Hatch Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 12:44:58 Report 22
EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 03/07/2006 03/09/2006 1, 2 7111105T IP Fire Protection [Triennial]
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 04/03/2006 04/07/2006 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 04/17/2006 04/21/2006 1, 2 7111105T IP Fire Protection [Triennial]
PSB1-RP
- RP PUBLIC PREINSPECTION VISIT/ ISFSI Baseline Inspections 05/15/2006 05/19/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/22/2006 05/26/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/12/2006 06/16/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/26/2006 06/30/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/10/2006 07/14/2006 1, 2 7111121 IP Component Design Bases Inspection
PS2-EP
- EP INSP Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/19/2006 06/23/2006 1, 2 71151 IP Performance Indicator Verification
ISFSI-O
- 60855.1 - OPERATION OF AN ISFSI Other Routine 07/03/2006 07/07/2006
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
PSB1-RP
- RP PUBLIC BASELINE INSP Baseline Inspections 07/17/2006 07/21/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/17/2006 07/21/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/17/2006 07/21/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/17/2006 07/21/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/17/2006 07/21/2006 1, 2 71151 IP Performance Indicator Verification
- REQUAL INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1, 2 7111111B IP Licensed Operator Requalification Program
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT/ ISFSI Baseline Inspections 01/15/2007 01/17/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111117B IP Permanent Plant Modifications
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP-WEEK1 Baseline Inspections 02/12/2007 02/16/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
Enclosure
Hatch Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 12:44:58 Report 22
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP-WEEK1 Baseline Inspections 02/12/2007 02/16/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/12/2007 02/16/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/12/2007 02/16/2007 1, 2 71151 IP Performance Indicator Verification
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 02/19/2007 02/23/2007
7111108G IP Inservice Inspection Activities - BWR
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP-WEEK 2 Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/26/2007 03/02/2007 1, 2 71151 IP Performance Indicator Verification
PB2-PI&R
- BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 07/30/2007 08/03/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 08/13/2007 08/17/2007 1, 2 71152B IP Identification and Resolution of Problems
PS2-EP
- EP EXERCISE Baseline Inspections 08/20/2007 08/24/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/20/2007 08/24/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.