IR 05000397/1981021

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-397/81-21
ML17276B105
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/23/1982
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17276B106 List:
References
NUDOCS 8203020411
Download: ML17276B105 (2)


Text

FEB 23

)gsg Docket No. 50-397

.- IB?TxM0%Y Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr. R.

G. Matlock NNP-2 Program Director Gentlemen:

ECS~

4F]g Thank 'you'..for your letter dated January 20, 1982, informing us of the steps you have taken to correct items which we brought to your attention in our letter dated December 21, 1981.

Your corrective actions will be verified during a future inspection.

Your cooperation with us i.s appreciated.

Sincerely, B. H. Faulkenberry, Chief Reactor Construction Pro)ects Branch bcc:

Document Control Desk (RIDS)

Distributed by RV w/cy ltr dtd 1/20/82:

State of WA (Lewis), Resident 82030204l1 820223 PDR ADOCK 05000397

PDR Ii Egi OFFICE/

SURNAME/

DATEP 2/<'@82 RV RV RV

~ ~ ~

i

~ ~ ~ ~ 0

~ ~ ~ ~

~ ~

~ 0 ~ ~ ~ ~ ~

~

actin /cb Do Faul ber NRC FORM 3IB IIOIBOINRCM 0240 OFFICIAL RECORD COPY o USGPO: 1980-329.824

v ~

P- ~

(l:,0 yg%

W $ Q$ (gp

I