SALP BOARD REPORT
!
U.S. NUCLEAR REGULATORY COMMISSION
REGION V
SYSTEMATIC ASSESSMENT OF. LICENSEE PERFORMANCE
,
50-397/86-03 WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2
'
FEBRUARY 1, 1985 THROUGH JANUARY 31, 1986 i
,
i 0607180017 860702 PDR ADOCK 00000397 G
._.
_
_
-
...,
.
- -
~.
.
-
. ~.
- -- --.
-
- -
- -
....
-...
.
i
'
.
!
'
SUMMARY
.
Inspections Conducted *
. Enforcement Items **
Functional Inspection * Percent Severity Level-Area.
Ilours of Effort I II III IV V A.
Plant Operations 1586
2 B.
Radiologic ~l Controls 234
1
a C.
Maintenance 137
2 D.
Surveillance '
237
1
E.
Fire Protection
2
1 F.
G.
Security -
58'
H.
~0utages
,'238
1
I.
tQuality-Programs /
. 5 4d1
Administrative
-
.
.
+>
,,
- ,.
,
J.
Licensing Activities 340'
'
,'
K.
Training / Qualification 111
Effectiveness
'
~
"
-J
,
,
.-
_ _
g
_ _
~
Totals.-,
'4017
.
100
0
9 5
Data reflect Inspection Report-Nos. 85-07, 85-08, and 85-10 through 86-04. Allocations of inspection hours vs. functional areas are approximations based.upon inspection report data, and~ include onsite and in-office inspectica efforts.
-
Severity levels are discussed in 10 CFR 2, Appendix C.
No deviations were identified during.this SALP perio.
TABLE _2 ENFORCEMENT ITEMS Inspection Severity Functional Report No.
Subject Level Area 85-05 Two fire brigade members did not V
E attend required drills Flammable and combustible material IV E
was present in an unauthorized location 85-11 Inadequate implementation of Measuring IV C
and Test Equipment Controls The full CNSRB were not reviewing V
I all safety evaluations of procedure changes, modifications, tests and experiments Four containment isolation valves IV A
requiring monthly verification of i
closure were no' verified for a two month period 85-17 Failure to properly establish and V
D implement code requirements regarding' evaluation of valve stroke times 85-20 Failure to document appro' val of IV H
, deviation _from overtime requirements prior to exceeding overtime criteria Failure to adequately post and label IV B
radiation area t
Failure to implement procedure to IV C
ensure proper tool control 85-22 Fire protection procedures not IV E
fully implemented, multiple examples 85-29 Failure to adequately post V
B radioactive material storage area 85-30 Lack of procedure adherence while IV A
adjusting suppression pool level
.-
..
..
.-
-
.
,
TABLE 2 - ENFORCEMENT ITEMS (Cont'd)
Inspection Severity Functional Report No.
Subject Level Area 85-36-Improper maintenance on strip boxes IV D
and junction boxes following surveillance 85-37 Failure to follow administrative V
D procedures for control of locks on secured valves
.
s
.
i
,
_ _.
.
-
TABLE 3 SYNOPSIS OF LICENSEE EVENT REPORTS (LERs)
Functional SALP Cause Code *
Area A
B C
D E
X Totals A.
Plant Ops
1
1
3
B.
Rad. Controls
-
-
-
-
-
-
C.
Maintenance
3
-
3
-
D.
Surveillance
1
-
2
16 E.
Fire Protection ~
-
-
-
-
-
F.
Emerg. Prep.
>
-
-
-
-
-
-
G.
Security
-
-
-
-
-
-
H.
Outages
-
-
-
-
-
-
I.
Quality / Admin
2
-
-
-
-
J.
Licensing
-
-
-
-
-
-
K.
Training / Qual.
-
-
-
-
-
-
Fffectiveness Totals
9
9
4
- A - Personnel Error B - Design, Manufacturing or Installation Error C - External Cause D - Defective Procedures
.i E - Component Failure
'
X - Other
.
The above data are based upon LERs 85-11 through 85-63.
Three of these LERs l
reported two separate events which were assigned to separate functional areas and/or cause codes.
'
.
-
-
- -
- -
-
- -