U.S. NUCLEAR REGULATORY COMMISSION
REGION I
M-50-272/87-22 M-50-311/87-23 Report No M-50-354/87-18 50-272 50-311 Docket N DPR-70 DPR-75 License N NPF-50 Priority ---
Category ---
Licensee:
Public Service Electric and Gas P.O. Box 236 Hancocks Bridge, New Jersey 08038-4800 Facility Name:
Salem Generating Station and Hope Creek Generating Station Inspection At:
King of Prussia, Pennsylvania P EP&RPB, DRSS date
~*
c:G:A tD,EP$,EP&RPB, DRSS
//.~8-7--
date
~
Approved by:
~//o7 date Meeting Summary:
Meeting n July 16, 1987 (Combined Meeting Report Nos. 50-272/87-22, 50-311/87-23 and 50-354/87-18)
Areas Discussed:
Consolidated Emergency Plan, Administrative, Security and Implementing Procedures for Artificial Island and Public Service's interim training progra PDR ADOCK 05000272 G
PDR I
DETAILS 1.0 Persons Attending C. Adams, Manager, Emergency Preparedness, Artificial Island C. Amato, EPS, NRC, RI E. Fox, Sr. EPS, NRC, RI C. Gordon, EPS, NRC, RI W. Weekstein, Supervisor, Emergency -Preparedness Training, Public Service Electric and Gas Summary The consolidated plan does not change the plan or procedure It is a consolidation, and reorganization of material with respect to the plan procedures, and facilities. In addition, administrative, security and media center procedures have been placed in separate volume.2 A single, composite of accident assessment is given in Section 10 of the emergency plan ar.d equipment and communications requirements have been ~onsolidated into single schedule.3 Nuclear Fuel Damage group has been moved from the EOF to the TSCs for the respective station, however, an Engineering Group remains in the EOF and responds to TSC request.4 Evacuation Time Estimates have been updated per NUREG-0654 and are related to sectors and distanc This format is compatible with the geopolitical Emergency Response Planning Area concep The format permits conversio.5 Consolidated Artificial Island (AI) EP and EPIPs were distributed, then interim training was begu The AI EP and EPIPs are now in effect and have been sent to the NRC per 10 CFR 50.54(q).
2.6 Offsite personnel do not require interim training in the consolidated AI EP and EPIP, however, plan sets have been sent to the States and Countie.7 Training groups were identified and specific training began during Jun All personnel should be trained by the beginning of September 198 Lesson plans were developed on a generic basis and flow charts for operational personnel were also develope Site non-essential personnel training for accountability was given last Februar.8 The interim AI EP and EPIPs training is objective i.e. information is given and 11 hands-on 11 practical training is beginnin There are no exams ye These will be given during initial qualification for new hires and requa *
2.9 In 1988 and thereafter all exercises will be run from one of the two training center_ s-imul a tor The 1987 Hope Creek exercise wil 1 be based on the consolidated AI EP and EPIPs.