IR 05000269/1979020
| ML19263E584 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/20/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19263E578 | List: |
| References | |
| NUDOCS 7906200120 | |
| Download: ML19263E584 (2) | |
Text
'
'
.
.
UNITED STATES
- 8800g NUCLEAR REGULATOFiY COMMISSION o,h
.
+
[
REGloN il p
101 M ARIETTA STREET.N.W.
9 r
ATLANTA, GEORGIA 30303 o,s,*****/
APR 2 01979 In Reply Refer To:
RII:JAD 50-369/79-R Go Duke Power Company ATTN:
W. O. Parker, Jr.
Vice President, Steam Production P. O. Box 33189 Charlotte, NC 28242 Gentlemen:
This refers to the inspection conducted by J. A. Dyer of this office on March 27-29, 1979, of activities authorized by NRC Construction Permit No.
CPPR-83 for the McGuire Facility Unit 1, and to the discussion of our findings held with M. D. McIntosh at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of proceJures and representative records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be p rop rie ta ry, it is necessary that you make a written applicatice within 20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
2288 277 790620012.o
.,
.
.
.
.
APR 2 01979
.
Duke Power Company-2-Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,
MA-f Richard C. Lewis, Acting Chief Reactor Operations and Nuclear Support Branch Enclosure:
Inspection Report No. 50-369/79-19 cc w/ encl:
M. D. McIntosh, Plant Manager P. O. Box 488 Cornelius, NC 28031 J. C. Rogers, Projec'. Manager P. O. Box 33189 Charlotte, NC 28242 2288 278
.