U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION ANO ENFORCEMENT Region I Report No.
50-334/81-11 Docket No.30-334 Category C
License No. OPR-66 Priority
--
Licensee:
Ououesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077
,
.
Facility Name'.
Beaver Valley Power Station, Unit No.1 Inspection at:
Shippingport, Pennsylvania i
Inspection conducted:
ril 13-16,1981 Q \\
q3
.
5 /; } ///
n e Inspectors: wwu ~c date signed Peter S. Koltay, Reactor Inspector date signea cate signed Approved by:
7[cf/
-
Stewart D. Ebneter, Chief, Plant Systems Section Inspection Summary:
Insoection on Aoril 13-16,1981 (Report No. 50-334/81-11)
,
l Areas Inspected:
Routine unannounced inspection of modification to the Fire / Pro-
!
tection/ Prevention Program cutlined in the Safety Evaluation Pecort issued with
'
Amendment No.18 t'. Facility Operating License No. OPR-66.
The modifications in-
,
clude the installation of: water and gaseous suppression systems, fire detection devices, fire doors, electrical penetrations, fire hose stations, modifications to the diesel generator rooms, and miscellaneous fire protection equipment.
The inspection also included a review of fire protection equipment surveillance and maintenance records and the status of previously identified outstanding i: ems.
Tne inspection involved 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> on site by one NRC regionally-based inspector.
Resul ts : Of the 4 areas inspected, no items of noncompliance were identified in 3 areas, one item of noncompliance was identified in one area. (Violat; ion-failure to follow plant maintenance procedure.)
Region I Fom 12 (Rev. April 77)
gd b
,
.
.
DETAILS
1.
Persons Contacted Duguesne Light Comoany
"R.
Balcerek, Nuclear. Engineering and Refueling Supervisor J.
briffin, Senior Test Engineer
"R.
Har.sen, Maintenance Supervisor D.
Hunkiele, Senior QA Engineer F.
Lipchick, Senior Compliance Engineer
- J.
Maracek, Senior Engineer
"S.
Sovick, Compliance Engineer
. illiams, Chief Engineer
- H.
W P.
Verma, Test Engineer Chemtrol Corporation R.
Adrian, Quality Assurance T.
Lorent, Manager
" Denotes those personnel who were present at the exit interview.
2.
Action on Previous Insoection. Findings (Closed) Unresolved Item (334/80-03-03);
Instrument utilized for testing smoke detectors requires periodic calibration, in accordance with Procedure OST 1.33.6.
Proof of instrument calibration was not available at the site.
The inspector reviewed procedure OST 1.33.16, Smoke Detection Test, and verified that calibration data on the Honeywell TC100 A instrument is attached-to the procedure.
Date of last calibration is January 16, 1981. The instrument is calibrated prior to each detection system test.
3.
Fire Protection Modifications Recuired by Amendment No. 18 to Facility Goerating License No. OPR-66
.
By review and examination of records, including design change pro-cedures, specificat'ons, drawings, and associated quality assurance documents, and by examination of installed fire protection equipment throughout the plant the inspector verified the licensee's implementation of scheduled modifications identified in the Safety Evaluation Report issued with Amendment No. 18.
a.
Codes and Standards
.
The. inspector verified that for comoleted fire protection related modifications, 'the~ design and installation of equipment is in accordance with the codes and standards of the National Fire
-
.
,
,
Protection ~ Association. All fire protection equipment is Under-writers Laboratories'and/or Factory Mutual itsted, b.
Quality Assurance The inspector reviewed " Quality-Assurance Procedure Appendix C, Fire Protection."' The inspector verified that the Itcensee has established quality assurance requirements for fire protection related. systems, structures and components, in accordance with the Branch Technical Position 9.5-1.
'
c.
Completed Modifications The inspector verified that the following modifications identified
,
in.section 3 of the Safety Evaluation Report have been completed.
The inspector verified that all automatic and manual suppression systems, and automatic fire detection devices alarm in the station control room.
s (1)
Item 3.3-2 Auxiliary Feedwater System and Item 3.3-3 Comoonent Cooling Water Pumos
The inspector reviewed Design Change Procedure OCP-268, sections 2, 4, 18, and 19: and test procedure Nos. T33-268-23 and 24; G TP-ET-1 and 2.
