| ML19344D063 | List: |
| References | |
| NUDOCS 8003110163 | |
| Download: ML19344D062 (2) | |
Text
m
.
-. - -
\\
[l0
'
[
o UNITED STATES
!
I NUCLEAR REGULATORY COMMISSION o
'
$ *-
.E REGION 11
'[
101 MARIETTA ST N.W., sulTE 3100 o
j
- g ATLANTA, G EORGIA 30303 i
JAN 2 91990 In Reply Refer To:
RII:CJ 50-3d/80-1 Alabama Power Company ATTN:
F. L. Clayton, Jr.
Senior Vice President P. O. Box 2641 Birmingham, AL 35291 Gentlemen:
This refers to the inspection conducted by C. Julian of this office on Januarv 8 through January 11, 1980 of activities authorized by NRC Construction Permit do.
CPPR-86 for the Farley facility, and to the discussion of our findings held with
'.L G. Hairston at the conclusion of the inspection.
>
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observativas by the inspectors.
.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.793 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor-mation identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
'
',
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, c W/h R. C. Lewis, Acting Chief Reactor Operations and Nuclear Support Branch Enclosure:
See Page 2 8003.11016 3
-..
"
.
Alabama-Power Company-2-
-._
Enclosure:
Inspection' Report No. 50-364/80-1 cc w/ encl:
A. R. Barton Executive Vice President P. O. Box 2641 Birmingham, AL 35291 H. O. Thrash Manager-Nuclear Generation Post Office Box'2641 Birmingham, Alabama 35291-C. Biddinger, Jr.
Manager-Corporate Quality Assu ance Post Office Box 2641 Birmingham, Alabama 35291
,
W. G. Hairston III Plant Manager Drawer 470
,
Ashford, Alabama 36312 R. E. Hollands, Jr.