IR 05000354/1998302 | 13 October 1999 | Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 | Job Performance Measure |
IR 05000354/1999005 | 1 October 1999 | Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification | Safe Shutdown Fire Barrier Fire impairment Significance Determination Process Operability Determination Maintenance Rule Program Continuous fire watch Fire Watch Hourly Fire Watch |
PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power | 16 September 1999 | PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power | |
IR 05000354/1999004 | 11 August 1999 | Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification | |
IR 05000354/1999003 | 21 June 1999 | Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Operability Determination |
IR 05000354/1999002 | 14 May 1999 | Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support | Shutdown Margin Condition Adverse to Quality Corrosion bonding Double blade guide |
IR 05000354/1999001 | 19 April 1999 | Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support | High Radiation Area Nondestructive Examination Missed surveillance Foreign Material Exclusion Excess Flow Check Valve |
IR 05000272/1999001 | 1 April 1999 | Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown High Radiation Area Fire Barrier Condition Adverse to Quality Maintenance Rule Program Biofouling Unidentified leakage |
IR 05000354/1998011 | 22 December 1998 | Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support | Packing leak High Radiation Area Operability Determination |
PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal | 1 December 1998 | PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal | |
ML20196D091 | 23 November 1998 | Notice of Violation from Insp on 980920-1031.Violation Noted:On 981001,electricians Placed Single Degraded Cell Associated with Operable 1E Battery Bank on Single Cell Charge | |
IR 05000354/1998010 | 23 November 1998 | Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering | High Radiation Area Temporary Modification Operability Determination Maintenance Rule Program |
PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie | 16 November 1998 | PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie | |
ML20154Q738 | 16 October 1998 | Second Suppl to NRC Exam Rept 50-354/98-03OL for Tests Administered on 980304-12,0519-21,22-28 & 0629.Five of Five Reactor Operator Applicants & Four of Five Senior Reactor Applicants Passed Exams | |
IR 05000354/1998008 | 9 October 1998 | Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | High winds Shutdown Margin High Radiation Area Temporary Modification Condition Adverse to Quality Operability Determination Downpower |
ML20154J861 | 9 October 1998 | Notice of Violation from Insp on 980809-0919.Violation Noted:On 980831,licensee Did Not Promptly Correct Condition Adverse to Quality in That 'C' Residual Heat Removal Pump Rendered Inoperable | Condition Adverse to Quality |
IR 05000354/1998009 | 2 October 1998 | Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Temporary Modification Emergency Lighting Battery sizing Fire Protection Program |
IR 05000354/1998301 | 4 September 1998 | Exam Rept 50-354/98-301OL Conducted on 980810-12.Exam Results:Four SRO Candidates Performed Well on Both Written & Operating Portions of Exam.All Four Were Issued Licenses | High Radiation Area Half scram Temporary Modification B.5.b Scram Discharge Volume Earthquake Failure to Scram |
ML20237E498 | 25 August 1998 | Notice of Violation from Insp on 980628-0808.Violation Noted:As of 980810,util Had Not Corrected Known Deficiency in Verifying MSIV Full Closed During Springs Only Full Stroke Closing Tests | |
IR 05000354/1998007 | 25 August 1998 | Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Ultimate heat sink Emergency Lighting Process Control Program Operability Determination Fire Protection Program |
IR 05000354/1998006 | 21 July 1998 | Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Hot Short Boric Acid Enforcement Discretion Operability Determination |
ML20236T160 | 21 July 1998 | Notice of Violation from Insp on 980517-0627.Violation Noted:As of Oct 1997,chemistry Technicians Did Not Sample & Analyze Diesel Fuel Oil Deliveries for Particulates & Did Not Report Results by Written Notification within 14 Days | |
IR 05000272/1998202 | 9 July 1998 | Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities | |
IR 05000354/1998003 | 16 June 1998 | Suppl to NRC Licensing Exam Rept 50-354/98-03OL (Including Completed & Graded Tests) for Tests Administered on 980223- 0304 | |
IR 05000354/1998080 | 10 June 1998 | Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering | Safe Shutdown Unanalyzed Condition Ultimate heat sink Temporary Modification Emergency Lighting Condition Adverse to Quality Missed surveillance Operability Determination Battery sizing Fire Protection Program |
ML20249A203 | 10 June 1998 | Notice of Violation from Insp on 980223-0319 & 0427-30. Violation Noted:Conditions Adverse to Quality Were Not Promptly Identified & Corrected | Unanalyzed Condition Emergency Lighting Condition Adverse to Quality Fire Protection Program |
