Category:Enforcement Action
MONTHYEARIR 05000390/20220022022-08-12012 August 2022 Integrated Inspection Report 05000390/2022002 and 05000391/2022002 and Exercise of Enforcement Discretion ML20232B8032020-08-24024 August 2020 Notice of Violation and Proposed Imposition of Civil Penalty to TVA (EA-20-006 & EA-20-007) IR 05000390/20190902019-04-15015 April 2019 Final Significance Determination of a White Finding and Notice of Violation and Assessment Follow-Up Letter (NRC Inspection Report Nos. 05000390/2019090 and 05000391/2019090) Dated April 15, 2019 IR 05000390/20160032016-11-10010 November 2016 NRC Integrated Inspection Report 05000390/2016003, 05000391/2016003 and Notice of Violation and OI Report Number OI-2-2015-039 ML13169A0302013-06-18018 June 2013 EA-13-019, Watts Bar Unit 2, Notice of Violation and Proposed Imposition of Civil Penalty, NRC Inspection Report Number 05000391-13-614 IR 05000391/20136142013-06-18018 June 2013 EA-13-019, Watts Bar Unit 2, Notice of Violation and Proposed Imposition of Civil Penalty, NRC Inspection Report Number 05000391-13-614 IR 05000390/20136142013-06-18018 June 2013 EA-13-019, Watts Bar Unit 2, Notice Of Violation And Proposed Imposition Of Civil Penalty, NRC Inspection Report Number 05000391-13-614 ML12307A1042012-10-29029 October 2012 Tennessee Valley Authority - Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML1117805622011-06-27027 June 2011 Response to Disputed Notice of Violation (EA-11-144) ML0209101102002-03-29029 March 2002 EA-02-024 - Tennessee Valley Authority Exercise of Enforcement Discretion - NRC Special Inspection Report ML0036944822000-02-0707 February 2000 EA-99-234, Enclosure, ML003694482 2022-08-12
[Table view] Category:Inspection Report
MONTHYEARIR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23296A0242023-10-24024 October 2023 Biennial Problem Identification and Resolution Inspection Report and Preliminary Greater than Green Finding and Apparent Violation IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 IR 05000390/20234012023-03-13013 March 2023 Security Baseline Inspection Report 05000390 2023401 and 05000391 2023401 IR 05000390/20220062023-03-0101 March 2023 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022006 and 05000391/2022006 IR 05000390/20220042023-02-10010 February 2023 Integrated Inspection Report 05000390/2022004 and 05000391/2022004 IR 05000390/20224202022-12-0101 December 2022 Security Baseline Inspection 05000390/2022420 and 05000391/2022420 Cover Letter ML22318A0072022-11-14014 November 2022 Integrated Inspection Report 05000390/2022003 and 05000391/2022003 IR 05000390/20220102022-10-28028 October 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000390/2022010 and 05000391/2022010 IR 05000390/20223012022-09-30030 September 2022 NRC Operator License Examination Report 05000390/2022301 and 050000391/2022301 ML22256A2952022-09-14014 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07201048/2022001 IR 05000390/20220052022-08-31031 August 2022 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022005 and 05000391/2022005 - Final IR 05000390/20220022022-08-12012 August 2022 Integrated Inspection Report 05000390/2022002 and 05000391/2022002 and Exercise of Enforcement Discretion IR 05000390/20224012022-08-0303 August 2022 Security Baseline Inspection Report 05000390/2022401 and 05000391/2022401 IR 05000390/20220012022-05-11011 May 2022 Integrated Inspection Report 05000390/2022001 and 05000391/2022001 ML22123A2412022-05-11011 May 2022 Review of the Fall 2021 Mid-Cycle Steam Generator Tube Inspection Report IR 05000390/20210062022-03-0202 March 2022 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 (Report No. 05000390/2021006 and 05000391/2021006) IR 05000390/20210042022-02-10010 February 2022 Integrated Inspection Report 05000390/2021004 and 05000391/2021004 IR 05000390/20210032021-11-10010 November 2021 Integrated Inspection Report 05000390/2021003 and 05000391/2021003 IR 05000390/20214022021-11-0202 November 2021 Security Baseline Inspection Report 05000390/2021402 and 05000391/2021402 IR 05000390/20214032021-10-26026 October 2021 Material Control and Accounting Program Inspection Report 05000390/2021403 and 05000391/2021403 (OUO Removed) ML21263A0042021-09-24024 September 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000390/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000390/2021401 and 05000391/2021401 IR 05000390/20210052021-08-24024 August 2021 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 & 2 Report 05000390/2021005 and 05000391/2021005 IR 05000390/20210022021-08-0404 August 2021 Integrated Inspection Report 05000390/2021002 and 05000391/2021002 IR 05000390/20210122021-07-0101 