Forwards IE Insp Rept 50-397/81-13 on 810622-25.No Noncompliance Noted
ML17275B132
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/10/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B133 List:
References
NUDOCS 8107270122
Download: ML17275B132 (4)


See also: IR 05000397/1981013

Text

JUL 10 198)

Docket No. 50-397

IE'LE COPY

Washington Public Powe~ Supply System

P. 0.

Box 968

3000 George Washington

Way

Richland, Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director, WNP-2

Gentlemen:

Subject:

NRC Inspection of WNP-2 (Preoperational

Test Phase)

ly

CP

This refers to the inspection

conducted

by ftessrs.

J.

Carlson

and

D. Willett

of this office on June 22-25,

1981, of activities authorized

by

NRC Construction

Permit No.

CPPR-93,

and to the discussion of our findings held by the inspectors

with Mr. J. Martin and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records, interviews with personnel,

and

observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790 of the Comission's

regulations,

a copy

of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this report contains

any information that

you (or your contractors)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone

within ten

(1D) days from the date of this letter of your intention to

file a request for withholding: and (b) submit within 25 days from the

date of this letter a written application to this office to withhold such

information. Ifyour receipt of this letter has

been delayed

such that

less than seven

(7) days are available for your review, please notify this

office promptly so that a new due date

may be established.

Consistent

with section 2.790(b)(l), any such application must be accompanied

by an

affidavit executed

by the owner of the information which identifies the

document or part sought to be withheld, and which contains

a full statement

of the basis

on which it is claimed that the information should be withheld

from public disclosure.

This section further requires the statement to

address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

10727012

8

2 810710

PDR

ADOCK 05000397

.NR<

PDR

oFncER

RY f lllhg

lit P

8U<<>>8)

CARLSON/dot WILLETT

s 7/lo/8i.---"7i';n-/8i

.

ST

NBERG

~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

7/0 /81

CREWS

7/< 0/81

0 F FIG IAL R EGO R D COPY

+ USGPO; 1980-329.824

r

~

~ r r

V

V

'

~

v r

v

h

I

r

Washington Public Power Supply System

-2-

E

,,JUL $ 0 198$

k

The info'rmation sought to:be withheld shall

be incorporated

as far as possible

inta a separate

part of the affidavit. If we do not hear-,from you in this

regard within the specified periods noted above, the report will be placed

in the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely

Enclosure:

IE Inspection

Report

Ho. 50-397/81-13

D. L. Crews, Chief

Reactor Operations

Prospect

Branch

cc w/o enclosure:

K. T. Perkins,

MPPSS

J.

D. Hartin,

NPPSS

'Sent" to Reproduction,

Hg, for distribution.

Distributed by RV:

RV

PDR'Resident Inspector

State of WA (Lewis)

RHE (w/o enclosure)

Y

r

Ef

EV

I EE

~ a

E

a

I E

a

<<E g

,EPEE

E

Ia

I'

'

E

'

I

1

fa

aE

I

EE

/

l

ra

Y

~

E

E

.E

E