The inspector verified that tne licensee installed early warning smoke detection systems, pre-action sprinkler systems activated by heat detection de-vices, and curbs around each auxiliary feed water pump to contain oil spills.
(2)
Items 3.3-5 Cable Screading Area CS-1, CV-1. CV-2: 3.3-6 Cable Tunnel CV-3: 3.14 Charging Pumo Cubicle; 3.23 Intake Structure The inspector reviewed Design Change Procedure OCP 268 sections 3, 13, and 5: ER-268-3.
The inspector verified that the licensee installed a rapid access hatchway in the Cable Tunnel CV-3 and provided smoke detection devices in all of the subject areas.
(3)
Items 3.3-7 Hose Stations: 3.15-1 Booster Hose The-inspector reviewed Design Change Procedure OCP 268-1A and verified that the licensee has installed hose stations and provided additional lengths of hose at existing hose stations to ensure coverage of all areas housing ecuicment necessary for safe shutdown.
The inspector verified installation of hose reels and hose stations in the following areas:
.
.
Air conditioning equipment room,in stairway.
-
Control room,in stairway.
-
Cable Spreading room (CS-1),in stairway.
-
West and east cable vaults (CV-1 and CV-2) in the
--
stairwell between the vaults.
Primary auxiliary building (PA-1) at elevation 722.5
-
feet elevation 735.5 feet and elevation 752.5 feet.
Pipe tunnel areas of elevations 767 feet, 751 feet and
-
756 feet.
(4)
Item 3.5 Hydrant and Post Indicator Valve Guard Posts The inspector verified that the licensee installed guard posts to protect hydrants and valves from vehicular traffic.
(5)
Item 3:10 Turbine Oil Reservoir
-
The inspector verified that the licen.ees installed a curb beneath the turoine lube oil reservoir to contain the entire volume of the reservoir plus water discharged from the
_ fire protection system.
(6)
Item 3.11 Diesel Generator Rooms The inspector reviewed procedure R of the Cperating Manual Chapter 33 and determined that the licensee has developed a procedure to deenergize diesel fuel transfer pumps to limit diesel fuel spills in the diesel generator rooms.
The inspector verified the installation of a curb between the diesel generator rooms, the installation of an additional three hour rated fire door separating the diesel generator rooms, the installation of a level-detecting device in the sump near the day tank with annunciation in the control room on high sump level.
(
(7)
Item 3.13 Fire Rated Penetrations The inspector reviewed the following documents:
l Penetration Sealing Technology-by Chemtrol Corporation;
-
.
Training Program, General and Mediun Density Seals,
-
Chemtral Corporation;
~
,
,
.
,_
- - - -
.
-
.
'
5'
i Chemtrol Corporation' Procedure Manual, March 1, 1979;
-
General Work Practice Procedure GWP-3 for Maintenance
-
'
of Penetration Fire Carriers; Maintenance Manual Chapter 1, Section T, Special Ad-
-
ministrative Coritrols and Rules Part 1, Electrical
. Cable Penetration; The-inspector verified that the licensee upgraded fire wall penetrations between the cable spreading room and the control room benchboards, and between the diesel generator rooms to j
three hour rated fire l barriers.
The inspector noted that Chemtrol Corporation technicians are in the process of in-
i
. stalling and upgrading fire barrier penetration seals to three hour rated fire barriers, throughott the plant.
!
The inspector exa:nined quality assurance samples obtained in
.1980 and'1981 from the penetration sealant material, silicone'
r
'
foam manufactured by the Ocw Corning Corporation.
(3) Item 5.4.6 Halon Extinguishing System The inspector reviewed Design Change Procedure-CCP-268-ER-
11, Halon 1301 for Relay Panel and Process Instrument Room; Halon System Piping and Detector Test T-33-268-27, January i
'12, 1981.
The inspector verified that the licensee installed a Halon 1301 automatic total flooding' extinguishing system to pro-tect the under-floor cable area of the process instrument room.
Test results indicated that upon system activation a 5% concentration is reached within 10 seconds and the con-centration is maintained for at least 10 minutes.
d.
Modifications Not Comoleted I
(1)
Item 3.1-3 Procedures-Fire Fighting Strategies. The in-spector reviewed draft procedures for fire fighting strategies i
prepared by the licensee for several critical fire areas.
'
The licensee stated that the procedure will be issued by August 1981, and will be part of the fi-e brigade training program.