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000390/2021012 and 05000391/2021012 IR 05000390/20210102021-05-0606 May 2021 NRC Inspection Report 05000390/2021010 and 05000391/2021010 IR 05000390/20210012021-05-0505 May 2021 Integrated Inspection Report 05000390/2021001 and 05000391/2021001 IR 05000390/20210112021-04-13013 April 2021 Triennial Fire Protection Inspection Report 05000390/2021011 and 05000391/2021011 IR 05000390/20200062021-03-0303 March 2021 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020006 and 05000391/2020006 IR 05000390/20200042021-02-11011 February 2021 Integrated Inspection Report 05000390/2020004, 05000391/2020004, 07201048/2020002, and Exercise of Enforcement Discretion IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 IR 05000390/20204032020-12-15015 December 2020 Security Baseline Inspection Report 05000390/2020403 and 05000391/2020403 IR 05000390/20204012020-11-30030 November 2020 Security Baseline Inspection Report 05000390/2020401 and 05000391/2020401 IR 05000390/20200032020-11-10010 November 2020 Integrated Inspection Report 05000390/2020003 and 05000391/2020003 IR 05000390/20200112020-10-20020 October 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000390/2020011 and 05000391/2020011 IR 05000390/20200052020-08-31031 August 2020 Assessment Followup Letter and Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020005 and 05000391/2020005 IR 05000390/20200022020-08-11011 August 2020 Nuclear Regulatory Commission Integrated Inspection Report 05000390/2020002, 05000391/2020002, and 07201048/2020001 IR 05000390/20200012020-05-0505 May 2020 Integrated Inspection Report 05000390/2020001 and 05000391/2020001 IR 05000390/20204102020-03-31031 March 2020 Security Baseline Inspection Report 05000390/2020410 and 05000391/2020410 IR 05000390/20190062020-03-0303 March 2020 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - NRC Report 05000390/2019006 and 05000391/2019006 2023-08-09
[Table view] Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:Notice of Violation
MONTHYEARML21200A1362021-07-23023 July 2021 Revised TVA Notice of Violation, Enclosure 1 (EA-19-092) ML21200A1382021-07-23023 July 2021 Revised TVA Notice of Violation, Enclosure 2 (EA-19-092) OI 2-2016-042, Mr. Sprinkle Notice of Violation (IA-20-018)2020-11-0606 November 2020 Mr. Sprinkle Notice of Violation (IA-20-018) IR 05000390/20190912019-11-19019 November 2019 Notice of Violation and Proposed Imposition of Civil Penalty - $145,000, NRC Inspection Report Nos. 05000390/2019091 and 05000391/2019091 IR 05000390/20190902019-04-15015 April 2019 Final Significance Determination of a White Finding and Notice of Violation and Assessment Follow-Up Letter (NRC Inspection Report Nos. 05000390/2019090 and 05000391/2019090) Dated April 15, 2019 IR 05000390/20160032016-11-10010 November 2016 NRC Integrated Inspection Report 05000390/2016003, 05000391/2016003 and Notice of Violation and OI Report Number OI-2-2015-039 IR 05000391/20156072015-09-29029 September 2015 IR 05000391/2015607 and Notice of Violation, July 1, 2015 August 15, 2015, Watts Bar Nuclear Plant, Unit 2 - Integrated Inspection ML15181A4462015-06-29029 June 2015 IR 05000391/2015604; 05/16/2015; Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Report and Notice of Violation IR 05000390/20156042015-06-29029 June 2015 IR 05000391/2015604; 05/16/2015; Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Report And Notice of Violation IR 05000390/20156142015-04-0707 April 2015 Notice Of Violation (NRC Inspection Report No. 05000391/2015-614, and Investigation Report No. 2-2013-011, Watts Bar Nuclear Plant) IR 05000391/20146162015-01-12012 January 2015 Inspection Report 05000391/2014616; Investigation Report No. 2-2013-011; and Apparent Violation IR 05000390/20130092013-06-0404 June 2013 Nuclear Plant, Final Significance Determination of Yellow Finding, White Finding and Notices of Violations; Assessment Follow-Up Letter; Inspection Report No. 05000390-13-009 ML12139A0522012-05-18018 May 2012 Response to Corrective Actions with TIA for Watts Bar Unit 2 Notice of Violation (NOV) 05000391-10-603-08 IR 05000391/20126122012-05-0909 May 2012 IR 05000391-12-612 and Notice of Violation, 03/12-28/2012, Watts Bar Nuclear Plant, Unit 2 Construction - NRC Problem Identification and Resolution ML1021704652010-08-0505 August 2010 IR 05000391-10-603; 04/01/2010 - 06/30/2010; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection Report ML0610006432006-04-0707 April 2006 EA 05-169 - Watts Bar White Finding and Notice of Violation IR 05000390/20050082005-04-11011 April 2005 IR 05000390-05-008, for Watts Bar, Unit 1, Final Significance Determination for a White Finding and Notice of Violation 2021-07-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ril 15, 2019
