ML19312E018
| ML19312E018 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/24/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19312E016 | List: |
| References | |
| NUDOCS 8006030068 | |
| Download: ML19312E018 (2) | |
See also: IR 05000364/1980008
Text
~
.
..
.
.-
<
,
8
p ra
8'
g
UNITED STATES
<,-
NUCLEAR REGULATORY COMMISSION
o
.I
e
REGION 11
101 MARIETTA ST., N.W.. SUITE 3100
ATLANTA, GEORGIA 30303
.....g
In Rep?v Refer To:
APR 2 41980
RII:WPA
50-364/80-8
.
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on April 9
turough 11, 1980 of activities authorized by NRC Construction Permit No. CPPR-86
for the Farley Nuclear Plant facility, and to the discussion of our findir.gs
held with J. A. Mooney at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selectivs examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
-
withhold such information from public aisclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary irror-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.. ,
-
v
C. E. Murph ,# Chief
Reactor Construction and Engineering
,
Support Branch
Enclosure:
See Page 2
-
i
8006030
8dV
t
'
n=-
g
-e
.
.%-.
+-
or
eim'%-
h W+ a e m . * u=
..
-',.
.
APR 241980
'
(
Alabama Power Company
~
-2-
Enclosure:
Inspection Report No. 50-364/80-8
cc w/ encl:
A. R. Barton
.
'
Executive Vice President
P. O. Box 2641
,
Birmingitam, AL 35291
H. O. Thrash
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, AL 35291
F. L. Clayton, Jr.
Senior Vice President
-
l
Post Office Box 2641
Birmingham, AL 35291
W. C. Petty
i
Manager-Quality Assurance (Design and Construction)
Post Office Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
,
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312
0. D. Kingsley, Jr.
Manager, Nuclear Engineering and
Technical Services
P. O. Box 2641
Birmingham, AL 35291
.
.o
y
,n w
'
.*
.
1
4
.
. __
.
. . . -