ML19330A770
| ML19330A770 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/20/1980 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19330A771 | List: |
| References | |
| NUDOCS 8007290385 | |
| Download: ML19330A770 (2) | |
See also: IR 05000364/1980005
Text
,_
_
_ _ _ _ _ _ _ _
_
l
/
'o
UNITED STATES
/b
,
8
~g
NUCLEAR REGULATORY COMMISSION
n
g
ae
REGION ll
d '_8d Y
.
o,
'[
101 MARIETTA ST
N.W., SUITE 3100
'
%
j'
ATLANTA, GEORGIA 303o3
In Reply Refer To:
JHN 2 01980
RII:JWH
50-364/80-5
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by J. W. Hodges of this office on June 4
through 6, 1980, of activities authorized by NRC Construction Permit No. CPPR-86
at Farley and to the discussions of our findings held with W. G. Hairston at the
conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material
control and accountability under the applicable provisions of Title 10, Code of
Federal Regulations, Part 70, "Special Nuclear Material", and specific license
conditions. Within these areas, the inspection consisted of selective examina-
tions of procedures and representative records, interviews with personnel,
performance tests, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in NRC's Public Document Room. If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this
office to withhold such information from public disclosure. Any such applica-
,
tion must includc a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so that
-
proprietary information identified in the application is contained in a separate
part of the document.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sin erely
/
&
. B.
e
aa, Chief
'
Safeguards Branch
Enclosure:
See Page 2
[
80072903 5 --
--
JUN 2 01980
4
-
3
f
Alabama Power Company
-2-
p
Enclosure:
1
Inspection Report No. 50-364/80-5
)
(Not Exempt)
cc w/ encl:
A. R. Barton, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-0 Tity Assurance
(Design and Construcci,a)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
O. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
.
W
l
l
.,
.
,
_
_ , _
- --