M.
Region 2, Ofc of the Director RECXP.NAME RECIPIENT AFFILIATION UTLEYiE.E.
Carolina Power 6 Light Co.
SUBJECT:
Ack receipt of 881026 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-400/88-25.
DISTRXBUTXON CODE:
XEOlD COPXES RECEIVED:LTR /
ENCL
. 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
05000400 INTERNAL:
. ZERNAL:
RECIPIENT ID CODE/NAME PD2-1 PD ACRS DEDRO NRR/DLPQ/PEB
NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12
E MANiJ REG FIZr
LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME BUCKLEY,B AEOD NRR MORISSEAU g D NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS1 RGN2 FILE
NRC PDR RESL MARTIN,D COPIES LTTR ENCL
,1
1
1
1 ALL t'RIES" RECXPXENIS PLEASE HELP US IO REESCB VVLPZi~i!
CXÃIRCI'IHE DOCUMENT OZGBDL DESK, RCCN P1-37 (EXT. 20079)
KO ELXNXNATE KRR SAME PKH DXSKGHUTXQN LXBTB KR DQCUKWLS KÃJ EON'T MKDf TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL 2+
arolina Power and Light Company
~
~
~
ATTN:
Mr. E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.
Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50"400/88"25 Thank you for your response of October 26, 1988, to our Notice of Violation issued on September 26, 1988, concerning activities conducted at your Shearon Harris facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Original signed by P. Fredrickson David M. Verre1 1 i, Chief Reactor Projects Branch
Division of Reactor Projects cc:
R A. Watson, Vice President Harris Nuclear Project D. L. Tibbitts, Director of Regulatory Compliance C; S. Hinnant, Plant General Manager
~
~
S ate of North Carolina bcc.
~ Barth, OGC RC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments DRS Technical Assistant Document Control Desk 8811220503 881115 PDR ADOCH, 05000400
PNU RII RII B
r oil:tm PF drickson 11//