MONTHYEARML19269E9911978-06-13013 June 1978 SER Re Operation of Facility Project stage: Request ML20148A6741978-12-22022 December 1978 Requests That Gap Remit Req Class 3 Fee of $4,000 for Review of 781201 Appl for Amend to Facil Oper Lic NPF-5 Re Tech Spec Changes to Establish & Rept Differential Settlement Valves for Class 1 Struc Listed on Table 3.7.8-1 of Specs Project stage: Approval ML19283B6811979-02-0909 February 1979 Requests $4,000 Class III Fee within 15 Days to Amend License NPF-5 Project stage: Other ML19261B6361979-02-21021 February 1979 Justifies Exemption from License Amend Fee for Tech Spec Change.Addresses Several Points in Footnote 2 to Table of Amend Fees Schedule.Reserves Right to Request Refund of $4,000 Fee Project stage: Other ML19282C6671979-03-16016 March 1979 Denies 790221 Request for Exemption of 781201 Amend Application from Fee Payments.Option of Amending License Rather than Delaying Issuance Was for Utils Convenience Project stage: Other ML20150F0791979-03-30030 March 1979 Requests Addl Info Re Tech Spec Changes for Settlement of Class I Structures,As Proposed in .Forwards Staff Position,Which Differs from That of Util.Requests Revision within 30 Days Project stage: Other IR 05000366/19790131979-03-30030 March 1979 IE Insp Rept 50-366/79-13 on 790314-16.No Noncompliance Noted.Major Areas Inspected:Concrete Expansion Anchor Installation Project stage: Request ML19207B4861979-07-20020 July 1979 Request Supplemental Info to Review 781201 Submittal Re Proposed Tech Spec Changes for Settlement Measurement & Penetration Differential Settlements of Class I Structures Project stage: Other ML19253A3471979-08-14014 August 1979 Responds to NRC .Forwards Addl Info Re Differential Bldg Settlement Project stage: Other ML19208A9251979-08-22022 August 1979 Notification of 790830 Meeting W/Util in Bethesda,Md to Discuss NRC Questions Re Settlement of Structures Project stage: Meeting ML19254B4421979-08-31031 August 1979 Summary of 790830 Meeting W/Util in Bethesda,Md Re Settlement of Structures & Clarification of NRC 790720 Request for Addl Info Project stage: RAI ML19209C4521979-10-0808 October 1979 Forwards Addl Info Re Proposed Tech Specs for Settlement of Category 1 Structures,In Response to 790720 Request Project stage: Other ML19256F5301979-11-27027 November 1979 Forwards Request for Addl Info to Complete Review of 781201, 790814 & 0908 Requests for Proposed Tech Specs Changes Re Settlement of Class I Structures Project stage: RAI ML20065K0911982-09-27027 September 1982 Application to Amend License NPF-5,deleting App a Tech Specs on Bldg Settlement & Withdrawing 781201,790814 & 1008 Submittals Re Differential & Total Settlement Values Based on Consolidation Settlement Project stage: Request ML20065K1021982-09-27027 September 1982 Tech Specs 3/4.7.7 Re Penetration Fire Barriers Project stage: Other ML20065J9061982-10-0101 October 1982 Forwards Remittance & Copies Omitted from Re Bldg Settlement Project stage: Other ML20083D7031983-12-0707 December 1983 Discusses Total Bldg Settlement of Control Bldg,Intake Structure & Unit 1 Reactor Bldg.Monitoring Process Will Be Continued Through Procedural Controls Rather than Tech Spec Limitations Project stage: Other ML20084J7001984-05-0404 May 1984 Advises of Inaccuracies Presented in 831207 Submittal Delineating Percentages of Total Allowable Bldg Settlement for Seismic Category 1 Structures.Changes Will Be Submitted Upon Completion of Engineering Analysis by 840525 Project stage: Other ML20138N7791985-12-18018 December 1985 Submits Info Re Total Settlement of Control Bldg,Intake Structure & Unit 1 Reactor Bldg,Replacing 831207 Submittal as Supplemented by .Tech Spec Settlement Values More Restrictive than FSAR Project stage: Supplement ML20155E9681986-04-0404 April 1986 Discusses 820927 Request for Elimination of Ref to Total & Differential Bldg Settlement from Tech Specs.Discussions W/ Project Manager & NRR Reviewer Established Acceptable Basis for Deletion of Tech Spec as Listed Project stage: Request ML20212J2381986-05-31031 May 1986 