gc CE1ZP>TED I SIRIBt.'TlON DEMONRXTl0.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8812300037 DOC.DATE: 88/12/21 NOTARIZED:
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ERNST, M.L.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY,E.E.
Carolina Power
& Light Co.
SUBJECT:
Ack receipt of 881129 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-400/88-27.
'DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR CENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Respohse NOTES:Application for permit renewal filed.
DOCKET 1T 05000400 8'5000400 INTERNAL:
EXTERNAL:
RECIPIENT ID CODE/NAME PD2-1 PD ACRS AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A'UDOCS-ABSTRACT OGC/HDS 1 RGN2 FILE
LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME BUCKLEY,B AEOD DEDRO NRR/DLPQ/PEB
NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12 E
N,J G
NRC PDR RESL MARTIN,D COPIES LTTR ENCL R
I S
NOTE 'LO ALL "RIDS" RECIPIENIS'EZASE HELP US K) REDUCE RASTE!
CXÃi'ACZ THE DOI.XMWZ CONSOL DESK/
RCCM Pl-37 (EXT. 20079)
KO EIZlQ2KLTE YOUR NAME FRY DISTEUBUTION LISTS FOR DOCUMEM,'S YOU DGNiT NEZDf
.0, TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
'arolina
"ower and Light Company ATTN:
Mr.
E.
E, Utley Senior Executive Vice President Power Supply and Engineering and Construction P ~ 0.
Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT'NSPECTION REPORT NO. 50-400/88-27 Thank you for your response of. November 29, 1988, to= our Notice of Violation issued on October 31, 1988, concerning activities conducted at your Harris facility under NRC NPF-63.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We wi 11 examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Malcolm L. Ernst Acting Regional Administrator cc:
R. A. Watson, Vice President Harris Nu'clear Project D. L. Tibbitts, Director of Regulatory Compliance C.
S. Hinnant, Plant General Manager
'tate of North Carolina bcc:
C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments U. Potapovs, NRR DRS Technical Assistant Document Control Desk RI I N erriweather: ser CPaul k 12///(/88 12/////88 RII TCon n
12//Cj /88 RI AHe 12/j//88 RI I RI GJenkins AGib 12/
/88 12@11 /88 88i2-00037 88i22i PDR AQOCK 05000400 Q
PDC RII RI RI PF e rickson Leye~S or 12+/88 12/~/88 1 ~/88