ML20206A821
| ML20206A821 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/08/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20206A823 | List: |
| References | |
| NUDOCS 8811150270 | |
| Download: ML20206A821 (2) | |
See also: IR 05000321/1988030
Text
'
.
,
.
.
l
r
-
.
ocd
-
-
,
Y0 8 hw
.
Docket Nos. 50-321 and 50-366
t
/ eorgia Power Company
ATTH: Mr. W. G. Hairston Ill
Senior Vice President-
Nuclear Operations
P.O. Box 1295
Birminonam, AL 35201
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-321/88-30 AND 50-366/88-30)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Messrs. J. Menning, R. Musser, and C. Patterson on September 24 - October 21,
1988. The inspection included a review of activities authorized for your Hatch
facility.
At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed Inspection Report.
Areas 4 xamined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnal, and observation of
activities in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
Two violations, references to pertinent requirements, and elements to
be included in your response are presented in the enclosed Notice of Violation.
However, because all of the criteria for the categorization of licensee-
identified violations were met in one instance, a third violation is not
being cited.
The deta'Is pertaining to this licensee-identified violation are
described in the enclosed Inspection Report.
in accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10 Code of Federal Regulations, a copy of this latter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Badget issued under the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
$$bb0hn
\\\\
C
- - - - - - -
-
?/
'
.
.
.
.
I
/
.
.
NOV 0 81933
Georgia Power Company
2
Should you have any questions :oncerning this letter, please contact us.
Sincerely,
S4
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
vR. P. Mcdonald, Executive Vice President,
Nuclear Operations
W . T. Beckham, Vice President, Plant Hatch
vfl. C. Nix, General Manager, Plant Hatch
f.M.Fraser,SiteQualityAssurance
Manager
vt. T. Gucwa, Manager, Nuclear
Safety and Licensing, Plant Hatch
VJ. P. Kane, Manager Licensing
and Engineering
-S
B. Tipps, Manager of Nuclear
Safety and Compliance
>
State of Georgia
bSc w/encis:
vC. P. Crocker, NRR
M, V. Sinkule. RII
i
vFRC Resident Inspector
ORS Technical Assistant
Document Control Desk
[
LTrocine:tm
MSink e
11/ T' /88
11/
/88
l