Forwards IE Insp Rept 50-364/80-05 on 800604-06.No Noncompliance Noted
ML19330A770
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/20/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19330A771 List:
References
NUDOCS 8007290385
Download: ML19330A770 (2)


See also: IR 05000364/1980005

Text

,_

_

_ _ _ _ _ _ _ _

_

l

/

'o

UNITED STATES

/b

,

8

~g

NUCLEAR REGULATORY COMMISSION

n

g

ae

REGION ll

d '_8d Y

.

o,

'[

101 MARIETTA ST

N.W., SUITE 3100

'

%

j'

ATLANTA, GEORGIA 303o3

In Reply Refer To:

JHN 2 01980

RII:JWH

50-364/80-5

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by J. W. Hodges of this office on June 4

through 6, 1980, of activities authorized by NRC Construction Permit No. CPPR-86

at Farley and to the discussions of our findings held with W. G. Hairston at the

conclusion of the inspection.

Areas examined during this inspection included your program for nuclear material

control and accountability under the applicable provisions of Title 10, Code of

Federal Regulations, Part 70, "Special Nuclear Material", and specific license

conditions. Within these areas, the inspection consisted of selective examina-

tions of procedures and representative records, interviews with personnel,

performance tests, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in NRC's Public Document Room. If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure. Any such applica-

,

tion must includc a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so that

-

proprietary information identified in the application is contained in a separate

part of the document.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sin erely

/

&

. B.

e

aa, Chief

'

Safeguards Branch

Enclosure:

See Page 2

[

80072903 5 --

--

JUN 2 01980

4

-

3

f

Alabama Power Company

-2-

p

Enclosure:

1

Inspection Report No. 50-364/80-5

)

(Not Exempt)

cc w/ encl:

A. R. Barton, Executive Vice President

H. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr., Senior Vice President

W. C. Petty, Manager-0 Tity Assurance

(Design and Construcci,a)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr., QA Supervisor

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

.