ML17276A835

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-24 During Nov 1981.No Noncompliance Noted
ML17276A835
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/22/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17276A840 List:
References
NUDOCS 8201130256
Download: ML17276A835 (4)


See also: IR 05000397/1981024

Text

NHQ3rpx@~

OEt; 2,2

1981

Docket

No.

50-397

Washington Public Power

Supply

System

P. 0.

Box 968

Richland Washington

93352

Attention:

Dr.

R.

G. Matlock

Program Director

~gG

@~qgo

g

r+

Gentlemen:

Subject:

NRC Inspection

This refers

to the inspection

conducted

by Mr. R. A. Feil of this

office during November

1981, of activities authorized

by

NRC

t No.

CPPR-93,

and to the discussion

of our findings held by Mr.

Feil with Mr. R. T. Johnson

and other

members

of your staff at the

conclusion of the inspection.

Areas

examined

during this inspection

are described

in the enclosed

inspection report.

Mithin these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records, in-

terviews with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordane

with 10 CFR 2.790(a),

a copy of this letter

and the

enclosure will be placed in the

NRC Public Document

Room unless

you

notify this office, by telephone,

within ten days of the date of

this letter

and submit written appliction to withhold information

contained

therein within thirty days of the date of this letter.

Such application must

be consistent with the requirements

of 2.790

(b) (1)

~

820i'180256 Bii222

PDR

ADOCK 'OOD00397 <,"

PDR (,',~,

.RT4-

R. FeiP

OF+CEP

SURNAME/

DATEP

0 0 ~ ~ ~

1@enb

odds

5 ~ ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

2/>j/Sl

rry

0 ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

12/'Q /81

~

~

~

~

~

\\ ~

~

2/g//81

0 ~ ~ ~ ro

~ ~ ~ ~ ~ ~ ~

~ ~

~

NRC FORM 318110/801 NRCM 0240

OFFICIAL RECORD COPY

~ ~

~ ~ ~ ~

~ ~ ~ ~

~ ~ ~ ~

~ ~ ~ ~ I

~

~ ~

I '

USGPO'98~29

821

I

lf

Qlip

H =~

'h

fy( 'f

pt

'v

W'e +p

II

r

1

." 4

DEg $ 2

1981

Should

you have

any questions

concerning this inspection,

we will

be glad to.discuss

them with you.

Sincerely,

ORl8lNAt. gfg<>-,'~ U>>;

R. T'DAOS

B.

H. Faulkenbexry,

Chief

Reactor

Construction

Prospects

Branch

Enclosure:

IE Inspection Report

No.'0-397/81-24

cc w/o enclosure:

Q.

C. Bibb, Deputy Pxogram Director

R.. B. Glasscock,

Quality Assurance Director

B

'\\

bcc:

DHB/Document Control

Desk

(RIDS)

Distributed by RV:

State of HA (Lewis)

Resident

Inspector

(3)

Enne1ken (ltr)

0

4

Ja

e'