Forwards IE Insp Rept 50-364/80-08 on 800409-11.No Noncompliance Noted
ML19312E018
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/24/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19312E016 List:
References
NUDOCS 8006030068
Download: ML19312E018 (2)


See also: IR 05000364/1980008

Text

~

.

..

.

.-

<

,

8

p ra

8'

g

UNITED STATES

<,-

NUCLEAR REGULATORY COMMISSION

o

.I

e

REGION 11

101 MARIETTA ST., N.W.. SUITE 3100

ATLANTA, GEORGIA 30303

.....g

In Rep?v Refer To:

APR 2 41980

RII:WPA

50-364/80-8

.

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on April 9

turough 11, 1980 of activities authorized by NRC Construction Permit No. CPPR-86

for the Farley Nuclear Plant facility, and to the discussion of our findir.gs

held with J. A. Mooney at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selectivs examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

-

withhold such information from public aisclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary irror-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.. ,

-

v

C. E. Murph ,# Chief

Reactor Construction and Engineering

,

Support Branch

Enclosure:

See Page 2

-

i

8006030

8dV

t

'

n=-

g

-e

.

.%-.

+-

or

eim'%-

h W+ a e m . * u=

..

-',.

.

APR 241980

'

(

Alabama Power Company

~

-2-

Enclosure:

Inspection Report No. 50-364/80-8

cc w/ encl:

A. R. Barton

.

'

Executive Vice President

P. O. Box 2641

,

Birmingitam, AL 35291

H. O. Thrash

Manager-Nuclear Generation

Post Office Box 2641

Birmingham, AL 35291

F. L. Clayton, Jr.

Senior Vice President

-

l

Post Office Box 2641

Birmingham, AL 35291

W. C. Petty

i

Manager-Quality Assurance (Design and Construction)

Post Office Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

,

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312

0. D. Kingsley, Jr.

Manager, Nuclear Engineering and

Technical Services

P. O. Box 2641

Birmingham, AL 35291

.

.o

y

,n w

'

.*

.

1

4

.

. __

.

. . . -