ML17276A835
| ML17276A835 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/22/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17276A840 | List: |
| References | |
| NUDOCS 8201130256 | |
| Download: ML17276A835 (4) | |
See also: IR 05000397/1981024
Text
NHQ3rpx@~
OEt; 2,2
1981
Docket
No.
50-397
Washington Public Power
Supply
System
P. 0.
Box 968
Richland Washington
93352
Attention:
Dr.
R.
G. Matlock
Program Director
~gG
@~qgo
g
r+
Gentlemen:
Subject:
NRC Inspection
This refers
to the inspection
conducted
by Mr. R. A. Feil of this
office during November
1981, of activities authorized
by
NRC
t No.
CPPR-93,
and to the discussion
of our findings held by Mr.
Feil with Mr. R. T. Johnson
and other
members
of your staff at the
conclusion of the inspection.
Areas
examined
during this inspection
are described
in the enclosed
inspection report.
Mithin these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records, in-
terviews with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordane
with 10 CFR 2.790(a),
a copy of this letter
and the
enclosure will be placed in the
NRC Public Document
Room unless
you
notify this office, by telephone,
within ten days of the date of
this letter
and submit written appliction to withhold information
contained
therein within thirty days of the date of this letter.
Such application must
be consistent with the requirements
of 2.790
(b) (1)
~
820i'180256 Bii222
ADOCK 'OOD00397 <,"
PDR (,',~,
.RT4-
R. FeiP
OF+CEP
SURNAME/
DATEP
0 0 ~ ~ ~
1@enb
odds
5 ~ ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
2/>j/Sl
rry
0 ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
12/'Q /81
~
~
~
~
~
\\ ~
~
2/g//81
0 ~ ~ ~ ro
~ ~ ~ ~ ~ ~ ~
~ ~
~
NRC FORM 318110/801 NRCM 0240
OFFICIAL RECORD COPY
~ ~
~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ I
~
~ ~
I '
USGPO'98~29
821
I
lf
Qlip
H =~
'h
fy( 'f
pt
'v
W'e +p
II
r
1
." 4
DEg $ 2
1981
Should
you have
any questions
concerning this inspection,
we will
be glad to.discuss
them with you.
Sincerely,
ORl8lNAt. gfg<>-,'~ U>>;
R. T'DAOS
B.
H. Faulkenbexry,
Chief
Reactor
Construction
Prospects
Branch
Enclosure:
IE Inspection Report
No.'0-397/81-24
cc w/o enclosure:
Q.
C. Bibb, Deputy Pxogram Director
R.. B. Glasscock,
Quality Assurance Director
B
'\\
bcc:
DHB/Document Control
Desk
(RIDS)
Distributed by RV:
State of HA (Lewis)
Resident
Inspector
(3)
Enne1ken (ltr)
0
4
Ja
e'