IR 05000328/1980035

From kanterella
Jump to navigation Jump to search
Staff Requirements Memo Directing Staff to Evaluate Hydrogen Control Issue,Requesting Draft Insp Rept 50-328/80-35 Info on Status of Installation of Reactor Vessel Vents on French Reactors
ML20002A576
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 08/25/1980
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20002A573 List:
References
SRM-M800821, NUDOCS 8011200165
Download: ML20002A576 (2)


Text

v

.

.-

.

.

ACTION: Denton/Stello

  • ryt;pur,*%j

-

-

o

.

Cys: Dircks UNITED STATES Cornell

-

NUCLEAR REGULATORY COMMISSION n

f ' 3.m Rehm waswiscros, o.c. 2csss U

2x-l Shapar t

  • .... #'e Shea

'% "

gg33 August 25, 1980 In response please o,,ies o,,g, refer to SRM M800821 scener4ny MEMORANDUM FOR:

William J. Dircks, Acting EDO FROM:

Samuel J. Chilk, Secreta '

i I SUBJECT:

STAFF REQUIREMENTS - DI5CUS ION OF SEQUOYAH FULL POWER LICENSE, 2:15 P.M., THURSD

, AUGUST 21, 1980, COMMISSIONERS'

CONFERENCE ROOM, D. C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

i The C[mmission* was briefed by staff on the review and recomendations on the

'

proposed operating license, transmitted by the Director, NRR on August 20, 1980, for the Sequoyah Nuclear Station, Unit 1.

T e Comission:

1.

requested a staff evaluation and briefing on options in hydrogen

- lg control, including containment spray, use of igniters, filtered venting, f

,

=

use of halon, results of TVA studies (expected the end of September),

,K f

j results of NRC research at Sandia, Brookhaven, Battelle and LLL

,

(expected the end of October), and recomendations from the ACRS;

(NRR) (SECY Suspense: }ff80) c %--

,

y 2.

requested a copy of the draft inspection report (80-35) concerning

the withholding of information by TVA; (Comissioner Gilinsky's request)

(IE)(SECY Suspense: 8/26/80)

3.

requested infomation on the status of the installation of reactor vessel vents on French reactors; (NRR) (SECY Suspense: 9/30/80)

_.

4.

deferred a decision on approving the license for full power operation, pending ACRS Comittee and Subcomittee meetings scheduled through September 4,1980; (Subsequently, a Commission Meeting was scheduled for September 5);

y 5.

.ated that staff will be preparing a supplement on the S-3 fuel cycle impacts.

CC:

Chaiman Ahearne Comissioner Gilinsky Comissioner Hendrie Comissioner Bradford Comission Staff Offices

  • Comissioner Bradford was not in attendance.

-

Q EDo

\\

eluho 8011200 /(f

...

. -... :..

.=.

-

....

-...

-..

.

.

,

.

r,.

.

..

I DISTRIBUTION-Docket File 50-327/328

,

NRC PDR Local PDR NRR Reading

!

"

-LB#2 File H. Denton

'

E. Case H. Berkow/'4 Russell D. Eisenhut R. Tedesco lR. Purple i

I A. Schwencer C. Stahle

.

M. Service (w/cy of inc.)

i S. Cavanaugh (NRR-4291)

E. Hughes (w/cy of inc.)

M. Fudge Snyder Vollmer Ross

!

Hanauer

Schroeder

I

,

i t

J s

u

'

-

.

i

..

_

_

. - _ - -

.. _. ~.. _.

_.

.

.._,_-_._ _..

,

,,.__ _.. __. _, _ _