Text
.
-
,e
/
%,
UNITED STATES
I
NUCLEAR REGULATORY COMMISSION
a
$
<l
REGION I
- %
4
431 PARK AVENUE
%c....,o#
KING QP PRUSSIA, pef 4NSYLVANIA 194o4
June 2, 1981
Docket No. 50-334
&g M.d @,n
Duquesne Light Company
< f ,;,. ,, s
f,[,,[tf, , - E
ATTN: Mr. J. J. Carey
- c
-
.
Vice President
S.
Nuclear Division
.
_:
, S . r", ~
,,
Post Office Box 4
J
A-
""
"
Shippingport, Pennsylvania 15077
(C
u.t gl;;
\\?
Gentlemen:
%,
Subject:
Inspection 50-334/81-11
--
This refers to the routine safety inspection conducted by Mr. Peter S.
Koltay of this office on April 13-16, 1981 at Beaver Valley Power Station,
Unit 1, Shippingport, Pennsylvania of activities authori:ed by NRC uicense
No. OPR-66 and to the discussions of our findings held by Mr. Koltay with
Mr. H.P. Williams and other members of your staf f at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violacion, enclosed herewith as Appendix A.
This item of noncompliance has been categori:ed into the levels described
in the Federal Register Notice (45 FR 66754) dated October 7,1980.
You
are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Occument Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withnold such information from public disclosure.
Any such application must be acccmpanied by an affidavit executed by the
owner of tne information, which identifies the document or part sought to
be withheld, and which contains a statement of reasons which adcresses
f' o\\
.
>l
l
t
l
8106300 d
.
-
o
.
Ouquesne Light Company
-2-
June 2, 1981
with specificity the items which will be considered by the Commission as
listed in subparagraph (b) (4) of Section 2.790. The information sought to
be withheld shall be incorporated as far as possible into a separate part
of the affidavit.
If we do not hear from you in regard within the specified
period, the report will be placed in the public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
'
)
s
1
,l
l t z)
99
Themas T. Marti . Chief, En ineering
Inspection Branch, Division of
Engineering and Technical
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-334/91-11
cc w/encls:
F. Bissert, Technical Assistant Nuclear
R. Washabaugh, QA Manager
Station Superintendent
General Superintendent, Power Stations Department
R. Martin, Nuclear Engineer
J. Sieber, Superintendent of Licensing and Compliance, BVPS
T. D. Jones, Nuclear Operations
R. M. Mafrice, Nuclear Engineer
N. R. Tonet, Manager, Nuclear Engineering