U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-334/81-30 Docket No. 50-334 License No. DPR-66 Safeguards Groups IV Licensee:
Duquesne Light Company
,a
,
435 South Avenue
- 1*
2"NW (SIGfATLRE
/l 2 / //
d Pittsburgh, Pennsylvania 15219 tman.nlca; pir. 3 -
.
Facility Name:
Beaver Valley Power Station,' Unit 1 Inspection At:
Shippingport, Pennsylvania Inspection Conducted:
November 30-December 4, 1981 Date of Last Physical Protection Inspection: September 16-18, 1981 Type of Inspection: Rodine, U.nannounced Physical Protection Inspectors:
/
r
dE G.'C (Sm th, sical P tection Inspector date signed r
E bE.-
f s
R. H. Lad
,Q)fsical o ection Inspector d&te ' signed 6 2.
Approved By:
A. Tr Gody, Chief, Safeg ar Section, d' ate'si gned
~
Technical Inspection B a h Inspection Summary:
Routine, Unannounced Physical Protection on November 30-December 4, 1981 (Report No. 50-334/81-30)
l Areas Inspected:
Security Plan and Implementing Procedures; Security Organization (Management); Security Organization (Personnel); Security Organization (Response);
i J$
Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, ggc-and Combinations; Physical Barriers (Protected Areas); Physical Barriers (Vital oo Areas); Security System Power Supply; Lighting; Assessment Aids; Access Control M
(Personnel); Access Control (Packages); Access Control (Vehicles); Detection o
Aids (Protected Areas); Detection Aids (Vital Area); Alarm Stations; and-x Communications. The inspection involved sixty-two inspector hours onsite by
$g two NRC Regional-based inspectors. The inspection was initiated during gg regular working hours; six inspector hours were accomplished during offshift n
periods.
@@
Results: The licensee was found to be in compliance with NRC requirements in ma.o the 20 areas examined except for the following item:
Records and Reports-failure to record details of alarm responses.
.
.
WATuTING: SATF., GUARDS INFDD/ATION THE INFORMATION ON THIS PAGE IS-DEEMED TO BE S-F1-82-12 SECTION 147 ATOMIC TJmt;Y ACT 1954.
APPROPRIATE FOR PUBLIC DISCLOSURE' PURSUANT TO CopygfdCopies,
~
VIOLAT10FS OF DC PRomn03 10 CFR 73.21
'lPages REQUIRE 2iTS OF 10 CFR 73.21 THE REPORT DETAILS CONTAINISafeguards Information)