IR 05000400/1988033
| ML18005A730 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/16/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8812210016 | |
| Download: ML18005A730 (2) | |
Text
gC CE1ZRATED DISTRIBUTION DEMONIST'RATION SYSTEM v
REGULATORYOlFORMATZON DZSTRZBUTZON S'eI'EM (RZDS)
ACCESSION NBR!8812210016 DOC.DATE: 88/12/16 NOTARIZED: NO DOCKET I
~
~
~
~
~
~
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION VERRELLI,D.M.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEYFE.E.
Carolina Power
& Light Co.
SUBJECT:
Ack receipt of 881129 ltr informing NRC of step taken to correct violations noted in Insp Rept 50-400/88-33.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR 2 ENCL O SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
osooo4oo
~
RECIPIENT ID CODE/NAME PD2-1 PD EG ERNAL: LPDR NSIC INTERNAL: ACRS DEDRO NRR/DLPQ/PEB
NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12'E BER J
F COPIES LTTR ENCL RECIPIENT ID CODE/NAME BUCKLEYIB AEOD NRR SHANKMANFS NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS1 RGN2 FILE
NRC PDR RESL MARTIN,D COPIES LTTR ENCL h
D NOTE 10 ALL zRIDSit RECIPIENTS PIZASE HELP US TO REDUCE KLSTE!
CGHZACT 'IHE DOCUMEPI'OPED DESK, RXN P1-37 (EXT. 20079)
KQ 3KZMZNATB WAR HAMB FRCH DISTRIBUTION LISTS H3R DOCUMENTS RÃJ DGNFT HEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
December 16, 1988 Carolina Power and Light Company ATTN:
Mr. E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P.
O.
Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
REPORT NO. 50-400/88"33 Thank you for your response'f November 29, 1988, to our Notice of Violation issued on October 31, 1988, concerning activities conducted at your Shearon Harris facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Original Signed by.
David H. Verrelli David M. Verrelli, Chief Reactor Projects Branch
Division of Reactor Projects cc:
R. A. Watson, 'Vice President Harris Nuclear Project D.
L=. Tibbitts, Director of Regulatory
.
Compliance C.
S. Hinnant, Plant General Manager State of North Carolina bcc:
C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments DRS Technical Assistant Document Control Desk RCarroTPer rde 'on 12//j/88 12//4/88 88122100kb 881216 PDR ADOCK 05000400 G
PNU