Forwards IE Insp Rept 50-366/79-13 on 790314-0316.No Noncompliance Noted
ML19270G189
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19270G185 List:
References
NUDOCS 7906050113
Download: ML19270G189 (2)


See also: IR 05000366/1979013

Text

{{#Wiki_filter:- . -> UNITED STATES

(g8 "f oug

. o NUCLEAR REGULATORY COMMISSION . , , . REGION ll y ) g 101 M ARIETTA STREET. N.W. r

' 8 ATLANT A, GEORGI A 30303 o \\ [[[,, +' APR 0 21979 In Reply Refer To: LM ! RIj:66/79-13 ' 50-3 Georgia Power Company ATTN: J. H. Miller, Jr. Executive Vice President 270 Peachtree Street Atlanta, GA 30303 Lentlemen: This refers to the inspection conducted by L. Modenos of this office on March 14-16, 1979, of activities authorized by NRC License No. NPF-5 for the Hatch Nuclear Plant facility, and to the discussion of our findings held with M. Manry at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, inte rvi ews with personnel, and observations by the inspector. Within the scope of this inspection, no items of noncompliance were disclosed. We have examined actions you have taken with regard to previously reported unresolved items. The status of these items is discussed in the enclosed report. In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC*s Public Document Room. If this report contains any information that you (or your centractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. 7 9 0 6 0 5 O llE;

. . , APR 0 c 1979 ' Georgia Power Company -2- Should you have any questions concerning this letter, we will be glad to discuss them with you. . ' l Sincerely, b 'h zN C. E. Murp y, Chi Reactor Construc ion and Engineering Support Branch Enclosure: Inspection Report No. 50-366/79-13 cc w/ encl: M. Manry, Plant Manager P. O. Box 442 Baxley, GA 31513 C. E. Be1 flower Site QA Supervisor P O. Box 442 Baxley, GA 31513 }}