I f

f, NUCLEAR REGULATORY COMMISSION I

$

.E REGION ll

'#

o 101 MARIETTA ST., N.W., SulTE 3100 g*

ATLANTA, GEORGIA 30303

JUN 2 01980 Report No. 50-364/80-05 Docket No. 50-364 License No. CPPR-36 Safeguards Group IV Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35202 Facility Name: Farley, Unit No. 2 Inspection at Dothan, Alabama Inspection Conducted: June 4-6, 1980 Date of Last Material Control and Accounting Inspection Visit:

12/19-21/79 Type of, Inspection: Unannounced Material Control and Accounting Inspecto b'.[,W Ji d i

/I/J

/

.

~

C J

Safe Date Signed

'/

,/,guardsAuditor

)

/

/

,

ApproYed b

' /e 4^~$.

, as h/W/ ?T F /V'. Gillespie, Secti6 3 Chief, Safeguards Branch Ipte pigned j

Inspection Summary Areas Inspected: Material Control and Accounting.

The inspection involved 13 inspector-hours onsite by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the one area examined during the inspection.

8007290393

.

y-

.

f JUN 2 01980 DETAILS 1.

Key Persons Contacted

  • W. G. Hairston, Plant Superintendent
  • R. H. Marlow, Reactor Engineering Supervisor
  • S. McDaniel, Reactor Engineering
  • Denotes those present at the exit interview 2.

Licensee Action on Previous Inspection Findings There were no items of noncompliance on the previous inspection.

3.

Exit Interview The inspection scope and findings were summarized on June 6,1980 with those persons indicated in Paragraph 1 above.

4.

Unresolved Items There were no unresolved items from the previous MC&A inspection.

5.

MC85102B - Material Control and Accounting No items of noncompliance noted.

The inspection results were attained through:

-

a.

An audit and examination of Unit No. 2 SNM accountability records including Nuclear Material Transaction Reports (Form NRC-741) for the receipt of the initial fuel assemblies for Unit No. 2.

b.

A review of Fuel Assembly transfer procedures for appropriate authori-zations aad documentation.

A review of Fuel Assembly History Cards for accuracy in reflecting the c.

current location of fuel assemblies.

.

In addition, a physical inventory of the 157 Unit No. 2 fuel assemblies stored in the Unit 2 spent fuel basin was taken and serial numbers and storage locations verified.

A material balance statement for Unit No. 2, enriched uranium, as of June 6, 1980, is included as Exhibit A.

_. _ _ _ _.

.

EXHIBIT A t./.j ALABAMA POWER COMPANY FARLEY UNIT 2 - MATERIAL BALANCE STATEMENT ENRICHED URANIUM AS OF JUNE 6, 1980 No. Fuel Grams Assemblies Total U U-235 Beginning Inventory

0

Receipts Westinghouse Electric Company 157 72,198,567*

1,844,923*

Shipments

0

Balance, June 6, 1980 157 72,198,567 1,844,933

  • Provisional values l

)

w_ -

i