IR 05000269/1979021

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/79-21,50-270/79-19 & 50-287/79-21 on 790807-09.No Noncompliance Noted
ML19249E978
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/23/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
DUKE POWER CO.
Shared Package
ML19249E970 List:
References
NUDOCS 7910020818
Download: ML19249E978 (2)


Text

.

.

/

~

o UNITED STATES g

NUCLEAR REGULATORY COMMISSION o

,

$

i REGION ll

'#

o, 101 MARIETTA ST N.W., SUITE 3100

%.....o ATLANTA, GEORGIA 3o3o3 In Reply Refer To:

AUG 2 31979 RII:NE 50-269/79-21 50-270/79-19 50-287/79-21 Duke Power Company Attn:

W. O. Parker, Jr.

Vice President, Steam Production Pcst Office Box 2178 Cnarlotte, North Carolina 28242 Gentlemen:

This refers to the inspection conducted by Nick Economos of this office on August 7-9, 1979 of activities authorized by NRC License Nos. DPR-38, DPR-47 and DPR-55, for the Oconee Nuclear Plant facility, Unit Nos. 1, 2 and 3, and to the discussion of our findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be exartir.ed during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) Felieve to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public. disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained lj74054 ge1002

/8

.

.

Duke Power Company-2-AUG W 31979

.

in a separate part of the document.

If we do not bear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions courerning this letter, we will be glad to discuss them with you.

Sincerely,

}

-

r C. E. Murphy, ef Reactor Construction and Engineering Support Branch Enclosures:

Inspection Report Nos. 50-269/79-21, 50-269/79-19 and 50-287/79-21 cc w/cnclosures:

J. E. Smith, Station Manager Post Office Box 1175 Seneca, South Carolina 29678 1074 055

.