Rept on Settlement of Major Plant Structures Project stage: Other ML20207L4581986-11-30030 November 1986 Revised Rept on Settlement of Major Plant Structures Project stage: Other ML20207L4301987-01-0505 January 1987 Forwards Revised Rept on Settlement of Major Plant Structures, Clarifying Areas Discussed During 861021 Meeting Re Deletion of Refs to Bldg Settlement from Tech Specs Project stage: Meeting ML20207F9451987-01-0505 January 1987 Notifies of 870107 Meeting W/Util in Bethesda,Md to Discuss Util Schedules & Progress Re Equipment Qualification,Fire Protection,Spds Tech Spec Improvement,App J & Snubbers Project stage: Request ML20212J1441987-01-21021 January 1987 Summary of 861021 Meeting W/Util in Bethesda,Md Re Util Request to Delete Bldg Settlement Monitoring Requirements from Tech Specs.Bechtel May 1986 Rept, Rept on Settlement of Major Plant Structures, Presented at Meeting,Encl Project stage: Meeting ML20237G8331987-08-31031 August 1987 Safety Evaluation Supporting Amend 84 to License NPF-5 Project stage: Approval ML20237G8231987-08-31031 August 1987 Amend 84 to License NPF-5,revising Tech Specs to Delete Section 3.7.8 Re Settlement of Class I Structures Project stage: Other 1979-08-31
[Table View] |
Similar Documents at Hatch |
|---|
|
Inspection Report - Hatch - 1979013 |
|---|
|
|
Text
{{#Wiki_filter:.
.
.
UNITED STATES pa atGog NUCLEAR REGULATORY COMMISSION e,#
o
e
R EGION 11
-
) 99 g
101 M ARIETT A ST R E ET, N.W.
^
-c o,
,8 ATLANTA. GEORGI A 30303
%,.....,/
Report No. 50-366/79-13 l
Licensee: Georgia Power Company 270 Peacht ree St reet, N.W.
Atlanta, Georgia 30303 Facility Name Hatch Nuclear Plant - Unit 2 Docket No. 50-366 License No. NPF-5 Inspection at Hatch Site near Eaxley, Georgia Inspector:
' _. ;_[[,,
7?'.
f u)
.t c.
,
Date Signed L. Modenos k.c l')
>
Approved by:
,_f;
__J. C. B rya nt, S[c t ion Clh<3
.,m
_
Date Signed ef, RC&ES Branch S& DIARY Inspect ion on Feb rua ry le-16,1979 Areas Inspected This special unannounced inspection involved 16 inspector-hours onsite in the area of concrete expansien anchor installat ion.
Results No apparent items of noncompliance or deviat ions were identified.
790605011-(
,
,
.
.
o
.
DETAILS 1.
Persons Contacted Licensee Emplovees
!
I
'
- M. Manry, Plant Manager kC. R. Miles, QA Field Supervisor
- C.
E. Belflower, QA Site Supervisor
F. Barrett, QA Field Representative
- D. McCusker, QC, Power Generation Other licensee employees contacted during this inspection included con-struction craftsmen, QC inspectors and QA personnel.
Other Organizations
- M. Desai, Mechanical Supervisor, Bechtel S. Ward, Stress Analysis Group Leader, Bechtel NRC Resident Inspector
- R. F. Rogers
- Attended exit interview.
2.
Exit Interview The inspection scope and findings were summarized on March 16, 1979 with those persons indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings (Open) Unresolved Item No. 366/79-08-04: Adequacy of Installed Concrete Expansion Anchors.
The inspector observed testing on self drilling (S.D.) and wedge type anchors for the following supports:
Support Type Test 2T48-H-85 S.D.
Torque 2E21-CS-A32 Vedge Torque 2 Ell-RHR-R225 Wedge Visual The inspector witnessed the rework done (replacement with wedge type anchors on SD anchors)that failed in the following supports:
,
.
.
-2-2P41-DSW-ll31 2P41-DSW-H27
'
2P41-DSW-lil5 j
,
2E41-HPCI-H13 The following reworked supports were checked for proper installation and corresponding Maintanence Reports (MR) were examined for proper identifi-cation and approval by Bechtel's Engineering staf f:
2P41-DSW-ill 3 2 Ell-RSW-R14 2P41-DSW-R16 2P41-DSW-R28 2P41-DWW-H9 2E41 -IIPC I-ll28 2P41-DSW-H5 Procedure No. HNP-6942, Rev. O, " Installation and Inspection of Concrete Anchors Used on Class I & 11 Seismic Class Systems" was reviewed regarding the rework installation of wedge anchors. No items of noncompliance were identified. This item remains open pending completion of testing, rework and submittal of the final report.
4.
Unresolved Items Unresolved items were not identified during this inspection.
}}