ML17275B132
| ML17275B132 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/10/1981 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275B133 | List: |
| References | |
| NUDOCS 8107270122 | |
| Download: ML17275B132 (4) | |
See also: IR 05000397/1981013
Text
JUL 10 198)
Docket No. 50-397
IE'LE COPY
Washington Public Powe~ Supply System
P. 0.
Box 968
3000 George Washington
Way
Richland, Washington
99352
Attention:
Mr. R.
G. Matlock
Program Director, WNP-2
Gentlemen:
Subject:
NRC Inspection of WNP-2 (Preoperational
Test Phase)
ly
This refers to the inspection
conducted
by ftessrs.
J.
Carlson
and
D. Willett
of this office on June 22-25,
1981, of activities authorized
by
NRC Construction
Permit No.
CPPR-93,
and to the discussion of our findings held by the inspectors
with Mr. J. Martin and other members of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records, interviews with personnel,
and
observations
by the inspectors.
No items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790 of the Comission's
regulations,
a copy
of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information that
you (or your contractors)
believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone
within ten
(1D) days from the date of this letter of your intention to
file a request for withholding: and (b) submit within 25 days from the
date of this letter a written application to this office to withhold such
information. Ifyour receipt of this letter has
been delayed
such that
less than seven
(7) days are available for your review, please notify this
office promptly so that a new due date
may be established.
Consistent
with section 2.790(b)(l), any such application must be accompanied
by an
affidavit executed
by the owner of the information which identifies the
document or part sought to be withheld, and which contains
a full statement
of the basis
on which it is claimed that the information should be withheld
from public disclosure.
This section further requires the statement to
address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
10727012
8
2 810710
ADOCK 05000397
.NR<
oFncER
RY f lllhg
lit P
8U<<>>8)
CARLSON/dot WILLETT
s 7/lo/8i.---"7i';n-/8i
.
NBERG
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
7/0 /81
CREWS
7/< 0/81
0 F FIG IAL R EGO R D COPY
+ USGPO; 1980-329.824
r
~
~ r r
V
V
'
~
v r
v
h
I
r
Washington Public Power Supply System
-2-
E
,,JUL $ 0 198$
k
The info'rmation sought to:be withheld shall
be incorporated
as far as possible
inta a separate
part of the affidavit. If we do not hear-,from you in this
regard within the specified periods noted above, the report will be placed
in the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely
Enclosure:
IE Inspection
Report
Ho. 50-397/81-13
D. L. Crews, Chief
Reactor Operations
Prospect
Branch
cc w/o enclosure:
K. T. Perkins,
MPPSS
J.
D. Hartin,
NPPSS
'Sent" to Reproduction,
Hg, for distribution.
Distributed by RV:
RV
PDR'Resident Inspector
State of WA (Lewis)
RHE (w/o enclosure)
Y
r
Ef
EV
I EE
~ a
E
a
I E
a
<<E g
,EPEE
E
Ia
I'
'
E
'
I
1
fa
aE
I
EE
/
l
ra
Y
~
E
E
.E
E