SUBJECT:
WATTS BAR NUCLEAR PLANT - FINAL SIGNIFICANCE DETERMINATION OF A WHITE FINDING AND NOTICE OF VIOLATION AND ASSESSMENT FOLLOW-UP LETTER (NRC INSPECTION REPORT NOS. 05000390/2019090 AND 05000391/2019090)
Dear Mr. Shea:
This letter provides you the final significance determination of the Apparent Violation initially documented in the U.S. NRC Integrated Report (IR) 05000390, 391/2018004-05 dated February 5, 2019 and subsequent preliminary White finding discussed in our previous communication IR 05000390, 391/2019501 dated February 21, 2019. The finding involved a failure to maintain the effectiveness of an emergency plan when the licensee failed to recognize the risk associated with calculations affecting emergency preparedness. Tennessee Valley Authority (TVA) Watts Bars emergency classification scheme for Radiological Effluent emergency action levels (EALs) RG1 (General Emergency), RS1 (Site Area Emergency), RA1 (Alert), and RU1 (Unusual Event), which included radiation monitor threshold values, were calibrated too high (non-conservative). Radiation monitors, calibrated with the non-conservative EAL threshold values, were being relied upon to continuously assess the impact of the release of radioactive materials, provide criteria for determining the need for notification and participation of local and State agencies, and provide technically accurate dose assessments.
The calculation errors adversely impacted the EAL threshold values and dose assessment capabilities. However, the errors did not have actual safety consequences because the errors did not result in an actual untimely emergency declaration.
By letter dated March 21, 2019, you provided a response to the NRC staff preliminary determination regarding the finding. Your response indicated TVA does not dispute that the violation occurred or the preliminary significance determination as a White finding with a cross-cutting aspect of Human Performance, Change Management [H.3].
After considering the information developed during the inspection the NRC has concluded that the finding is appropriately characterized as White. According to NRC Inspection Manual Chapter (IMC) 0609, appeal rights only apply to those licensees that have either attended a regulatory conference or submitted a written response to the preliminary determination letter.
You have 30 calendar days from the date of this letter to appeal the staffs determination of significance for the identified White finding. Such appeals will be considered to have merit only if they meet the criteria given in the IMC 0609, Attachment 2. An appeal must be sent in writing to the Regional Administrator, Region II, 245 Peachtree Center Avenue N.E., Suite 1200, Atlanta, GA, 30303-1257.
The NRC has determined that your failure to maintain the effectiveness of an emergency plan to meet the requirements of 10 CFR Part 50.47(b)(4), (b)(9), and Part 50 Appendix E, is a violation, as cited in the attached Notice of Violation (Notice). The circumstances surrounding the violation were described in detail in the subject inspection report. In accordance with the NRC Enforcement Policy, the Notice is considered escalated enforcement action because it is associated with a White finding.
The violation associated with this White finding is being cited in accordance with the NRC Enforcement Policy, which can be found at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html The NRC has determined that the reason for the violation, corrective actions taken and planned to address recurrence, and the date when full compliance was achieved for this violation is adequately addressed and captured on the docket in your written response dated March 21, 2019. Therefore, you are not required to respond to this letter unless the record does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.
For administrative purposes, this letter is issued as a separate NRC Inspection Report Nos.
05000390/2019090 and 05000391/2019090. Accordingly, apparent violation (AV)
05000390/2019501 and 05000391/2019501 and AV 05000390/2018004-05 and 05000391/2018004-05 are updated consistent with the regulatory positions described in this letter. Therefore, AV 05000390/2018-004-05 and 05000391/2018-004-05, Failure to Maintain the Effectiveness of the Emergency Plan and a Standard Emergency Classification Scheme Which Included Facility Effluent Parameters is updated as VIO 05000390/2018-004-05 and 05000391/2018-004-05 in the Emergency Preparedness Cornerstone with a safety significance of White with a crosscutting aspect of H.3.
