IE Insp Rept 50-397/81-24 During Nov 1981.No Noncompliance Noted.Major Areas Inspected:Licensee & Contractor Activities to re-evaluate & Improve Detailed Work Methods
ML17276A844
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/21/1981
From: Dodds R, Feil R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML17276A840 List:
References
50-397-81-24, NUDOCS 8201130261
Download: ML17276A844 (6)


Text

U.S.

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION V

Report No. 50-397 81-24 Docket No.

50-397 License No.

Safeguards Group Licensee:

washin ton Public Power P.

0.

Box 968 Richland Washin ton 99352 Facility Name:

Washin ton Nuclear Pro'ect No.

W P-

)

InSpeCtiOn at:

WNP-2 Site Benton Count Washin ton Inspecti on conducted:

Novemb er 1981 nspectors:

R. A. Feil, Senior Resident Inspector Da igned Date Signed Date Signed Approved By:

Summary:

R.

T. Dodds, Chief Reactor Construction Projects Section

D te igned Ins ection durin November 1981 Re ort No. 50-397/81-24)

Areas Ins ected:

Routine, unannounced inspection of licensee and contractor activities to re-evaluate and improve detailed work methods.

The inspection involved 70 inspector-hours on-site by the NRC resident inspector.

Results:

No items of noncompliance or deviations were identified.

8201 130kbi, t'1'1222

~

PDR ADOCK",05000397 8,

"

PDR'

~ ~'

J e

/

J

J

I I

)

,1

.t

DETAILS

'I

'5 1.

Persons Contacted Washi G.

K.

W.

C.

'H. A.

B. A.

xJ

~

RE

>R.

T.

R. L.

R.

G.

Becht

"'D.

K.

  • M. J.
  • DE RE Burns n ton Public Power Su

'..S s'tern, WPPSS Jl.

C Afflerbaok,,Manager; Test and Startup Bibb,,Deputy Program~ Dir'e'ctor Crisp, Maeagep, Con'struction Holmberg;, Manage'r",,Engineeiing,;...,

Honekamp~,.Technical Spec'ali'st-"'-,'ohnson Manag'er~, Quality'ssurance Knawa, Manageri:, Qu'a3,ity,Veri&.cation Program Documentation Matlock," Piogram"Direct'or el Power -Cor oration-BPCj'I

<I'I Cosgr'ove;. Quality Assurance,Engrrieer, Jacobson,Qua'lity Assurance Manager Johnson",

Qua'1ity Assurance Manager and Roe En ineers

.

B&R'.

Hoopingarner, Senior Engineer R. Popielarczyk, Lead Mechanical Engineer H. Theroux, Mech'anical Engineer Wri ht-Schuchart-Harbor/Boecon Cor oration/General Ener Resources Inc.

(WBG P. Webster, Manager, Quality Assurance

  • Denotes those present at the Monthly Management meeting.

The inspector also conferred with other licensee and contractor personnel during the course of the inspection period.

2.

General R.

A. Feil was assigned as Senior Resident Inspector, WNP-2 on November 2,

1981.

A.'L. Toth, Senior Resident Inspector, WNP-1/4 temporarily assigned at WNP-2 since June 1981, returned to the WNP-1/4 site on November,23, 1981..

R.

T. Dodds, Section Chief, Reactor Projects Section 2 visited the site on'ovember 16-20, 1981, to assist in WNP-2 and WNP-1/4 resident inspectors and to observe some repairs to the sacrificial shield wal f I

). J

')

I I J'

JfI" IJ 7)I I9 I

))I.) ". +

J'

,

)I I

JIf )+

y i

J

ff v

)I

5

)

),,

~ J.

if C

i)

I

  • )

0'

sl

.I

I

,~4 I

'l e t

,)II I

The inspector attended several management meetings in the course of inspection activities.

%1 Facilit Tours

.P~

'I The inspectors observed work activities in progress, compeleted work and plant status in several 'areas of the plant during general inspections of,the plant.

The inspectors examined work for any obvious de'fects or noncompliance with regulatory requirements or license conditions.

Particular note was taken of the presence of quality control inspectors and quality con-trol evidence such as inspection records, material identifica-tion, nonconforming material identification, housekeeping and equipment preservation.

No items of noncompliance or deviations were identified.

Licensee Action on Previous Ins ection Findin s

(Closed Unresolved Item (50-397/79-12-02 Item 5)

Concrete Voids in Sacrificial Shield Wall The inspectors observed the filling of concrete voids in the sacrificial shield wall.

BISCO NS-1, a polymer baSe material, was applied into the void area.

The inspectors took note of the presence of QC inspectors and the adherence to procedures by the craftsmen.

Back up verification by the licensee will be accomplished during the Startup Radiation Scan Program, the results of which will be examined as -part of the routine in-spection program.

Mana ement Meetin s

The inspector met with the WPPSS site QA manager on December 4,

1981, to discuss the results of the inspection and to receive a status report of principal WPPSS activitie )I I

1'

I I

I 1,

I l4

~l J

fl ()

i 1