IR 05000275/2006014
Download: ML062570497
Text
UNITED STATES NUCLEAR REGULATORY C 0 M M ISS IO N REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 September 13, 2006 John Senior Vice President - Generation Pacific Gas and Electric Company P.O. Box 770000 Mail Code B32 San Francisco, CA 941 77-0001 and Chief Nuclear Officer SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2006014 AND 05000323/2006014
Dear Mr. Keenan:
On August 2, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on August 2, 2006, with Mr. Mike Meko, Site Services Director, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified. In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.aov/readina-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. J. In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Gregory \BGrerner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82
Enclosure:
NRC Inspection Report 05000275/2006014 and 05000323/2006014 ( ) cc wifhouf Safeguards Information enclosure: Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 SAFEGUARDS INFOR