IR 05000400/1988028
| ML18005A731 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/09/1988 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8812210021 | |
| Download: ML18005A731 (2) | |
Text
AC CELE RA.TED Dl BUTJOY DEMONSTRA OY SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:8812210021 DOC.DATE: 88/12/09 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION COLLINS,D.M.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY,E.E.
Carolina Power
& Light Co.
SUBJECT:
Ack receipt of 881112 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-400/88-28.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR /
ENCL D SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
DOCKET "
05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB
NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12
BE N,J RE
TERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME BUCKLEY,B AEOD NRR SHANKMAN,S NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS1 RGN2 FILE
NRC PDR RESL MARTIN,D COPIES LTTR ENCL R
NOTE IO ALL "RIDS" RECIPIENTS'LEASE HELP US K) REDUCE WASTE!
CORI'ACT 'IHE DOCUMERZ COFZBOL DESK, ROOM Pl-37 (EXT. 20079)
TO EZZHXNATB YOUR NAME PRCH DIPHGBVTICN LISTS PDR DOCUMEMZS MXJ DGNIT NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL 2+
Carolina Power and Light Company
~
~
ATTN:
Hr.
E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.
Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-400/88-28 Thank you for your response of November 12, 1988, to our Notice of Violation, issued on October 18, 1988, concerning activities conducted at your Shearon Harris facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We have also reviewed your request for mitigation of the Severity Level of Violation C, and in consideration of the information provided in your response, have changed our records to assign a
Severity Level V to this violation.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, cc: /R. A. Watson, Vice President Harris Nuclear Project D. L. Tibbitts, Director of Regulatory Compliance
/C.
S. Hinnant, Plant General Nanager State of North Carolina bccJ
. Garth, OGC NRC Resident Inspector u/A. Upchurch, Chairman, Triangle j Council of Governments DRS Technical Assistant Document Control Desk 0;IgiOaf Signed BP 0.M. CoIlias~
Douglas N. Collins, Acting Director Division of Radiation Safety and Safeguards Rl RII g1, RII Ib RII RII NLauer CHosey TDe er PFredri kson GJenk ns lg/e /88 Tj/g /88 Q/CO/88 I+) /88 12/) /88 8S j~+$ $ Q0og
-,q)~0, PDR AOOCK C>5000400 PQQ
$0 ZEc l