IR 05000397/1986012

From kanterella
Jump to navigation Jump to search
Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls
ML20203L785
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/25/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20203L777 List:
References
NUDOCS 8608290178
Download: ML20203L785 (2)


Text

. AUG 251986

'

Sa neog

-

o UNITED STATES E ' I ,% NUCLEAR REGULATORY COMMISSION

$( a$ REGION V 0,, g 1450 MARIA LANE, SUITE 210

,e WALNUT CREEK. CALIFORNI A 9459G

% * *% ***# NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Washington Public Power Supply System

'

Name of Facility: WNP-2 Docket No. 50-397 Date and Time of Meeting: August 28, 1986, 9:00 Location of Meeting: Region V Office 1450 Maria Lane, Suite 210 Walnut Creek, California Purpose of Meeting: Enforcement Conference: Apparent violations involving Equipment Qualification (50-397/86-12), the Region V Team Inspection (50-397/86-11) and control of combustible materials (50-397/86-22).

NRC Attendees: J. B. Martin, Regional Administrator, RV D. F. Kirsch, Director, Division of Reactor Safety and Projects A. E. Chaffee, Chief, Reactor Projects Branch P. H. Johnson, Chief, Reactor Projects Section 3 P. M. Qualls, Reactor Inspector A. D. Johnson, Enforcement Officer, RV ,

R. T. Dodds, Senior Resident Inspector, WNP-2 l J. O. Elin, Acting Chief, Reactor Safety Branch I D. J. Willett, Reactor Inspector R. C. Barr, Resident Inspector, WNP-2 S. A. Richards, Chief, Engineering Section Licensee Attendees: D. W. Mazur, Managing Director J. W. Shannon, Deputy Managing Director

'

J. D. Martin, Assistant Managing Director for Operations R. B. Glasscock, Director of Licensing and Assurance J. P. Burns, Director of Engineering C. M. Powers, WNP-2 Plant Manager J. W. Baker, WNP-2 Assistant Plant Manager G. D. Bouchey, Director of Support Services C. H. McGilton, Quality Assurance Program Manager State of Washington: B. Miller, Energy Facility Site Evaluation Council M. Mills, Energy Facility Site Evaluation Council Bonneville Power Authority: D. Williams

Union Local 77: J. Trumble, Business Agent

'

NOTE: Attendance at this meeting by NRC personnel other than those listed above should be made kncwn by August 25, 1986, 12:00 noon, via a telephone call to P. Qualls, FTS 463-375 PDR ADOCK 05000397 g PDR i

- , .- -- . - _ . . ., _ . - - . . , , ,,,-

-

' - AUG 251986

.-

a nta u,

'o UNITED STATES E\- ' NUCLEAR REGULATORY COMMISSION

'- 0 C REGION V g ,&g 1450 MARIA LANE, SUITE 210 WALNUT CRE EK, CALIFORNI A 94596 g

~***** NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Washington Public Power Supply System Name of Facility: WNP-2 Docket No. 50-397 Date and Time of Meeting: August 28, 1986, 1:00 Location of Meeting: Region V Office 1450 Maria Lane, Suite 210 Walnut Creek, California Purpose of Meeting: Discussion of 1985-1986 SALP Evaluation NRC Attendees: J. B. Martin, Regional Administrator, RV D. F. Kirsch, Director, Division of Reactor Safety and Projects A. E. Chaffee, Chief, Reactor Projects Branch P. -H. Johnson, Chief, Reactor Projects Section 3 P. M. Qualls, Reactor Inspector A. D. Johnson, Enforcement Officer, RV R. T. Dodds, Senior Resident Inspector, WNP-2 J. O. Elin, Acting Chief, Reactor Safety Branch R. C. Barr, Resident Inspector, WNP-2 A. -D. Toth, Reactor Inspector S. A. Richards, Chief, Engineering Section Licensee Attendees: D. W. Mazur,' Managing Director J. W. Shannon, Deputy Managing Director J. D. Martin, Assistant Managing Director for Operations R. B. Glasscock, Director of Licensing and Assurance J. P. Burns, Director of Engineering C. M. Powers, WNP-2 Plant Manager J. W. Baker, WNP-2 Assistant Plant Manager G. D. Bouchey, Director of Support Services C. H. McGilton, Quality Assurance Program Manager State of Washington: B. Miller, Energy Facility Site Evaluation Council M. Mills, Energy Facility Site Evaluation Council Bonneville Power Authority: D. Williams NOTE: Attendance at this meeting by NRC personnel other than those listed above should be made known by August 25, 1986, 12:00 noon, via a telephone call to P. Qualls, FTS 463-375 _