IR 05000275/2006006

From kanterella
(Redirected from IR 05000323/2006006)
Jump to navigation Jump to search
IR 05000275-06-006, and IR 05000323-06-006, 10/16/2006 - 11/16/2006, Diablo Canyon Power Plant, Security Baseline Inspection - Letter Only
ML063410565
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/06/2006
From: Shannon M
Plant Support Branch Region IV
To: Keenan J
Pacific Gas & Electric Co
References
IR-06-006
Download: ML063410565 (2)


Text

ber 6, 2006

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2006006 AND 05000323/2006006

Dear Mr. Keenan:

On November 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on November 16, 2006, with Michael Meko, Site Services Director and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. SECURITY - RELATED INFORMATION SECURITY - RELATED INFORMATION Pacific Gas and Electric Company -2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information - Withhold under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82 Nonpublic Enclosure: Inspection Report 05000275/2006006 and 05000323/2006006 w/Attachments: Supplemental Information cc w/encl:

Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Richard F. Locke, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 SECURITY - RELATED INFORMATION