+
(2) The following items will be completed during the next re-
[
fueling:
[
Item 3.3-1 Containment Penetration Area
.
' Manually activated' water suppression system-Item 3.3-7 Centainment-
_
JAddition of hose stations
,
!
i s
.
,
__
_ _
.
...
- -.
.
.
- -
.
-.
m
_. - _ _
-
. - _.
.
Item 3.3-4 Residual Heat Removal Pump
.
Automatic Water Suppression system 4.
Review of Surveillance Test and Maintenance Records Associated with
' Technical Specifications Requirements a.
Surveillance Tests
.
The inspector selected anc reviewed the following records to verify that the associated required Fire Protection Program
- surveillances had been performed and acceptance criteria had been met.
- 0ST 1.33.9, Carbon Dioxide Fire Protection System Inspection
-
Test, January 19, 1980; OST 1.33.2, Fire Protection System Hose Station Test, December
-
'2, 1980; OST 1.33.3, Fire Protection System Drain Test, Decemcer~14,
-
1980; OST 1.33.8, Diesel Engine Driven Fire Pump Operation Test,
-
December 29, 1930; OST 1.33.7, Motor Driven Fire Pump Operational-Test, November
-
3, 1980;
-
OST 1.33.12, Fire Pumps Flow Test, April 8, 1981.
The inspector reviewed licensee Event Report LER 80-069/0IT-2 and noted that the electric motor drive of the fire pump has failed three times since February 26, 1980.
The electric motor was repaired once on site and twice off site.
The latest repair was concluded by Westinghouse and the pump was re-installed at the site in April,1981.
The exact cause of the three failures has net been determined.
The licensee is performing a reliability study.
A fire pump-test in accordance with operating surveillance test OST 1.33.12 was conducted on April 8, 1981.
The fire pump was placed back in; service upon completion of_ the test.
The inspector reviewed the test results and found them inconclusive based on the following:
The test did not include flow data at 157% of pump capacity,
--
as required by Code No. 20 of the National Fire Protection Association.
.
...
.
The net head at flows of 2500 gpm, 3000 gpm and 3500 gpm,
--
stayed essentially flat at approximate 11y 100 psi.
This may be indicative that the relief valve was lifting below the assumed setting of 150 psi.
The test did not include current and voltage readings as
--
required by NFPA Code No. 20.
The licensee stated that a possible relief valve malfunrtion is being investigated. Also some of the above data is ava 1;ble from the insurance carrier, and will be forwarded to the NRC.
This item is considered unresolved pending NRC review and evaluation of additional test data. (81-11-01)
b.
Maintenance Records
.The inspector reviewed the folicwing maintenance surveillance and
'
preventive maintenance records:
MSP33.03, Revision 2, Diesel Engine Driven Fire Pump Battery, 18 Month Inspection, Feburary 5, 1979; MSP33.04, Revision 2, Diesel Engine Driven Fire Pump Battery Quarterly, Inspection; C bruary 5,1979; e
MSP33.02, Revision.1, Diesel Engine Driven Fire Pump Lubrication
'4 and Inspection, March 28, 1979;
-
MSP33.01, Revision 1, Diesel Engine Driven Fire Pump Inspection and Maintenance.
T'echnical Specification Section 4.7.14.1.2.C.1 states in part:
"At least once per 18 months.
. Subjecting the diesel to an in-spection in accordance with procedure prepared..."
Procedures MSP33.01 and MSP33.02 state in part:
"The_ purpose of this procedure is to ensure that the diesel fire pump has been subjected to an inspection in accordance with procedures prepared
...This procedure is required to be performed at least once every 6 months. (MSP33.01)... every 18 months..."(MSP33.02)
Contrary to the above, diesel engine driven fire pump maintenance based on the above procedure has not been performed by the licensee during the past 18 months.
This item is consicered a violation (334/81-11-02).
,
e
.
.r.
-
._ _-
,
,
-
w-
-
,,.
.
..
~,;.,*
'8
.5.
Unresolved Items Unresolved' items areLmatters about which more information is' required to determine whether they are acceptable, items of noncompliance or deviations. An unresolved item is discussed in paragraph 4a.
6.
Exit Interview-The inspector met with the licensee representatives (Denoted in paragraph 1) at the conclusion of the inspection, on April 16, 1981 and summarized the purpose ano scope of the inspection findings.
.
.