The NRC has determined the performance at Watts Bar Units 1 and 2 would be in the Regulatory Response Column of the ROP Action Matrix beginning 4th quarter of 2018.
Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, when you have notified us of your readiness. This IP is conducted to provide assurance that the root and contributing causes for the performance issues are understood; to provide assurance that the extent of condition and extent of cause of the performance issues are understood; and to provide assurance that the corrective actions are sufficient to address the root and contributing causes and prevent recurrence. This inspection will be scheduled after you notify the NRC of your readiness. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2019. This letter, and its enclosure, will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Laura A. Dudes Acting Regional Administrator Docket Nos.: 50-390 and 50-391 License Nos.: NPF-90 and NPF-96 Enclosure:
Notice of Violation cc: Distribution via Listserv
ML19105B198 _ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/OL2 RII/DRS/OL2 RII/DRS/OL2 RII/ DRP / PB5 RII/ ORA RII/ EICS SIGNATURE CAF2 SPS GXG ORL SAP1 MXK7 NAME C. FONTANA S. SANCHEZ E. GUTHRIE O. López-Santiago S. PRICE M. KOWAL DATE 3/ 28 /2019 3/ 29 /2019 4/ 2 /2019 3/ 29 /2019 4/ 2 /2019 3/ 27 /2019 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO OFFICE RII/ DRS OE RII/ORA SIGNATURE ATG DAJ2 LAD NAME A. GODY D. JONES L. Dudes DATE 4/ 2 /2019 4/ 10 /2019 4/ 15 /2019 E-MAIL COPY? YES NO YES NO YES NO
Notice of Violation Tennessee Valley Authority Docket Nos.: 50-390 and 50-391 Watts Bar Nuclear Plant License Nos.: NPF-90 and NPF-96 EA-18-182 Watts Bar Nuclear Plant identified a violation of NRC requirements during a design change impact review. In accordance with the NRC Enforcement Policy, the violation is listed below.
10 CFR Part 50.54(q)(2) requires that a holder of a nuclear power reactor operating license under this part, shall follow and maintain the effectiveness of an emergency plan that meets the planning standards in 10 CFR Part 50.47(b) and the requirements in Appendix E to this part.
10 CFR Part 50.47(b)(4) requires a standard emergency classification and action level scheme, the bases of which include facility and system effluent parameters, is in use by the nuclear facility licensee, and State and local response plans call for reliance on information provided by facility licensees for determinations of minimum initial offsite response measures.
10 CFR Part 50.47(b)(9) requires adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use.
10 CFR Part 50, Appendix E, Section IV.B., Assessment Actions, requires that means to be used for determining the magnitude of, and for continuously assessing the impact of, the release of radioactive materials shall be described, including emergency action levels (EALs)
that are to be used as criteria for determining the need for notification and participation of local and State agencies, the Commission, and other federal agencies. The EALs shall be based on in-plant conditions and instrumentation, in addition to onsite and offsite monitoring.
Contrary to the above, from each units initial plant startup until September 17, 2018, the licensee failed to maintain the effectiveness of their emergency plan and a standard emergency classification scheme which included facility effluent parameters. Specifically, calculation errors for the Main Steam Line Condenser Vacuum Exhaust monitor dose conversion factors resulted in significantly non-conservative effluent EAL threshold values for EALs RG1, RS1, RA1, and RU1 and degraded the licensees ability to perform dose assessment. These radiation monitors were being relied upon to continuously assess the impact of the release of radioactive materials, provide criteria for determining the need for notification and participation of local and State agencies, and provide for technically accurate dose assessments.
This violation is associated with a White SDP finding.
The NRC has determined that the reason, corrective actions taken and planned to address recurrence, and the date when full compliance was achieved for this violation is adequately addressed and captured on the docket in your written response dated March 21, 2019 (ML19080A178). However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a "Reply to a Notice of Violation, EA-18-182". Send your response to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the Regional Administrator, Region II, and a copy to the NRC resident inspector at the Enclosure facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements of your response.
If you contest this enforcement action, you should also provide a copy of your response, with the basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
If you choose to respond, your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Therefore, to the extent possible, the response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Dated this 15th day of April 2019