Text
Report No.
Docket No.
0-397 U. S.
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION V
License No.
CPPR-93 Safeguards Group Licensee:
o blic P wer Su
S stem Facility Name:
Inspection at:
Inspection conducted:
-
8 NP-2 to Inspectors:
. Carlson ea tor Inspector 7 ed]
Date Signed
\\
J. Will t, React Inspector Approved by:
D.
M. Sternberg, Chief, eactor Project Section
Reactor Operations and Nuclear Support Branch Summary:
Ins ection on June 22-25 1981 Re ort No. 50-397 81-13 Z(o 8'ate S gne o
ate S gne
~AI d:
II I, d
'
I I I p
Test Program and turnover inspection between project inspectors; reviewed procedure for RHR pump removal, overhaul and installation; observed partial reinstallation of RHR pump; and reviewed previous open items.
In additiori,'he inspectors toured the plant to obtain an independent update of plant construction status.
The inspection involved 42 onsite-hours by two NRC inspectors.
Results:
No deviations or items of noncompliance were identified.
8i07270i23 8i07i0 PDR ADOCK 05000397 PDR RV Form 219 (2)
il a
r E'I
!
fc g l
DETAILS Persons Contacted 2.
3.
4.
- C. S. Carlisle, Deputy Project Manager
- J.
D. Martin, Plant Manager
- G.
K. Afflerbach, Deputy Project Manager
- R. L. Corcoran, Plant Operations Superintendent J.
F. Peters, Plant Administrative Supervisor
- J.
M. Graziani, Operational gA Supervisor J. J. Bufis, Test Group Supervi'sor L.
D. Kassakatis, Test Group Supervisor
- R. T. Johnson, Project gA Manager
The inspectors also talked with 'other licensee personnel, including plant operators and maintenance personnel.,:
tl
- Denotes persons present at the exit 'interview.
Personnel and Or anizational Chan es t t The inspectors reviewed the latest organizational charts and the significant personnel changes.
J I
No items of noncompliance or deviations were,.ide'n'tified.
Test and Startu Instructions
'he inspectors reviewed the TSEI manual revisions with" startup personnel and additionally discussed the operational procedures completion schedule and their impact on the preop'erational test program.
t No items of noncompliance or deviations were identified; Inde endent Ins ection The inspectors reviewed two System Lineup Tests (SLT) for the tear-down, inspection, and re-build for a Residual Heat Removal (RHR) Pump.
In addition, the inspectors observed the licensee startup and maintenance personnel reassembling the RHR p'ump.
The inspectors verified that the operation was being conducted in.accordance with approved procedures under proper quality control surveillance.
No items of noncompliance or deviations were identified.
5.
Exit Interview The inspectors met with WPPSS representatives (denoted in paragraph 1)
at the conclus'ion of the inspection on June 25, 1981.
The scope and findings of the inspection were discussed as set forth in paragraphs
through ('
)
Ig i
th'c
.
(i t(
I'
,,k (
'l I K
'l Il I
ll't tt
'
/
n I
II
~
P II