_ _ _ _ -
..
__
... _. _. - _.
.. _ _
.
800508001 4
.!
/
'o,,
UNITED STATES l; ]' 8 NUCLEAR REGULATORY COMMISSION c.
$
E REGION 11 j
-
g*[
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303
,
MAR 211980
'
.
!
Report No. 50-328/80-02 Licensee: Tennessee Valley Authority 500A Chestnut Street Tower II Chattanooga, TN 37401 Facility Name: Sequoyah Nuclear Plant Unit 2 Docket No. 50-328 License No. CPPR-73 Inspection at Seg,uoy h site near Chattanooga, TN Inspectors:
,!
TMd
'b/>/[fd T. D.' Gibbons Date Signed
- AA skhs N. Merriweather (Intern)
Date Signed Approved by d>
8 " N '* [ O T. E. Conlon, Section Chief, RCES Branch Date Signed SUMMARY Inspection on March 5-7, 1980 Areas Inspected This routine, unannounced inspection involved 42 inspector-hours on site in the areas of Instrumentation work, work activities, and Quality records, Inspector followup items.
Results
,
-Qf the areas inspected, no items of noncompliance or deviations were identified.
..
%
,
)
.
I t,
.
.
___
._
_
_
,
e
N DETAILS 1.
Persons Contacted Licensee Employees
- G. G. Stack, Project Manager
- T. B. Northern, Jr., Project Engineer
- G. B. Lubinski, Electrical Engineering Unit Supervisor
- J. M. Munns, Supervisor QA Unit NRC Resident Inspector S. Butler
- Attended exit Ir.terview 2.
Exit Interview The inspection scope and findings were summarized on March 7, 1980 with those persons indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings
' Not inspected.
.
4.
Unresolved Items Unresolved items were not identified during this inspection.
.
.5.
Instrumentation (Components and Systems I) Observation of Work and Work Activities i
The inspector selected three pressure switches which can cause the reactor trip. The switches 2PS-47-73, 74 and 75 monitor turbine oil pressure. Two i
flow transmitters 2-FT-70-81B and E and one flow indicating switch 2-FIS-70-81 i
which sense component cooling water flow to the reactor coolant pump thermal F
b,arrier were also selected. The above instruments were inspected to assure
'
compliance with the SAR and QAM requirements in the areas of identification,
- _. -
location, supports, protection, inspection, separation, and nonconformance
-
control.
Within the areas examined there were no items of noncompliance identified.
!
l 6.
Instrumention (Components and Systems I) Review of Quality Records The inspector selected the three instruments 2FT-70-81B & E and 2-F15-70-81 for a review of Quality records to assure that the requirements of the FSAR
,
^
.
l
,
,
_
_
--
-
. _. _
_ _ _ _.. _. _ _
_
'
.
- q-2-i
,
and QAM were complied with in the areas of receiving inspection, test i
reports, vendor records, storage handling; cleanliness, identifi.ca. tion, j
,
installation, inspection and inspection records.
Within the areas examined there were no items of noncompliance identified.
7.
(Closed) Inspector Followup Item 79-29-01 Sensing Line Separation. The licensee has completed the installation.
,
Nonconformance Report (NCR) 2004 has been issued, dispositioned nad closed.
l The NCR identified a minor, separation problem on the sensing lines.
Design Engineering has evaluated the item. The inspector examined the installation and the documentation. This item is closed.
8.
(Closed) Inspector Followup Item 80-01-01 Proventive maintenance for electric motors. The inspector reviewed the licensees action on this item. The two pump motors 2-MTRB-70-59A and 2-MTRB-70-33B were used to supply water for flushing during the period September 1977 and April 1978. The operation of the pumps negated the necessity for motor rotation.
The motors were released to Power Production and are in service. The Control Rod Drive Cooling fans 2-MTRB-30-80B and 2-MTRB-30-88A are 75 horsepower motors which are excluded from the motor rotation program required by procedure P-6.
This item is closed.
i l
.
%
\\
.
.
'
.
s -
e O
.
.
t
.
.
_