IR 05000397/1981003
| ML17276B442 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/19/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17276B443 | List: |
| References | |
| NUDOCS 8205240287 | |
| Download: ML17276B442 (2) | |
Text
MAY ig jager XE HQ, FIIiEOOHf Docket No. 50-397 Washington Public Pm~er Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352 Attention:
Mr. R. G. Matlock Program Director, WNP-2 Gentlemen:
Thank you for your letter dated May 3, 1982, informing us of the steps you have taken to correct items which we brought to your attention in our letter dated May 7, 1981.
Provided is an extension of the commitment date to July 30, 1982.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, T.
W. Bishop, Acting Chief Reactor Construction Pro)ects Branch bcc:
Document Control Desk (RIDS)
Distributed by RV w/cy ltr dtd 5/3/82:
State of WA (Lewis), Resident Inspector (Feil)
8205240287 820519 PDR ADOCK 05000397 PDR OFF<CEQ SURNAME(
DATE)
RV Dod cb
..5//f./82...
RV Elin
. 5/'/y/82 RV s/itx8~
NRC FORM 318 00/801 NRCM 0240 OFFICIAL RECORD COPY 0 USGPO: 1980-329.824
A I'
',
I I
g
~
r
~
'I v I I'
I C=
/
h.~
+)