IR 05000280/1980017
| ML19330C292 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/17/1980 |
| From: | Gillespie F, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19330C288 | List: |
| References | |
| 50-280-80-17, 50-281-80-23, NUDOCS 8008080189 | |
| Download: ML19330C292 (1) | |
Text
7,
g.g_ g 7.....-,......,. 3
.
,ne.
C w...,.J.5 2.h., :...
l3!1
'
o UNITE 3 STATES
g NUCLEAR REEULATORY COMMISSION o
m
,(
! g
.t REGION 11
,
'
4 o
101 MARIETTA $T N.W., SulTE 3100 AT3 ANT, GEORGIA 30303 U d181980
.....
Report Nos. 50-280/80-17; 50-281/80-23 Docket Nos. 50-280; 50-281 License Nos. DPR-32; DPR-27 Licensee: Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261 Facility Name: Surry Nuclear Station Units 1 and 2 Inspection at: Surry, Virginia Inspection conducted: May 27-30, 1980 Date of Last Physical Security Inspection Visit: August 3, 1979 Type of Inspection: Unannounced Physical Security Inspe A b6
/7[En D. E. no
'
" ~
Dati
- ~
,
_
Approved by:
t
'$///
b/[Jf8'O
~
e F. P. Gi1I'espie, 'Apting Chief Dat6 Security Section /
Inspection Summary Areas Inspected:
Included review of security program audit; security organiza-tion; protected and vital areas barriers; access control (identification, badging and authorization); access control (vital area); access control (escorting) and communication controls.
The inspection involved 22 inspector hours on site by one NRC inspector. The inspection was begun during an offshift period; four inspection hours were accomplished during offshif t periods.
Results:
Of the areas inspected, no apparent items of noncompliance were disclosed in seven areas; one apparent item of noncompliance was identified in one area.
Access Control - Failure to maintain positive control of personnel during major outage (281/80-23-01).
s_r2 xn
-m copy of Cepica f
Peces This Docuror:t is not to be reproduced withcut spesifis C5EhC0ik... c.m :an..m.[Ti5ilU.TliIN SPProvn1 cf IE:II 8008080Id
.
-
-