IR 05000354/1998099 | 8 June 1998 | SALP Rept 50-354/98-99 for Period of 961110-980516 | Shutdown Margin Reactor Vessel Water Level High Radiation Area Temporary Modification Emergency Lighting Systematic Assessment of Licensee Performance Fire Protection Program |
IR 05000354/1998005 | 4 June 1998 | Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Ultimate heat sink Excess Flow Check Valve Scaffolding |
ML20249A107 | 4 June 1998 | Notice of Violation from Insp on 980405-0516.Violation Noted:During Refueling Outage RF03 in Dec 1990 Licensee Did Not Maintain RHR Sys in Operation | |
ML20217M049 | 28 April 1998 | NRC Operator Licensing Exam Rept 50-354/98-03OL,(including Completed & Graded Tests) for Tests Administered on 980223-0304 | |
ML20217N622 | 24 April 1998 | Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects | |
IR 05000354/1998002 | 23 April 1998 | Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program | Fire Barrier Temporary Modification Operability Determination Continuous fire watch Fire Protection Program Fire Watch Overexposure |
ML20217H805 | 23 April 1998 | Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure | Temporary Modification Scaffolding |
ML20217C671 | 20 March 1998 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 971112,while Reactor Was in Cold Shutdown W/Rv Head Removed,Operators Did Not Verify That CR Position Did Not Change During Withdrawal | Safe Shutdown Shutdown Margin |
ML20217D829 | 17 March 1998 | EN-98-013:informs That NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 Will Be Issued on or About 980330 to Pse&G.Civil Penalty Based on Violation Involving Failure by Operating Crew to Follow Procedures | Shutdown Margin |
IR 05000354/1998001 | 16 March 1998 | Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Hydrostatic Past operability Condition Adverse to Quality Excess Flow Check Valve Operability Determination Scaffolding Grace period Operability Assessment |
ML20199L479 | 3 February 1998 | Notice of Violation from Insp on 971126-980103.Violation Noted:On 971124,maint Technicians Failed to Follow HC.IC-DC.ZZ-0140(Q),Rev 3, Device/Equipment Calibration Masonleilan Pressure & Temperature Controllers | |
ML20199L532 | 3 February 1998 | Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Half scram Ultimate heat sink Enforcement Discretion Anchor Darling Temporary Modification Condition Adverse to Quality |
ML20197D211 | 10 December 1997 | Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs | Unanalyzed Condition Fitness for Duty Shutdown Margin Ultimate heat sink Non-Destructive Examination Weld Overlay Condition Adverse to Quality Foreign Material Exclusion Scram Discharge Volume Through Wall Leak |
ML20199D343 | 13 November 1997 | Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support | Half scram Weld Overlay Hydrostatic Nondestructive Examination Temporary Modification VT-2 Design basis earthquake Scram Discharge Volume Earthquake Liquid penetrant Through Wall Leak Grace period |
ML20199D317 | 12 November 1997 | Notice of Violation from Insp on 970824-1004.Violation Noted:On 970914,electric motor-driven Fire Pump Supply Breaker Opened During Electrical Bus Swap Which Rendered Pump Inoperable | Reactor Vessel Water Level Condition Adverse to Quality |
ML20196J653 | 20 October 1997 | Notice of Violation from Insp on 970202 & 0317.Violation Noted:In Apr 1994,licensee Made Changes to Facility That Involved USQ Without Prior Commission Approval | |
ML20198L953 | 15 October 1997 | NRC Operator Licensing Exam Rept 50-354/97-08OL for Tests Administered on 970929-1002.Exam Results:Four Candidates Passed All Portions of License Exam.One Candidate Failed Written Exam | Reactor Vessel Water Level Job Performance Measure |
IR 05000354/1997005 | 15 September 1997 | Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support | |
IR 05000354/1997006 | 4 September 1997 | Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering | Ultimate heat sink Enforcement Discretion Biofouling |
ML20210N913 | 11 August 1997 | Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Ultimate heat sink Temporary Modification Foreign Material Exclusion Process Control Program Power change |
ML20210N906 | 11 August 1997 | Notice of Violation from Insp on 970601-0712.Violation Noted:Inoperable HPCI Sys Injection Valve Was Not Promptly Identified | |
ML20217E785 | 25 July 1997 | Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept | |
ML20140J381 | 12 June 1997 | Notice of Violation from Insp on 970429-0531.Violation Noted:Failing to Adhere to Established Procedural Guidance for safety-related Activities Were Identified,Significant Condition Adverse to Quality | Condition Adverse to Quality |
ML20140J387 | 12 June 1997 | Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Temporary Modification Condition Adverse to Quality Annual Radiological Environmental Operating Report Scaffolding |