ML19330C289

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-280/80-17 & 50-281/80-23 on 800527-30 & Notice of Violation.Notice of Violation & Details of Insp Withheld (Ref 10CFR2.790)
ML19330C289
Person / Time
Site: Surry  
Issue date: 06/18/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19330C288 List:
References
NUDOCS 8008080185
Download: ML19330C289 (2)


See also: IR 05000280/1980017

Text

. _ - _ _ _ _ _ ____.

_.

R

6

MATr!T.L TRf!'N OO77H

_'

%q'o

C;;;il.:::S If.3

?:..".D

i

(L')

g

UNITE 3 STATES

NUCLEAR REGULATORY COMMISSION

n

y,

E

REGION ll

i

o

101 MARIETTA ST

N.W., SulTE 3100

Y

ATLANTA, GEoRotA 303o3

g.....

In Reply Refer To:

FIN j ] jgg

RII:DEM

'

50-280/80-17

50-281/80-23

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by D. E. Moore of this office on May 27

through 30, 1980, of activities authorized by NRC Operating License Nos. DPR-32

and DPR-27 at Surry Nuclear Station and to the discussions of our findings held

with J. L. Wilson at the conclusion of the inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Federal Regulations, Part

73, " Physical Protection of Plants and Materials" and the specific requirements

of your approved Security Plan. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, performance tests, and observations by the inspe tor.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

-date when full compliance will be achieved. Details of activities involving

safeguards and security measures are exempt from disclosure in accordance with

,

10 CFR 2.790(d). Therefore, your response should be incorporated in a separate

paper and referenced in your reply.

I

'

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title ~ 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosures

to this letter _with the exception of the report cover page, which is an inspection

summary, will not be placed in the Public Document Room.

8008080IF5

E M N "" " " ' "

'

CEES EC-:J'.E3

m-

. . . _ _

._.

l'f

k

~

ETERifiT"'"~!N:3 P!D' NTH

.

.

C0liTI.!!:3 23'R:TZ.D.Ita:1

-.

-

"-

1, . .

Virginia Electric and Power Company

-2-

Should you'have any. questions concerning this letter,-we will be glad to discuss

them with you.

Sincerely,

j/\\

, )h.. Kev

Safeguard p Branch

Enclosures:

1.

App % dix A, Notice of Violation

(Exempt from Disclosure).

7.

-Inspection Report Nos. 50-280/80-17

. and 50-281/80-23

3.

Inspection Summary

(Not Exempt)-~

cc w/ enc 1:

J. L. Wilson, Manager

.

e

9

n

f

i

4

e

ee

4

_ .

.

.

. C0:iTAli;S 2.E21;E;3.XT10N

j

.-